Appendix 2.

1The spreadsheet of typical apartment electricity capacity

Calculated
Load capacity Instalation Utilization Required Diversity Calculatedcur Coefficient
Power load Quantity power(Ptt) Cos phi Phase Itt*Kcb Switchgear
(Pt) Power (Pd) [W] factor (Ku) Power(Pyc) [kW] factor (Ks) rent (Itt) [A] Kcb
[kW]

Cabinets DB-1-5 (DB-1-6; DB-1-7; DB-1-


11.87 0.6 7.12 0.85 1P 38.09 1.25 47.61 MCB-2P 50A
8)
1. Lighting & Ventilation
+ Lighting load capacity L1 0.2 [KW/Lộ] 1.0 [Lộ] 0.2 1.0 0.20 1 0.20 0.85 1P 1.07 1.25 1.34 MCB-1P 16A
2. Power sockets
Socket S1 1.2 [KW/Lộ] 1 [Lộ] 1.2 0.6 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 RCBO-2P 20A
Socket S2 1.5 [KW/Lộ] 1 [Lộ] 1.5 0.6 0.90 1 0.90 0.85 1P 4.81 1.25 6.02 RCBO-2P 20A
Socket S3 1.2 [KW/Lộ] 1 [Lộ] 1.2 0.6 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 RCBO-2P 20A
3. Kitchen equipment
+ Kitchen equipment 2 [KW/Lộ] 1 [Lộ] 2.0 0.9 1.80 1 1.80 0.85 1P 9.63 1.25 12.03 RCBO-2P 25A
4. Air conditioners
+ Air conditioners AC1 2 [KW/Lộ] 1 [Lộ] 2.0 0.9 1.80 1 1.80 0.85 1P 9.63 1.25 12.03 MCB-1P 20A
+ Air conditioners AC2 0.9 [KW/Lộ] 1 [Lộ] 0.8 0.9 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 MCB-1P 20A
+ Air conditioners AC3 1.4 [KW/Lộ] 1 [Lộ] 1.4 0.9 1.26 1 1.26 0.85 1P 6.74 1.25 8.42 MCB-1P 20A
5. Water heater
+ Water heater 2.5 [KW/Lộ] 1 [Lộ] 2.5 1.0 2.50 1 2.50 0.85 1P 13.37 1.25 16.71 MCB-1P 25A
6.Booster pump
+ booster pump 0.75 [KW/Lộ] 1 [Lộ] 0.8 1.0 0.75 1 0.75 0.85 1P 4.01 1.25 5.01 MCB-1P 16A
7. Spare
+ Spare 0.5 [KW/Lộ] 1 [Lộ] 0.5 1.0 0.50 1 0.50 0.85 1P 2.67 1.25 3.34 MCB-1P 16A
Cabinets DB-2-5 (DB-2-6; DB-2-7; DB-2-
11.33 0.6 6.80 0.85 1P 36.35 1.25 45.44 MCB-2P 50A
8)
1. Lighting & Ventilation
+ Lighting load capacity L1 0.2 [KW/Lộ] 1.0 [Lộ] 0.2 1.0 0.20 1 0.20 0.85 1P 1.07 1.25 1.34 MCB-1P 16A
2. Power sockets
Socket S1 1.2 [KW/Lộ] 1 [Lộ] 1.2 0.6 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 RCBO-2P 20A
Socket S2 1.5 [KW/Lộ] 1 [Lộ] 1.5 0.6 0.90 1 0.90 0.85 1P 4.81 1.25 6.02 RCBO-2P 20A
Socket S3 1.2 [KW/Lộ] 1 [Lộ] 1.2 0.6 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 RCBO-2P 20A
3. Kitchen equipment
+ Kitchen equipment 2 [KW/Lộ] 1 [Lộ] 2.0 0.9 1.80 1 1.80 0.85 1P 9.63 1.25 12.03 RCBO-2P 25A
4. Air conditioners
+ Air conditioners AC4 1.4 [KW/Lộ] 1 [Lộ] 1.4 0.9 1.26 1 1.26 0.85 1P 6.74 1.25 8.42 MCB-1P 20A
+ Air conditioners AC5 0.9 [KW/Lộ] 1 [Lộ] 0.8 0.9 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 MCB-1P 20A
+ Air conditioners AC6 1.4 [KW/Lộ] 1 [Lộ] 1.4 0.9 1.26 1 1.26 0.85 1P 6.74 1.25 8.42 MCB-1P 20A
5. Water heater
