Despatch Instructions

Unit Synchronization
Step #1 NPCC Generates Despatch Instruction For Unit Synchronization (NTS)
Step #2 LP/PG will acknowledge the NTS
Step #3 LP/PG will enter Synchronization date and time in despatch instructions
Step #7 Please verify the event after completion of above steps, in "Plant events".
Step #8 If event is not available in "Plant events", Then LP/PG will generate event for Unit synchronization
Step #4 NPCC Generates Load Demand in Despatch Instructions
Step #5 LP/PG will acknowledge the Load Demand in despatch instructions
Step #6 LP/PG will enter the Load achieved time.

Unit De-synchronization
Step #1 NPCC Generates Despatch Instruction For Unit De-synchronization.
Step #2 LP/PG will acknowledge the Unit De-synchronization.
Step #3 LP/PG will enter De-synchronization date and time in despatch instructions.
Step #4 Please verify the event after completion of above steps, in "Plant events".
Step #5 If event is not available in "Plant events", Then LP/PG will generate event for Unit de-synchronization

Unit Load Variation Demands


Step #1 NPCC Generates Despatch Instruction For Load veriation.
Step #2 LP/PG will acknowledge the Load demand
Step #3 LP/PG will enter the Load achieved time.