You are on page 1of 5

CASE STUDY

S W O T ACCESSIBILITY
A N A L Y S I S
BLOCK-C
GROUND AREA :1392.00SQMT
1. JAIN HERITAGE CAMBRIDGE
FIRST FLOOR : 1538.23SQMT
2. RYAN INTERNATIONAL SCHOOL
3. CHIREC CAMBRIDGE SCHOOL
SECOND FLOOOR : 1650 sqmt
TEMPERATURE ARID
MINIMUM - 17 DGREE CELCIUS
MAXIMUM - 40 DEGREE CELCIUS
THIRD FLOOR : 1650sqmt
HUMIDITY - 70% FORTH FLOOR :1650sqmt
• CIVIL HOSPITAL KONDAPUR 1.8KMS
WIND SPEED FIFTH FLOOR : 1650sqmt
8KM/HR
SIXTH FLOOR : 1650sqmt
SEVENTH FLR : 1650sqmt
RAJIV GANDHI INTERNATIONAL AIR- PRECIPETATION
PORT (RGIA) 26.1 KMS AWAY 1%

TOTAL UNITS = 88 NOS

NEAREST BUS STOP 600 METERS AWAY


BUSTOP 2 800M AWAY
BUSTOP 2.4KMS AWAY

BLOCK-B
CHANDA NAGAR RAILWAYS STATION
GROUND AREA :1430.66SQMT
3.2KMS AWAY
FIRST FLOOR : 1753.13 SQMT
SECOND FLOOOR : 1910 sqmt
THIRD FLOOR : 1910sqmt
FORTH FLOOR :1910sqmt
FIFTH FLOOR : 1910sqmt
SIXTH FLOOR : 1910sqmt
SEVENTH FLR : 1910sqmt

TOTAL UNITS = 103 NOS

TOTAL LAND AREA : 17,269 sqyds


BLOCK-A [3.57acres]
GROUND AREA :1760.5SQMT CLUB HOUSE (1866sqft)
FIRST FLOOR : 2062.1SQMT The club house consists an admin and
SECOND FLOOOR : 2244 sqmt REQUIRED TOT-LOT AREA = 1444.0 Sq.Mts
THIRD FLOOR : 2244sqmt PROPOSED TOT-LOT AREA = 1683.00 Sq.Mts different spaces for diffrent activities
FORTH FLOOR :2244sqmt such as banquet hall,gym,saloon,swim-
FIFTH FLOOR : 2244sqmt
SIXTH FLOOR : 2244sqmt TOTAL UNITS IN THE PROJECT = 310 NOS mingpool,multipurpose hall,storage
SEVENTH FLR : 2244sqmt TOTAL PARKING AREA = 17,727SQMT room,guest room,indoor games and an
PER PARKING SPACE =6.25SQMT (2.5M X 2.5M)
CELLAR FLOOR AREA = 8833.0SQMT outdoor play area
TOTAL UNITS = 119 NOS
SUB CELLAR FLOOR AREA = 8894.0SQMT
CASE STUDY EXECUTED BY.....
VISITORS PARKING 10%
SYED RAZIUDDIN - 19131AA035
MOHD ABDUL QUADER - 19131AA011
RAMP RATIO = 1:16
SYED UZAIR WAJAHAT - 19131AA036
SYED ZAKI AHMED - 19131AA037
RAZAAN JUNAIDI - 19131AA018
MOHAMMED ABUZER - 19131AA014
WELKIN PARK

