Keeping in view the existing situation, the client has claimed liquidated damages. The contractor
has raised his concern over the liquidated damages and states that it is unjustified. The contractor
intends to raise a claim and take the matter to the court.
Note: The assignment should be hand written and not more than 4 pages.