Professional Documents
Culture Documents
30
Task: Taking Tank Sounding on a daily basis.
Aims:
1) To know what is Sounding
2) To know how to measure the Sounding
3) To know why to sounding is measure
Precautionsto be observed:
1) Always use water finding paste for metal Sounding Tape
2) Use only cotton rope for sounding Rod.
3) Length of sounding line should be two the Sounding pipe
4) Separate sounding rod and line is use for tallest tank and Fresh water Tank,
B-Sounding apP
Tank Sounding Pipe
Fluid Surface
Sounding Value
Striker
Sounding Method Plate
Task No-6.31
Aim:
1) To know what is ullage
2) To know how to measure the ullage
3) To know why we take the ullage
Precaution to be observed:
1) Any metallic tape is lower in cargo Tank after 30 minutes liquid cargo Loaded.
2) Ullage tape to be touched to the ullage port before Bob goes in Liquid.
3) Liquid cargo should be full of in Tank
Ullage
Roun d
thating uwoodsn
Tank
Pie Liquid
TASK NO-6.43
Task: Rig and climb Smtrs Telescopic Ladder
Complying with Safety guideline.
Aims:
1) To know how to use Telescopic ladder.
Precaution to be observed:
1) Telescopic Ladder must be free from any slippery materials on theesteps or feets.
2) Carry all the tools keeping in tool pot
3) Ladder become very short after sliding down and it can carry in Bag.
TaskNo-6.39
Aim:
1) To understand the use of scaffolding
2) To know How to assemble scaffolding
for scaffolding
3) To know the safety precaution
Precaution to be observed:
drawingpage)
Findings:( to be written on
178
Read text Book 2 page
Instructor notes the task
for carrying out
understand the procedure
scaffolding
For assembling
the and hold them strongly
both side at the interval of 61/2
side tube to the with locking pin
1) Place the both side and lock
Rod bétween them from
2) Put diagnal
x
board on top of
the tube
3) Place the line
side with Lashing
4) Lash it from both height.
material to work at
of scaffolding
5) The purpose
wORKINIGPLATFORM G U n R D R A I L
VERTICA.
S T A N D s
WoooEN P L A N
ToeBoARD\
L N
STEPS5
C e o s s
BRACE
STEPS
Task No-6.37
Precaution to be observed:
1) Condition of rope should be good
2) No oil & grease no crack No paint on hard wooden plank
3) Tail Block or Lizard should be load tested
4) Take work aloft permit
5) Wear P.P.E with safety harness
6) Keep necessary tools in pot
7) Have a standby per person on deck
8) Inform to Bridge/ Engine room before start aloft work.
Aim:
1) To know how to lift various size of pipe.
know what are thesafety precaution to be taken while lifting pipe.
2) To
3) To know correct pipe sling to lift.
drawing page)
Findings: ( tobe written on than can be lifted
or by
shifted manually.
Derrick under
in weight
If the pipe is light
e or
lifted or Shifted by
c r a n
(1) than c a n be
heavy
(2) If the pipe a r e
mention cargo ship.
sling a
1:-heavy duty pipe
belt sling like Drum.
2 : - C a n v a s Flat length of pipe
o r shifting
Hook Sling for
lifting
3:-Can
Lifting pipes with Flat belt sling
1) Rope Ladder
2 Coolie Ladder
3) Monkey Ladder.
4) Jacob Ladder.
Precautionto be observed:
1) Never roll the drum to carry it from one place to another
place.
2) Always make the drum up right position using kinetic method manual
of
handling
LLS.
Task No 6.47
Task: Climb mast the most
appropriate Safety measure.
Aim: 1) To understand what is aloft work.
2) To know the purpose of going on most.
3) To know the safety precaution before to
go on mast
4) To identify the risk involve while
going mast
to
5) To know how to control and care on
right way
Task: moving 02 cylinders and acetylene cylinders to distance using two man lift
and trolley
Aim:
1) To know how to carry 02 cylinder and acetylene cylinder to a distance
2) To know what is man lift trolley handling by two men.
Precautions to be observed
1) Do not lift the cylinder by, holding valve sup.
2) Do not drag cylinder keep it up right and bend 40° degree and roll it by holding
up side for shifting.
3) Oxygen cylinder should not keep together with acetylene cylinder it should be
kept separate.
One man has to hold the upper part of cylinder and another man will hold lower
part of cylinder
Both man will put cylinder by trolley and shift carefully.
LASHING OF CyLINDER
Task 6.54
Aim
(1) To know how to 20 liters
paint drum to be lifted.
(2) To know how 20 liters drum to be
carried.
(3) To know how 20 liters paint drum to
stowing on the rack.
NET s LING.
METAL CAGE