SPECIFICATIONS :
* FRAME WORK: RCC Framed Structure.
* SUPER STRUCTURE: Table molded brick masonry.
* DOORS: Main door in Teak Wood Internal Door – Flush door with one side Teak veneer and other side painted.
* WINDOWS: Powder coated aluminum windows / UPVC windows.
* FLOORING: Vitrified tiles flooring with skirting in living / dining and all bedrooms. Ant skid ceramic tile flooring in toilets, bal-
conies and utility areas
* KITCHEN: Granite counters with ceramic tile dado up to 2’above the counter and stainless steel sink (single bowl single drain),
ceramic tile cladding in the wash area.
* WALL FINISHES: All interior walls with smooth finish and acrylic emulsion paint. All exterior walls with cement based exterior
paint of reputed brands.
Welkin park is a modern, super luxury, well PROJECT DETAILS: * TOILETS / BATHS: European WC’s wash basins of Hindware / Parryware or equivalent make. Toilet accessories of Jaquar Conti-
planned gated community residential * Site area : 4.5 acres nental / Marc or equivalent make. Provision for shower panels in toilets as per design.
developments in begumpet, hyderabad. * Built up area : 30% * POWER: Concealed copper wiring of standard make.
* Name of the project : welkin park * Open space : 70% PHYSICAL ENVIRONMENT: AMENITIES * Power plugs in all necessary areas.
* Location : begumpet, hyderabad. * No of floors : g+11 1. Central park * Electrical fitting and fixtures of Legrand / Anchor Roma or equivalent make
* Architect : AA & Associates * East facing 2. Covered swimming pool * COMMUNICATIONS: Telephone points in all bedrooms, drawing & living room.
* Interiors : moriq * Total building height : 37.8m 3. Jogging cycling track * CABLE: Provision for cable TV in living room and all bedrooms (except children bedroom).
* landscape : shaheer & associates * All side set backs : 14.0m 4. Seating spaces * GENERATOR / DG BACK UP: Standby power for common amenities and internal lighting.
* Total ground cover : 30% * Block to block distance : 22.0m 5. Yoga hall * WATER: 24 hours water supply through centralized Hydro pneumatic system.
* Built up area : 57,954sft * Width of drive way : 7.0m 6. Gym
* No of blocks : 05 7. Table tennis
SERVICES: * Typology of units : 3bhk, 4bhk. 8. Mini-thoatre
* Automatic barrier gates. * No of flats per each floor : 21 9. Banquet hall
* Fire hydrants are placed at regular intervals. * Total no of flats : 243 10. Guest rooms
* silent generator for alternative power supply. * Floor height : 3.15m 11. Business
* Storm water drains provided with gutter. * No of passengers lift : 2 12. Outdoor party area
* Fire extinguishers placed at corridor space of every * Corridor width : 3m 13. Play area
floor. * Duration of completion of project : 60 months 14. Kids pool
* Gas stations placed. * No of basement : 02 15. Beauty parlour
* Ducting beside the lifts for the concealed cabling and * Covered parking area : 35% 16. Spa
the maintenance work. * Ground floor to 5th floor hydraulic pump & 17. 24x7 security
* EPABX system from 6th floor to 11th over head tank. 18. Car wash area
* Waste water treatment plant. * Building materials : rcc, red brick, cement
* Ducting is provided for garbage disposal. brick, glass, wood etc…
* Continuous water supply, sewage treatment plant

TITLE SUBJECT TOPIC DATE REMARKS SIGNITURE MOHAMMED ABDUL QUADER- 19131AA012
MOHAMMED ABUZER HASHEEM- 19131AA014
MOHAMMED RAZAAN JUNAIDI- 19131AA018
SYED RAZIUDDIN - 19131AA035
SYED UZAIR WAJAHAT - 19131AA036
CASE STUDY ARCHITECTURAL DESIGN - VI HOUSING 09-11-2022
SYED ZAKI AHMED - 19131AA037
SEMESTER: VI, B. ARCH
DECCAN SCHOOL OF PLANNING AND
ARCHITECTURE, HYDERABAD, TS, INDIA
•The minimum size of plot for High Rise •Every application to construct or reconstruct a •For all High Rise Buildings prior No objection •In every high rise building site, an organized
building shall be 2000sq.m High Rise building or alteration to existing High Certificate (NOC) from the Andhra Pradesh open space shall be utilized as greenery, tot lot
Rise building shall be made in the prescribed State Disasters Response & Fire Services De- or soft landscaping, etc. shall be provided over
form and accompanied by detailed plans, floor partment shall be obtained and copy of the and above the mandatory setbacks to be left in •Buildings abutting major road of 30m and
plans of all floors along with complete set of approved plan and No Objection Certificate and around the building. This space shall be at above width shall be permitted only after pro-
structural drawings and detailed specifications (NOC) issued by the said department shall be least 10% of total site area at ground level open viding black-topped service roads of minimum
duly certified by a qualified licenced structural enclosed along with the building application. to sky and shall be a minimum width of 3m. 7m width with minimum 2 Lane carriageway
engineer. with in the defined right of way
•The balcony projection of up to 2m may be
. LIMITATIONS OF BUILDING SANCTION: allowed projecting onto the open spaces for
Sanction of building permission by the Sanctioning Authority shall not mean upper floors from 6m height onwards.
responsibility or clearance of the following aspects:
(a) Title or ownership of the site or building. SOMKE MANAGEMENT:
(b) Easement Rights. 1. Openinngs in wall or floors which are necessary to be provid-
•In case of high rise buildings up to 30m height, (c) Structural Reports, Structural Drawings and structural aspects. ed to allow passages of all building services like cable, electrical
it is permitted to transfer up to 2m of setback (d) Workmanship, soundness of structure and materials used, wirings, telephone cables, plumbing pipes etc, shall be protected
from one side to the other side, which needs to (e) Quality of building services and amenities in the construction of building. by enclosure in the form of ducts/shafts having a fire resistance
be uniform at any given point, subject to main- (f) Other requirements or licences or clearances required for the site / not be less than 2h.
taining of minimum setback of 7m on all sides premises or activity under various other laws. 2. the inspection door for electrical shafts/ducts fire resistance
In addition to the required staircases and lifts,
subject to not exceeding the permissible / allow- not less than 1h, medium and low voltage wiring with metal
there shall be at leastone fire escape staircase and OWNER FOR ENSURING CONSTRUCTION IS UNDERTAKEN AS PER
able plinth area. conduits.
lift. These staircases and lifts shall be got certi- SANCTIONED PLAN:
•Provision for power generator shall be made fied from the manufacturer’s authorized service
BUILDING PERMIT / LICENSE FEES: (a) In the case of any violation from the sanctioned building plan, the Enforce-
FIRE FIGHTING INSTALLATION:
•The permission is valid for 5years in case of ment Authority can summarily demolish the violated portion.
1. Fire extinguisher as per IS2190
High Rise Buildings & Group Development (b) The owner is required to hand over 10% of the built-up area in the
2. hose reel
Schemes ground floor or first floor or the second floor, as the case may be, to the
3. wet riser
HIGH RISE BUILDING COMMITTEE: sanctioning authority by way of a Notarised Affidavit.
4. yard hydrant
•Greater Hyderabad Municipal Corporation OCCUPANCY CERTIFICATE:
5. automatic sprinkler system
(GHMC)/Greater Visakhapatnam Municipal Occupancy Certificate shall be mandatory for all buildings. No person
6. automatic detection and alarm system
Corporation (GVMC)/Vijayawada Municipal shall occupy or allow any other person to occupy any building or part of a
7. manually operated electric alarm
Corporation (VMC). building for any purpose unless such building has been granted an
8. underground static water tank of 2,00,000 liters
•Hyderabad Metropolitan Development Author- Occupancy Certificate by the Sanctioning Authority.
capacity
ity (HMDA)/All Urban Development Authori- ENFORCEMENT:
9. terrace tank 20,000 liters capacity
ties (UDA) The Enforcement Authority concerned shall be wholly and severally
10. two electical main pumps of 2850 LPM capacity
•Other Municipal responsible for ensuring and maintaining the right of way / width of
11. diesel pump
the road and building restrictions as given in these Rules.
12. electic jockey pump of 180 LPM capacity

