You are on page 1of 2

I.

Executive Summary

Introduction
Throughout the community, a lot of garbage is thrown away every day. Some of this
waste clogs the canal's waterways if not properly thrown. When the rainy season comes
the rain will result in flooding, because the waterways are clogged with garbage. The
community is not only affected during the rainy season, it is also affected during the dry
season. Some of the garbage is flammable, this is the reason why many houses catch
fire. When we do not dispose of waste properly, it results in disasters. If we conduct a
reducing and recycling program in our community, we can avoid clogging of drains and
houses on fire. This document propose a project to lessen and make use of the waste
that can help the community.

Project Justification
Human society sustains itself by transforming nature into garbage,” said aphorist
and Professor Mason Cooley.
Unsurprisingly, the Philippines generates more solid waste as population increases,
living standards are enhanced, and urban and rural areas are being developed.
According to a report by the Senate Economic Planning Office (SEPO), the country’s
waste generation steadily increased from 37,427.46 tons per day in 2012 to
40,087.45 tons in 2016.

Meanwhile, solid wastes produced by Philippine cities are expected to increase by


165 percent to 77,776 tons by 2025.
Residential areas produce the most amount of solid wastes at 57 percent, while
wastes from commercial establishments, institutional sources, and industrial or
manufacturing sector accounted for 27 percent, 12 percent, and 4 percent of the
total waste generated, respectively.
https://business.inquirer.net/270819/solid-waste-mismanagement-in-the-
philippines.

1
II. Objectives
We propose this project to make our community clean and safe for everyone. In this document, we will
achieve our following goals:
1.

Table of Contents
I. Executive Summary..................................................................................................................................1
Introduction.............................................................................................................................................1
Project Justification.................................................................................................................................1
II. Objectives................................................................................................................................................2

You might also like