Professional Documents
Culture Documents
Manufacturing Process................................................................................................................................2
CUTTING (2 Stations)............................................................................................................................3
Yakan Fabric.......................................................................................................................................3
PP-Polypropylene................................................................................................................................3
SHAPING (2 Stations)............................................................................................................................3
Yakan Fabric.......................................................................................................................................3
PP-Polypropylene................................................................................................................................3
PINNING (1 Station)...............................................................................................................................3
SEWING (1 Station)................................................................................................................................3
FINISHING (1 Station)...........................................................................................................................3
QUALITY CONTROL............................................................................................................................3
STERILIZATION...................................................................................................................................3
PACKING...............................................................................................................................................4
Manpower Requirement..............................................................................................................................4
Workers for Each Station............................................................................................................................4
Administration Personnel............................................................................................................................4
PRODUCTION MACHINERY AND EQUIPMENT.................................................................................5
Cutting Stations.......................................................................................................................................5
Shaping Stations......................................................................................................................................5
Sewing Stations.......................................................................................................................................5
Manufacturing Process
Approximate amount of
Approximate amount of PP-Polypropylene (34
Yakan Fabric (50 Meters) Meters)
CUTTING CUTTING
SHAPING SHAPING
PINNING
Approximate amount of thread Approximate amount of elastic ear
(19 kg/spools) bands (144 meters of 5mm)
SEWING
432 Filter Valves
FINISHING
QUALITY
CONTROL
STERILIZATION
PACKING
CUTTING (2 Stations)
Yakan Fabric
The Yakan fabrics are stacked together and then cut into rectangular shapes using a band
knife cutting machine.
PP-Polypropylene
Rolls of PP-Polypropylene fabric are unrolled and cut by into rectangular shapes by a
sheet fabric cutting machine.
SHAPING (2 Stations)
Yakan Fabric
The rectangular cuts of Yakan fabric are further cut into a different shape using a
standard mask shape template, this is done with the use of straight knife cutting machine.
PP-Polypropylene
The rectangular cuts of PP-Polupropylene are shaped into the standard mask shape
template using a straight knife cutting machine.
PINNING (1 Station)
In this station, the shaped Yakan fabric and PP-Polypropylene are pinned together. The
pins are pierced in the edges to facilitate easier and faster sewing.
SEWING (1 Station)
The pinned masks are delivered to this station using bulk boxes. In this station, the
pinned masks are sewed together and elastic ear bands are attached to the sides.
FINISHING (1 Station)
In this station, the filter valves are attached to each mask.
QUALITY CONTROL
In this station, the masks are examined by Quality Control Officers for defects. Once it
was assessed to pass standards, it is delivered for sterilization.
STERILIZATION
The masks are put through UV Mask Sterilization Machine.
PACKING
The masks are sorted into two types of packaging: individual packaging and by three’s
packaging. It is then loaded into boxes, there are boxes meant for individually packaged masks
and another type of boxes where by the grouped masks are loaded. After this, the boxes are then
delivered into the storage drawers.
Manpower Requirement
Workers for Each Station
Cutting Station 1 2 Shifting Workers
Shaping Station 1 3 Workers
Cutting Station 2 2 Shifting Workers
Shaping Station 2 3 Workers
Pinning Station 15 Workers
Sewing Station 9 Workers
Finishing Station 5 Workers
Quality Control Station 3 Workers
Sterilization Station 2 Operators
Packing Station 5 Workers
Administration Personnel
Operating Manager 2
Roaming Supervisor 3
Runners 23
Human Resource 2
Production Planning Scheduler 2
Accountant 1
Maintenance 3
Utility 15
Dispatch Department 4
Warehouse Personnel 3
Legal Department (Lawyer) 1
Sewing Stations
In the Sewing Station, there will be 9 sewing machines in this station. The specification is
1192x487x763 mm for each machine.
Sterilization Station
A UV Sterilization Machine will be used to facilitate the sterilization process, the specification of
this machine is 2000x500x750 mm.