+ Water heater 2.5 [KW/Lộ] 1 [Lộ] 2.5 1.0 2.50 1 2.50 0.85 1P 13.37 1.25 16.71 MCB-1P 25A
6.Booster pump
+ booster pump 0.75 [KW/Lộ] 1 [Lộ] 0.8 1.0 0.75 1 0.75 0.85 1P 4.01 1.25 5.01 MCB-1P 16A
7. Spare
+ Spare 0.5 [KW/Lộ] 1 [Lộ] 0.5 1.0 0.50 1 0.50 0.85 1P 2.67 1.25 3.34 MCB-1P 16A
Cabinets DB-1-1 (DB-1-2; DB-1-3; DB-1-
18.66 0.6 11.20 0.85 1P 59.87 1.25 74.84 MCB-2P 80A
4)
1. Lighting & Ventilation
+ Lighting load capacity L1 0.19 [KW/Lộ] 1.0 [Lộ] 0.2 1.0 0.19 1 0.19 0.85 1P 1.02 1.25 1.27 MCB-1P 16A
Calculated
Load capacity Instalation Utilization Required Diversity Calculatedcur Coefficient
Power load Quantity power(Ptt) Cos phi Phase Itt*Kcb Switchgear
(Pt) Power (Pd) [W] factor (Ku) Power(Pyc) [kW] factor (Ks) rent (Itt) [A] Kcb
[kW]
2. Power sockets
Socket S1 1.2 [KW/Lộ] 1 [Lộ] 1.2 0.6 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 RCBO-2P 20A
Socket S2 1.5 [KW/Lộ] 1 [Lộ] 1.5 0.6 0.90 1 0.90 0.85 1P 4.81 1.25 6.02 RCBO-2P 20A
Socket S3 1.2 [KW/Lộ] 1 [Lộ] 1.2 0.6 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 RCBO-2P 20A
3. Kitchen equipment
+ Kitchen equipment 2.5 [KW/Lộ] 1 [Lộ] 2.5 0.9 2.25 1 2.25 0.85 1P 12.03 1.25 15.04 RCBO-2P 25A
4. Air conditioners
+ Air conditioners AC1 2 [KW/Lộ] 1 [Lộ] 2.0 0.9 1.80 1 1.80 0.85 1P 9.63 1.25 12.03 MCB-1P 25A
+ Air conditioners AC2 0.9 [KW/Lộ] 1 [Lộ] 0.9 0.9 0.81 1 0.81 0.85 1P 4.33 1.25 5.41 MCB-1P 20A
+ Air conditioners AC3 2 [KW/Lộ] 1 [Lộ] 2.0 0.9 1.80 1 1.80 0.85 1P 9.63 1.25 12.03 MCB-1P 20A
5. Water heater
+ Water heater 4 [KW/Lộ] 1 [Lộ] 4.0 0.9 3.60 1 3.60 0.85 1P 19.25 1.25 24.06 MCB-1P 32A
6. Spare
+ Spare 1 [KW/Lộ] 1 [Lộ] 1.0 1.0 1.00 1 1.00 0.85 1P 5.35 1.25 6.68 MCB-1P 16A
Cabinets DB-2-1 (DB-2-2; DB-2-3; DB-2-
4.87 0.6 2.92 0.85 1P 15.63 1.25 19.53 MCB-2P 25A
4)
1. Lighting & Ventilation
+ Lighting load capacity L1 0.28 [KW/Lộ] 1.0 [Lộ] 0.3 1.0 0.28 1 0.28 0.85 1P 1.50 1.25 1.87 MCB-1P 16A
2. Power sockets
+ Socket S1 1.2 [KW/Lộ] 1 [Lộ] 1.2 0.6 0.72 1 0.72 0.85 1P 3.85 1.25 4.81 RCBO-2P 20A
+ Socket S2 1.5 [KW/Lộ] 1 [Lộ] 1.5 0.6 0.90 1 0.90 0.85 1P 4.81 1.25 6.02 RCBO-2P 20A
4. Air conditioners
+ Air conditioners AC4 0.9 [KW/Lộ] 1 [Lộ] 0.9 0.9 0.81 1 0.81 0.85 1P 4.33 1.25 5.41 MCB-1P 20A
+ Air conditioners AC5 0.9 [KW/Lộ] 1 [Lộ] 0.9 0.9 0.81 1 0.81 0.85 1P 4.33 1.25 5.41 MCB-1P 25A
5.Booster pump
+ booster pump 1 0.75 [KW/Lộ] 1 [Lộ] 0.8 0.9 0.68 1 0.68 0.85 1P 3.61 1.25 4.51 MCB-1P 16A
+ booster pump 2 0.75 [KW/Lộ] 1 [Lộ] 0.8 0.9 0.68 1 0.68 0.85 1P 3.61 1.25 4.51 MCB-1P 16A
Appendix 2.2 - The spreadsheet of electricity capacity of Managers' houses

