Professional Documents
Culture Documents
Navrachana University: Notes
Navrachana University: Notes
N NOTES
1. The dra ing should be read and not measured.
330
10 2. All dimensions are in mm and levels are in meters unless stated
other ise.
3. All dra ings must be cross referenced in case of an doubt / discrepanc .
20 4. All dimensions sho n in the dra ings are structural / masonr
115 dimensions.
30
1
40
BRICK PARAPET WALL
50
SPECIAL NOTES
JUNE 1.
60 2.
3.
MAY / JULY
1000
6PM 70 6AM 25MM THICK CHINA MOSAIC
30MM TOP FINISH
800
80 APRIL / AUG
130MM BRICK BAT COBA
RCC SLAB
Brick
Concrete
TOC
TOP
FFL
FGL
-
-
-
-
Top Of Concrete
Top Of Parapet
Finished Floor Level
Finished Ground Level
FEB / OCT
100
JAN / NOV 20MM PLASTER COAT
RCC BEAM
S LATITUDE 22N
6
7
8
9
FF- 006 living & dining
FF- 007 store
FF- 008 wc 1
FF- 009 wc 2
6260
1630
2000
2300
3225
1500
1500
1500
10 FF- 010 balcony 4530 2980
11 FF- 011 Wc 3 1685 2980
RCC OVERHANG
summer heat reflected.out DECEMBER SUN AT DECEMBER SUN AT
inter heat reflected 1PM 1PM
back inside APRIL SUN AT 3PM APRIL SUN AT 1PM APRIL SUN AT 3PM APRIL SUN AT 1PM KEY PLAN
DECEMBER SUN AT 3PM
DECEMBER SUN AT 3PM
130
1200
1500
1400
85
20MM PLASTER COAT ° °
uv light reflected 58 58
580
visible light passes
through
N
N.T.S.
DATE REVISION DESCRIPTION CHECKED
NO.
00/00/2023
DRG. NO. WD S - 1 0 3 R 0 0