You are on page 1of 2

H

REQUEST FOR QUOTATION A


R
G
Project name : Project New Line Pasta Plant 3
A
Location : P3 Mero Sekawan Jaya
S
A
T
No Description Spesification /Type / Remark VOL. SAT. U
A
I PREPARATION WORK N
1 Transportasi Alat & Bahan, Mob - Demob - 1 Ls J
A
2 APD, Safety Tools & Rapit Test - 1 Ls S
A
II CIVIL WORK
A Pekerjaan Tanah
1 Bobok/Bongkar Lantai Beton Untuk Pondasi - 2 M3
2 Pekerjaan Galian Tanah Existing - 2.16 M3
3 Pekerjaan Urugan Tanah Kembali 1.8 M3
4 Pekerjaan Sirdam / Basecourse 1 M3
5 Pekerjaan Pasir Urug 1 M3
B Pekerjaan Pondasi (4 Titik)
2 Pekerjaan Lantai Kerja t=50mm (Lean Concrete K100) 0.10 M3
3 Pekerjaan Pondasi Tapak 0.70 M3
- Beton K-350 Beton Instan ATOZ W/ Curing Time 24H
- Besi Ulir D13, Sengkang D10-150 SNI
4 Pekerjaan Beton Pedestal K-350 0.47 M3
- Beton K-350 Beton Instan ATOZ W/ Curing Time 24H
- Besi Ulir D13, Sengkang D10-150 SNI
6 Pekerjaan Lantai Beton K-300 3 M3
- Beton K-350 Beton Instan ATOZ W/ Curing Time 24H
- Besi Ulir D13, Sengkang D10-150 SNI
7 Anchor Bolt L M12-400 HDG 16 Buah
- Grouting SikaGrout

III STEEL STRUCTURE WORK See Detail Drawing 1 Ls


1 Kolom WF 300x150x6.5x9 KS or Equal, SNI

2 Balok Utama WF 350x175x7x11 KS or Equal, SNI


3 Balok Utama WF 250x125x6x9 KS or Equal, SNI
6 Balok Anak WF 150x75x5x7 KS or Equal, SNI
7 Angel L75x75x7mm white screw
8 Gusset Plate Thk 8mm KS or Equal, SNI
8 Platform Checker Plate SNI
9 Finishing Kolom & Balok Primtop Propan
Metalkote Epoxy Primer, Metalkote Polyurethane Top
10 Finishing Platform
Coat Propan
10 Bolt & Nut HDG

IV ARCHITECTURAL WORK

1 EPS Sandwich Panel D15 kg/m3 Skin - 0,45 Thickness 50 Fire–retardant EPS, EPS 35 M2
mm -Width :1000 mm - Slip Joint (WALL)
EPS Sandwich Panel D15 kg/m3 Skin - 0,45 Thickness 50
2 mm -Width :1000 mm - Slip Joint (CEILING) Fire–retardant EPS, EPS 25 M2

3 Ceiling Pvc Shunda Plafon 24 M2


4 Curving - 11 M'
5 Cat Dinding Existing Propan Gofast1000 53 M2
6 Bongkar Dinding Existing dan Perapihan Kembali - 49.5 M2
7 Bongkar Plafon Pvc dan Pasang Kembali - 25 M2

V PEKERJAAN ELECTRICAL
1 Installasi Titik lampu 3 Titik
Material
- Kabel NYM 3x1,5mm NYM 3x1,5mm
- Tee Dos Conduit 20 mm
- Klem Conduit 20mm
- Skrup + Fisher

2 Pekerjaan Pasang Saklar Ganda Outbow, Scheiderr 1 Buah


3 Pekerjaan Pasang Lampu TL Lampu LED TL Trunklinea 9W 3 Buah

You might also like