CONSTRUCTION PROCUREMENT and -site supervisors were inexperienced and had

very little authority.


CONTRACT MANAGEMENT
-Questions, even minor in nature, had to be
answered by engineers in the respective home
This course introduces the concepts and offices. Quite often the workmen received
practices of local and international construction incomplete and improper drawings to work with,
laws, advanced procurement practices, the and they claimed that better isometric and
situations in which their use is appropriate, and schematic drawings would clarify some
the contractual principles they are based on. It ambiguities.
will also introduce students to the mechanisms x. Ineffective utilization of skills
used by a typical standard form construction
xi. Lack of cooperation among crafts
contract to control the risk exposure arising
xii. Poor inspection program
from the liabilities of contracting parties created
by the agreement and the flow of money and xiii. Communication breakdown
information between contracting parties. xiv. Unsafe conditions
xv. Lack of participation in decision making
Week 1-2: Chapter I: Introduction
b. Discuss each demotivator and identify
1. Brainstorming: Why Contractors fail? which are “beyond the control” or “within the
control” of the contractor.
• poor project management;
Beyond the control Within the control
• poor leadership;
• poor performance;
• poor accounting; and.
• poor planning.

Assignment:
a. Demotivators in Construction Projects
i. Disrespectful treatment
ii. Material availability
-problems were experienced in obtaining
materials from vendors as a result of short
design lead times leaving management with
little time to order the necessary materials.
- material availability was especially poor
immediately after design changes. The activities
were sometimes scheduled without positive
assurance of the availability of the required
materials
-Quite often it was discovered that the vendors
had delivered the wrong materials, they were
c. Duties & Responsibilities of Project
damaged, or the materials exceeded the
Manager/Materials Engineer.
acceptable tolerances.
-Some of their responsibilities are to inspect all
iii. Tool availability
sites, coordinate with contractors and
-substandard tool quality, inadequate supplies of
engineers, manage the budget and expenditure,
tools, excessive thievery, and lengthy delays in
purchase necessary materials and equipment,
replacing stolen,
and make schedules.
iv. Little accomplishment
- Materials engineers work with metals,
v. Redoing work ceramics, and plastics to create new materials.
-Most workers take considerable pride in the They develop, process, and test materials used
work they accomplish and having to take their to create a range of products, from computer
work apart and redo it again can be extremely chips and aircraft wings to golf clubs and
dissatisfying. biomedical devices.
vi. Crew discontinuity d. What are the calibrated sanctions for erring
-Inadequate coordination of the crew diminished contractors in Public Construction Project in the
the cooperative atmosphere Philippines?
-Lack of communication within the organization https://www.gppb.gov.ph/issuances/Resolutions/
was a problem frequently mentioned. There were GPPB%20Resolution%20No.%2005-2019.pdf
continual complaints of receiving only minimal
amounts of relevant information 2. Purpose of Project Procurement Management,
vii. Lack of recognition Construction Procurement Process, Procurement
viii. Productivity urged but no one cares and Contract Delivery System.
ix. Incompetent personnel
a. What is the purpose of Project Procurement - The closing process is not just about
Management? ending procurement contracts; it’s about
- Project procurement management is the noting weaknesses, documenting
creation and maintenance of relationships with successful processes and summarizing
external resources needed to complete a the project for future needs.
project. A project procurement manager - During the closing process, negotiations
communicates with vendors to buy, rent or may be necessary to resolve contract
contract products and services needed to disputes.
achieve project objectives.
-in short obtaining all of the materials and 3. A Review of Procurement & Different Types of
services required for the project. Contract Delivery Systems.
a. Discuss each type of Procurement and
b. Discuss each process on Project Procurement Contract Delivery systems
Management. i. Force Account
- When the Project owners engage
i. The Planning Process themselves to undertake the project.
- Promoted if the project owners believe
that there is a comparative advantage in
- involves the creation of the official
cost, time and quality issues.
procurement management plan. The
ii. Design Bid Build (DBB)
decisions made involve which items will
be internally procured and which items - This is the most practiced type of
will be externally outsourced. delivery system in the Construction
Industry of Ethiopia since 1987.
- Sample procurement documents will be
prepared, and criteria frameworks will - Since 1980s, this traditional approach
be developed to create a selection of becomes less popular due to the
potential vendors. This selection matrix following factors:
is based on the project’s scope, schedule, o Severe relations between the design
and requirements. Risk factors and and contract administration;
budgetary constraints are also consultant and the contractor
considered. o Fragmented contact for the project
ii. The Selection Process owner
o Project owner responsibility for risks
- involves comparing and contrasting
associated with the design and
vendors’ advantages, disadvantages, and
contract administration
contractual offerings. Standard tools and
o Non-impartiality of the Design and
techniques are used to select
Contract Administration services.
procurements, such as video conferences
iii. Design Build (DB) or Turnkey,
with bidders that allow them to
understand the project requirements and - Turnkey Delivery system is a response to
ask questions. problems associated to the last two
types of delivery systems.
- Procurement contracts are decided and
awarded through collaborations between - Reduces numbers of procurement
various managers. processes engaged in the fragmented
process
- Proposals are carefully evaluated and if
no satisfactory bids are available, the - Delivery is common worldwide
project management team may utilize specifically for private projects.
online ads to solicit new bidders.