TITLE SUBJECT TOPIC DATE REMARKS SIGNITURE MOHAMMED ABDUL QUADER- 19131AA012
MOHAMMED ABUZER HASHEEM- 19131AA014
MOHAMMED RAZAAN JUNAIDI- 19131AA018
SYED RAZIUDDIN - 19131AA035
SYED UZAIR WAJAHAT - 19131AA036
LITERATURE STUDY ARCHITECTURAL DESIGN - VI HOUSING 09-11-2022
SYED ZAKI AHMED - 19131AA037
SEMESTER: VI, B. ARCH
DECCAN SCHOOL OF PLANNING AND
ARCHITECTURE, HYDERABAD, TS, INDIA
REMARKS: NAMES
WIND MILL OF YOUR MIND SUBJECT: DATE
MOHAMMED ABDUL QUADER - 19131AA012
BANGLORE SYED ZAKI AHMED - 19131AA037
ARCHITECTURAL SIGNATURE: SYED UZAIR WAJAHAT - 19131AA036
DESTKTOP STUDY DESIGN SYED RAZIUDDIN - 19131AA035
MOHAMMED RAZAAN JUNAIDI - 19131AA018
MOHAMMED ABUZER HASHEEM - 19131AA014
NEIGHBORING

ORION VILLAS

SURROUNDING SERVICES

CONNECTING ROAD

IKEA

CARE HOSPITAL BOTANICAL GARDEN

TRAFFICE PATTERN

CYBERABAD POLICE
STATION

ENGINEERING STAFF
INORBIT MALL COLLEGE OF INDIA

FIGURE GROUND
MAULANA AZAD NATIONAL
URDU UNIVERSITY

RAJIV GANDHI
INTERNATIONAL AIRPORT
SELECTED SITE FOR DESIGNING
HAFIZPET RAILWAY LOCATION:
STATION KHAJAGUDA, HYDERABAD T.S, INDIA.

AREAS:
= 129006.71 SQFT.
= 143340.74 SQYDS.
PATANCHERU BUS
= 119851.12 SQMTS. OR SAY 29.61 ACRE
LANDSCAPE & WATER BODIES STAND

TITLE SUBJECT TOPIC DATE REMARKS SIGNITURE MOHAMMED ABDUL QUADER- 19131AA012
MOHAMMED ABUZER HASHEEM- 19131AA014
MOHAMMED RAZAAN JUNAIDI- 19131AA018
SYED RAZIUDDIN - 19131AA035
SYED UZAIR WAJAHAT - 19131AA036
SITE ANALYSIS ARCHITECTURAL DESIGN - VI HOUSING 09-11-2022
SYED ZAKI AHMED - 19131AA037
SEMESTER: VI, B. ARCH
DECCAN SCHOOL OF PLANNING AND
ARCHITECTURE, HYDERABAD, TS, INDIA

You might also like