Petrochina (Halfaya)
CONTENT
1.0 SCOPE......................................................................................................................3
11.0 OTHERS....................................................................................................................9
HALFAYA PROJECT SURFACE FACILITY
Petrochina (Halfaya)
1.0 SCOPE
This specification is for BNS fittings, including elbow, tee, reducer and cap. All the fittings
shall be matched with BNS piping material.
<
The mother pipe to manufacture the fittings with OD 508mm must meet the requirements
of HFY-PIP-SP-00009. (Technical specification for BNS seamless piping material)
The mother pipe to manufacture the fittings with OD≥508mm must meet the requirements
of HFY-PIP-SP-00011. (Technical specification for BNS SAWL piping material)
As a rule, all the finished products shall be subjected to heat treatment to relieve residual
stress.
Any forged steel fittings which have not been normalized or normalized and tempered
shall be rejected.
HALFAYA PROJECT SURFACE FACILITY
Petrochina (Halfaya)
Unless otherwise specified, the bevels at the weld ends shall be as per ASME B16.25.
Surface of the bevel shall be performed with lamination imperfection inspection using
magnetic particle according to ISO13664; imperfection that ≥6mm on circumferential
direction is not allowed.
All the test samples shall be taken from the finished fittings which have carried out the
stress relief process.
The sampling point of test samples shall be as per the following table 1, table 2 and figure
1, figure2, figure 3. When the mother pipe to manufacture the fittings is SAWL welded pipe,
all the mechanical tests shall add samples taken from the welded and heat affected zone.
impact test × × × × × ×
bend test × × × × × ×
Five points: the circle of main pipe Five points: the circle of outer-arc
(equidistance) ridge (equidistance)
Five points: the circle of branch pipe Five points: the circle of inner-arc
hardness test
(equidistance) ridge (equidistance)
Five points: the circle of intersecting Five points: the circle of central line
zone (equidistance) (equidistance)
HALFAYA PROJECT SURFACE FACILITY
Petrochina (Halfaya)
impact test × × × × × ×
bend test × × × × × ×
Five points: the circle of large
end (equidistance)
Five points: the circle of transition coil
Five points: the circle of small (equidistance)
hardness test
end (equidistance)
Five points: the circle of
transition zone (equidistance)
Petrochina (Halfaya)
DWT test shall be performed when the outside diameter of the fittings is larger than
508mm. DWT test pieces shall be prepared in accordance with API RP 5L3. The test
℃
temperature shall be -10 , and the samples shall be taken from the pipe body . For
≥
each test (of a set of two test pieces), the average shear fracture area shall be 85%.
HALFAYA PROJECT SURFACE FACILITY
Petrochina (Halfaya)
Hardness test shall be carried out, and the maximum hardness at any position shall be
not higher than 220HV10.
The guided-bend test shall be performed in accordance with ASTM A370 or ISO 8491,
when the outside diameter of the fittings is larger than 508mm.
The test pieces shall not:
a. fracture completely
b. reveal any cracks or ruptures in the weld metal longer than 3.2mm, regardless of
depth, or
c. reveal any cracks or ruptures in the parent metal, HAZ or fusion line longer than
3.2mm or deeper than 12.5% of the specified wall thickness.
Sulfide Stress Cracking (SSC) and Hydrogen Induced Cracking (HIC) test shall be
carried out according to the following requirements. The samples shall be taken from the
pipe body, the weld seam and the HAZ when the pipe is SAWL welded pipe.
Product certificate test shall be carried out to the first heat from the former 3 heat steels
and every 10 heats latter.
NACE TM0284-2003 shall be adopted.
Test solution: solution A. Test duration: 96 hours.
The average value of three sections of each test specimen shall not exceed the following
index.
( )
Crack length rate CLR ≤15%,
)
Crack thickness rate (CTR ≤5%,
Crack sensitivity rate(CSR)≤2%.
The number and area of hydrogen blister on the surface of test specimen shall be
reported with macrograph or drawings of all cracks.
HALFAYA PROJECT SURFACE FACILITY
Petrochina (Halfaya)
Photos or drawings of hydrogen blister on the surface of test piece shall be attached to
the test report.
Product certificate test shall be carried out to the first heat from the former 3 heat steels
and every 10 heats latter with the same heat treatment process.
Four-point bending test specimen shall be adopted as per ISO 7539-2 or ASTM G39 and
test be carried out according to NACE TM0177-2005.
Test solution: NACE TM0177 solution A. Stress to be loaded in the test: 90%SMYS
(specified minimum yield strength). Test duration: 720 hours.
Acceptance index: stretching plane of test specimen to be inspected by low power
microscope under 10 times magnifying, and shall have no cracking or breaking fracture.
a. Prototype fittings that are representative of production and selected for test shall be
identified as to material, grade, and lot, including heat treatment. They shall be
inspected for dimensional compliance to MSS SP-75 and ASME B16.9
b. A successful proof test on a prototype fitting selected as required in 6.3.a may be
used to qualify other fittings to the extent described herein 6.3.c ,6.3.d,6.3.e
c. One test fitting may be used to qualify fittings of similar designs that are no smaller
than one-half nor larger than two times the size of the test fittings.
d. The test of a non-reducing fitting qualifies reducing fittings that are of the same
pattern.
e. The untested fitting must have a t/D ratio not less than one-half nor more than three
times the t/D of the test fitting.
t is the nominal pipe wall thickness, in inches
D is the specified outside diameter of pipe, in inches
During the period of fittings manufacturing, purchaser is entitled to assign inspector to the
plant for fittings inspection and acceptance, and is entitled to reject fittings which fails to
meet requirements.
If necessary, representative assigned by purchaser shall perform spot-check for
production to guarantee consistency with standard and this agreement.
Manufacturer of fittings shall allow representative assigned by purchaser to perform
inspection and spot-check to test record and test specimen during the period of fittings
manufacturing.
HALFAYA PROJECT SURFACE FACILITY
Petrochina (Halfaya)
The outside surface of fittings is without any coating and lubricating. Fittings requiring
bevel machining shall be equipped with bevel protector. Fittings size shall be identified
piece by piece according to practical dimension.
10.0 DOCUMENTATION
11.0 OTHERS