iii. The Administration Process


- refers to the tools and processes used to
manage relationships with vendors. The
administration phase results in the
continual creation of procurement
documents and spreadsheets that may
drive project changes.
- A centralized system of contract change
monitoring and control will be used to
evaluate and determine whether
potential changes to contracts are
needed.
- The administration process is extremely
important, so it’s usually managed Typical advantages of DB system include:
through supply chain or project o Reducing fragmentation and adversarial
management software. relations between designers and
contractors
iv. The Closing Process
o Minimizing project owners’ risk - Construction management consultancy
transferable due to designers’ faults firm issued to coordinate all activities
o Accountability and entire responsibility from concept inception through acceptance of
for both design and construction the facility.
o Minimizes the opportunity to claims by - Facility management consultancy adds
the contractor due to related issues etc. operation of facility during operation
Disadvantages of DB system include: and maintenance to Construction
o Loss of control, due to limited supervisory Management Consultancy.
role by the employer representative - CM is involved in the whole construction
o Cost of tender: to provide reasonable processes whereas all the others involve
offer, their tender cost is higher than in only during the implementation phase
the case for DBB delivery system. after major decisions are made during
o Cost risks; increase on risk transferred the Basic planning phase
onto the contractor will be - Construction Management Consultants
counterbalanced by the increase in then represents Project Owners to carry
contract prices. out the following services:
iv. Finance / Build Operate System (BOT) o Feasibility studies of Construction
- Build-Operate-Transfer is a form of related services
procurement and contract delivery o Plan and Monitor the Triple
system that promotes Public Private Constraints of Project Performances
Partnership o Lead and Organize regulatory
- The project owner is not responsible for systems of the Construction Industry
any liability other than force majeure o Valuation, Quantity Surveying and
and agreed upon claim adjustments. Procurement and Contract
- This delivery system is advantageous Management Services
because of three major factors - Construction management is a broad term
o It minimizes owners’ scarcity of covering a variety of project delivery scenarios
financial resources in which a construction manager becomes an
o The facility is and transferred with integral part of the team, at early stages in the
free of charge or minimum project, to oversee such elements as schedule,
compensations cost, and construction methodologies and
o It voids considerable risks from the procurement strategies.
project owners - The general Construction Management
The increasing popularity of the BOT project is variations are
largely due to a shortage of public funding and o Construction Management-for-Fee (CM for-
opinion that the facility will be more efficiently Fee)and
managed by a private entity. o Construction Management-at-Risk (CM-at-
Advantages of BOT Risk)
- It minimizes owners’ scarcity of financial - CM-for-fee is a delivery method similar to the
resources. DBB In CM-for-fee method,
- It devoid of considerable risks from the o the construction manager is
project owners responsible for project and site
- the facility is well operated and management,
transferred with free of charge or
minimum compensations to project § but is not involved in actual
owners. construction work.
- Integrates the process of design, o The construction manager monitors
construction, operation, cost, time, quality and safety,
and maintenance.
§ but does not take responsibility
- Projects are likely completed faster for them.
Disadvantages of BOT
- Longer tendering process
- Costly tendering
- No capable local contractors (for our
case)
- Costs more in the long run
- Contractors may not be interested in all
works
v. Construction/Facility Management,
Consultancy
- response to problems associated with DB
and BOT
- If the goal is to seek integrated delivery methods,
then the client would consider the following
delivery methods.
a. Design-Build (DB)
b. Construction Management (CM at-Risk)
c. Design-Build-Operate-Transfer (BOT)
- And if the intention is to seek direct project
funding, the owner may consider the following
options:
a. Design-Bid-Build (DBB)
b. DB (Design-Build)
c. Construction Management (CM) at fee and
at risk.
- If the goal is to seek external financing
(indirect funding), then the client would
consider the build-operate-transfer
(BOT ).
- The construction manager is paid a fixed
or time-based fees for services provided
Note: It is worth mentioning that the above
- The construction management organization
division is based on the normal procedure
takes an advisory role or role of an agent
or the usual practice. It may vary as agreed
to the client
up on.
- The CM has limited risk because
construction contracts are between the
owner and individual contractors.

vi. Alliances and Outsourcing.


- It focuses most on management of relationships
and value adding to ensure quicker, cheaper, and
quality services and products with less disputes
- This is a method where an owner/developer and
a contractor agree to work together by freely
Recommended Text, Resources, and other
sharing resources, risks, and knowledge during
Readings:
the course of the project
- It bases behind DB, BOT, FM\CM
1. Republic Act 9184 Government Procurement
consultancy delivery systems but they’re
Reform Act. Republic of the Philippines. Congress
at most and recent developments
This type of project procurement can be of the Philippines. Metro Manila
distinguished from others by
- collective performance of obligations by 2. Procurement Strategy & Contract Selection
the owner/developer and contractor, Dep’t of Housing & Public Works Queensland
Government
- decision-making by consensus,
- commitment to resolve disputes without
3. The 2016 Revised Implementing Rules and
resort to litigation
Regulations of Republic Act No. 9184 (Updated as
Consideration in Selecting Project of 31 March 2021). Philippines
Delivery Methods
4. Condition of Contract for Construction.
Multilateral Development Bank Harmonized
- Choice of project delivery methods can be
Edition March 2006.
pictured in a different context, which displays
the project delivery methods viewed by means of
two criteria.
- This is based on whether the project delivery
methods are based on:
o Approach (segmented or integrated), and
o Source of finance (direct or indirect funding)
- If the goal is to seek traditional or segmented
delivery methods, then the client would consider
the following delivery methods.
o Design-Bid-Build (DBB)
o Construction Management (CM)
at fee.