UHL Stage-III HEP (100 MW)

UHL Stage-III HEP (100 MW) is a downstream development of Uhl Stage-


II (Bassi Power House) and is located in Distt. Mandi (H.P). This Project
utilizes the tail water releases from Uhl Stage-II (Bassi Power House) and
inflow of Neri Khad & Rana Khad.
POWER CHANNEL
L= 1100m
PENSTOCK
RANA AQUEDUCT HRT Dia=3.40m, L-1998.96 m.
Dia = 3.40m, L= 364m. Finished Dia=4.15m, L-8471m.
DESILTING TANK
SURGE SHAFT at (RD
VORTEX TYPE 14m (ID) INLET PORTAL
8471 m)
RD 0.00 Dia=11m/3.5m, H=69m.

NERI INTAKE
Q=5.40 cumec

KHUDDAR RESERVOIR
TAIL RACE OF Uhl-II
(Bassi Power House) INTERMEDIATE ADIT at RD
Q=21.6 cumec 6656m, (324m long)

POWER CHANNEL
L= 2012m.
POWER HOUSE
(67.10mx17.1mx13m) 3 No.
DESILTING TANK Francis turbines 3x33.33 MW
RANA INTAKE VORTEX TUBE TYPE, 48mx12mx1.25m (100 MW)
Q=14.30 cumec
LAYOUT PLAN