Assignment:
a. Demotivators in Construction Projects
i. Disrespectful treatment
ii. Material availability
-problems were experienced in obtaining
materials from vendors as a result of short
design lead times leaving management with
little time to order the necessary materials.
- material availability was especially poor
immediately after design changes. The activities
were sometimes scheduled without positive
assurance of the availability of the required
materials
-Quite often it was discovered that the vendors
had delivered the wrong materials, they were
c. Duties & Responsibilities of Project
damaged, or the materials exceeded the
Manager/Materials Engineer.
acceptable tolerances.
-Some of their responsibilities are to inspect all
iii. Tool availability
sites, coordinate with contractors and
-substandard tool quality, inadequate supplies of
engineers, manage the budget and expenditure,
tools, excessive thievery, and lengthy delays in
purchase necessary materials and equipment,
replacing stolen,
and make schedules.
iv. Little accomplishment
- Materials engineers work with metals,
v. Redoing work ceramics, and plastics to create new materials.
-Most workers take considerable pride in the They develop, process, and test materials used
work they accomplish and having to take their to create a range of products, from computer
work apart and redo it again can be extremely chips and aircraft wings to golf clubs and
dissatisfying. biomedical devices.
vi. Crew discontinuity d. What are the calibrated sanctions for erring
-Inadequate coordination of the crew diminished contractors in Public Construction Project in the
the cooperative atmosphere Philippines?
-Lack of communication within the organization https://www.gppb.gov.ph/issuances/Resolutions/
was a problem frequently mentioned. There were GPPB%20Resolution%20No.%2005-2019.pdf
continual complaints of receiving only minimal
amounts of relevant information 2. Purpose of Project Procurement Management,
vii. Lack of recognition Construction Procurement Process, Procurement
viii. Productivity urged but no one cares and Contract Delivery System.
ix. Incompetent personnel
a. What is the purpose of Project Procurement - The closing process is not just about
Management? ending procurement contracts; it’s about
- Project procurement management is the noting weaknesses, documenting
creation and maintenance of relationships with successful processes and summarizing
external resources needed to complete a the project for future needs.
project. A project procurement manager - During the closing process, negotiations
communicates with vendors to buy, rent or may be necessary to resolve contract
contract products and services needed to disputes.
achieve project objectives.
-in short obtaining all of the materials and 3. A Review of Procurement & Different Types of
services required for the project. Contract Delivery Systems.
a. Discuss each type of Procurement and
b. Discuss each process on Project Procurement Contract Delivery systems
Management. i. Force Account
- When the Project owners engage
i. The Planning Process themselves to undertake the project.
- Promoted if the project owners believe
that there is a comparative advantage in
- involves the creation of the official
cost, time and quality issues.
procurement management plan. The
ii. Design Bid Build (DBB)
decisions made involve which items will
be internally procured and which items - This is the most practiced type of
will be externally outsourced. delivery system in the Construction
Industry of Ethiopia since 1987.
- Sample procurement documents will be
prepared, and criteria frameworks will - Since 1980s, this traditional approach
be developed to create a selection of becomes less popular due to the
potential vendors. This selection matrix following factors:
is based on the project’s scope, schedule, o Severe relations between the design
and requirements. Risk factors and and contract administration;
budgetary constraints are also consultant and the contractor
considered. o Fragmented contact for the project
ii. The Selection Process owner
o Project owner responsibility for risks
- involves comparing and contrasting
associated with the design and
vendors’ advantages, disadvantages, and
contract administration
contractual offerings. Standard tools and
o Non-impartiality of the Design and
techniques are used to select
Contract Administration services.
procurements, such as video conferences
iii. Design Build (DB) or Turnkey,
with bidders that allow them to
understand the project requirements and - Turnkey Delivery system is a response to
ask questions. problems associated to the last two
types of delivery systems.
- Procurement contracts are decided and
awarded through collaborations between - Reduces numbers of procurement
various managers. processes engaged in the fragmented
process
- Proposals are carefully evaluated and if
no satisfactory bids are available, the - Delivery is common worldwide
project management team may utilize specifically for private projects.
online ads to solicit new bidders.