Professional Documents
Culture Documents
1-1
Pakistan 23 APR 20
No abatement of any charges shall be allowed in Note: The landing charges, payment of which
the event of any aerodrome service, assistance or entitles the aircraft to the use of radio does not
any facility being not available and except as include operation charges or charges for radio
provided in these regulations no exemption or services in connection with movement, which
remission shall be granted. may be levied by an approved agency of the
Government.
Unless an alternative arrangement has been made, 3. FIRE AND RESCUE FACILITY CHARGES:
all charges for use of the aerodrome are payable by
the pilot of the aircraft on demand or before the Payable by airlines @ 10% of landing charges.
aircraft departs from the aerodrome. These charges will be applicable on landing inter-
national flights.
For the purpose of assessing landing, parking or
hangarage charges the total weight of an aircraft 4.Aero Bridge Gate Charges.
shall be maximum takeoff weight allowed as 4.1 Aero bridge charges are fixed for initial two
specified under the regulation of the State in which (02) hours and levied as follows.
the aircraft is registered. (Certificate of
Airworthiness).
4.2 Docking time shall be the period beginning
1.2 The charges for landing, housing and Aero- from the time an aircraft docks into the aero bridge
bridge gate applicable to flights landing at Sialkot and when it leaves the aero bridge.
International Airport are payable to Sialkot
International Airport Ltd.
2. LANDING OF AIRCRAFT 4.3 Aerobridge gate charges shall be levied in
addition to parking charges.
2.1Charges for Landing Flights: