3 Pulleys and Gears Pulley #1 Construction Guide


PLTW Engineering

Activity 2.2.3 Pulleys and Gears


Construction Guide #1

Completed Pulley System

Page 1
© 2020 Project Lead The Way, Inc.
He

Materials and Equipment


• 2x16 Beam  (4) Rubber Shaft Collars
• (2) 1x4 Beams  (2) 0.5x Spacers
• (5) 4x Shafts  30 mm Diameter Pulley
• 8x Shaft  40 mm Diameter Pulley
• (2) 16-Tooth Sprockets  48 inches of string
• (4) 24-Tooth Sprockets  Not shown
• (3) 32-Tooth Sprockets • Tape
• (4) 40-Tooth Sprockets • Scissors
• (2) 1x Standoffs • Measuring tape
• (2) 2x Wide, 2x1 Offset Corner Connectors
• (2) 1x Wide, 1x1 Offset Corner Connectors

VEX IQ Parts

Page 2
© 2020 Project Lead The Way, Inc.
He

Procedure

1. With the string ends prepared to avoid unraveling, cut the string so that you have a 42-
inch and a 6-inch string.
a. Add a ½-inch piece of tape to the string so that the center point of the tape is at
the place where the string will be cut.
b. Roll the tape around the string.
c. Cut the string and tape at the required point.

2. Use the parts shown to build the bottom


pulley assembly.

a. Add the following parts in order, using


the images as a reference.
i. One Rubber Shaft Collar to one end of
the 4x Shaft
ii. One 1x4 Beam
iii. One 0.5x Spacer
iv. One 30 mm Diameter Pulley
v. One 0.5x Spacer
vi. One 1x Standoff to the 1x4 Beam

b. Add another 1x4 Beam, then one Rubber


Shaft Collar.

Page 3
© 2020 Project Lead The Way, Inc.
He

c. Tie one end of the short string to the 2x


Standoff.

d. Pass the other end of the string through


the eye of the 1x Wide, 1x1 Offset
Corner Connector and tie an overhand
knot.

3. Use the parts shown to create two heavy counterweight subassemblies. These
subassemblies each weigh 56 grams. Note this weight value for the activity.

a. Slide two 32-Tooth Sprockets and two


24-Tooth Sprockets onto a 4x Shaft.

4. Attach the 1x Wide, 1x1 Offset Corner


Connector into one heavy counterweight
subassembly.
This entire subassembly weighs 69
grams. Remember this weight value for
the activity.

Page 4
© 2020 Project Lead The Way, Inc.
He

5. Use the parts shown to build the top


pulley assembly.

a. Attach the 2x Wide, 2x1 Offset Corner


Connectors to the 2x16 Beam.

b. Insert the 8x Shaft through the first


connector, then add a Rubber Shaft
Collar.

c. Continue pushing the shaft through


the second 2x Wide, 2x1 Offset
Corner Connectors and a second
Rubber Shaft Collar.

d. Add a 30 mm Diameter Pulley to the


end of the shaft.

6. Place the top pulley assembly so that the pulley is cantilevered over the edge of a desk
or table. Secure the beam with tape or a weight, such as a textbook.

Page 5
© 2020 Project Lead The Way, Inc.
He

7. Thread the long string through the pulley system.


a. Pass the string up through the left hole
of the beam, then tie an overhand knot
in the end.

b. Thread the string through the pulleys


as shown.

c. Pass the end of the string through the


eye of the 1x Wide, 1x1 Offset Corner
Connector and tie an overhand knot.

d. Snap the connector into the beam to


secure the end when not using the
pulley system.

Page 6
© 2020 Project Lead The Way, Inc.
He

8. Use the parts shown to create a medium counterweight subassembly that will be set
aside until called for in the activity. This subassembly weighs 66 grams. Note this weight
value for the activity.

a. Slide two 32-Tooth Sprockets and two


16-Tooth Sprockets onto a 4x Shaft.

9. Create a light counterweight subassembly


using the parts shown. This subassembly
weighs 16 grams. Remember this weight
value for the activity.

a. Slide a 32-Tooth Sprockets onto a 4x


Shaft.

10. Return to the Activity 2.2.3 procedure.