Diversity Calculated Calculate


Load capacity Instalation Utilization Required Coefficient
Power load Quantity factor power(Ptt) Cos phi Phase dcurrent Itt*Kcb Switchgear
(Pt) Power (Pd) [W] factor (Ku) Power(Pyc) [kW] Kcb
(Ks) [kW] (Itt) [A]

I Cabinets DB -QL1 102.76 0.63 64.74 0.85 3P 115.86 1.25 144.82 MCCB-4P 150A

1. Cabinets
+ Cabinets DB 1-1 11.20 [KW/Lộ] 1.0 [Lộ] 11.2 1.0 11.20 1 11.20 0.85 1P 59.87 1.25 74.84 MCB-2P 80A
+ Cabinets DB 1-2 11.20 [KW/Lộ] 1 [Lộ] 11.2 1.0 11.20 1 11.20 0.85 1P 59.87 1.25 74.84 MCB-2P 80A
+ Cabinets DB 1-3 11.20 [KW/Lộ] 1 [Lộ] 11.2 1.0 11.20 1 11.20 0.85 1P 59.87 1.25 74.84 MCB-2P 80A
+ Cabinets DB 1-4 11.20 [KW/Lộ] 1 [Lộ] 11.2 1.0 11.20 1 11.20 0.85 1P 59.87 1.25 74.84 MCB-2P 80A
+ Cabinets DB 1-5 7.12 [KW/Lộ] 1 [Lộ] 7.1 1.0 7.12 1 7.12 0.85 1P 38.09 1.25 47.61 MCB-2P 50A
+ Cabinets DB 1-6 7.12 [KW/Lộ] 1 [Lộ] 7.1 1.0 7.12 1 7.12 0.85 1P 38.09 1.25 47.61 MCB-2P 50A
+ Cabinets DB 1-7 7.12 [KW/Lộ] 1 [Lộ] 7.1 1.0 7.12 1 7.12 0.85 1P 38.09 1.25 47.61 MCB-2P 50A
+ Cabinets DB 1-8 7.12 [KW/Lộ] 1 [Lộ] 7.1 1.0 7.12 1 7.12 0.85 1P 38.09 1.25 47.61 MCB-2P 50A
+ Cabinets DB 2-5 6.80 [KW/Lộ] 1 [Lộ] 6.8 1.0 6.80 1 6.80 0.85 1P 36.35 1.25 45.44 MCB-2P 50A
+ Cabinets DB 2-6 6.80 [KW/Lộ] 1 [Lộ] 6.8 1.0 6.80 1 6.80 0.85 1P 36.35 1.25 45.44 MCB-2P 50A
+ Cabinets DB 2-7 6.80 [KW/Lộ] 1 [Lộ] 6.8 1.0 6.80 1 6.80 0.85 1P 36.35 1.25 45.44 MCB-2P 50A
+ Cabinets DB 2-8 6.80 [KW/Lộ] 1 [Lộ] 6.8 1.0 6.80 1 6.80 0.85 1P 36.35 1.25 45.44 MCB-2P 50A
2. Lighting
+ Incident lighting 0.30 [KW/Lộ] 1.0 [Lộ] 0.3 1.0 0.30 1 0.30 0.85 1P 1.60 1.25 2.01 MCB-1P 16A
3. Spare
+ Spare 1 [KW/Lộ] 1 [Lộ] 1.0 1.0 1.00 1 1.00 0.85 1P 5.35 1.25 6.68 MCB-1P 16A
+ Spare 1 [KW/Lộ] 1 [Lộ] 1.0 1.0 1.00 1 1.00 0.85 1P 5.35 1.25 6.68 MCB-1P 16A