C1 C1 C1 C1 C1 C1
C1 C1 C2 C2 LOOSE FURNITURE & EQUIPMENT PLAN LEGEND
PL2 PL2 C1 C1 MEETING ROOM 4P
PL2 30.07
C1 C1
C1
PL2 AREA NOT IN ARCHITECTURAL SCOPE OF WORKS
H
R.CS C1 C1 R.CS
C1 C1
C1 C1 HATCH DENOTES LANDLORD WORKS. CONTRACTOR TO
C1 C1 C1 C1 C1 C1 C1 C1
C1 C1 ALLOW TO COORDINATE WORKS ON SITE WITH LANDLORDS
LOCKERS LOCKERS CONTRACTOR.
C1 C1
C1 C1 TV1 C? CHAIR,
C1 C1
G REFER SCHE-03 FURNITURE & FF&E SCHEDULE FOR
T13 C1 C1
C1 C1 SPECIFICATION.
R.T07 R.T09
C1 C1 MALE T? TABLE,
UTILITIES QUIET ROOM C1 C1 REFER SCHE-03 FURNITURE & FF&E SCHEDULE FOR
30.04
C1 C1 C1 C1 SPECIFICATION.
C1 C1
QUIET ROOM EX. EXISTING ITEM TO REMAIN.
30.05 C1 C1 C1
C1 C1 INDICATES REUSED/RELOCATED FURNITURE.
AS01
CORRIDOR ALL FURNITURE RELOCATION WORKS TO BE COMPLETED
C1 C1
T13 BY BRAMLEYS. CONTRACTOR TO ALLOW TO COORDINATE
T10
C1 C1 WORKS WITH BRAMLEYS ON SITE.
F AS01 FEMALE C1 C1
R.C? REUSED/RELOCATED CHAIR,
LOCKERS
LOCKERS
C1 AS02 SPECIFICATION.
C1 C1
R.C05 PARENTS / PRAYER C1 C1 R.T? REUSED/RELOCATED TABLE,
T10 STAIR
R.LP REFER TO SCHE-06 RELOCATED FURNITURE SCHEDULE FOR
C1 PL1 PL1 PL1 BC1 C1 C1 SPECIFICATION.
AS02
C1
R.ST? REUSED/RELOCATED STORAGE UNIT,
LOCKERS CORRIDOR
PL1 PL1 REFER TO SCHE-06 RELOCATED FURNITURE SCHEDULE FOR
C1 SPECIFICATION.
C1 C1 C1
C1 C1
LOCKERS
LOCKERS
C1 C1 TO BE INSTALLED TO EXISTING TABLE.
REFER SCHE-03 FURNITURE & FF&E SCHEDULE FOR Rev Description Date Dwn Chk
COMMS DDA WC
C1 C1 STAIR C1 C1 SPECIFICATION.
C1 C1 A TENDER ISSUE 01.07.22 KA KG
EXISTING TABLE BOX. B TENDER ADDENDUM 01 11.07.22 KA KG
EXISTING TABLE BOX TO BE UPGRADED. C1 CONSTRUCTION ISSUE 25.08.22 KA KG
C1 C1 TB1
E C1 C1
REFER SCHE-03 FURNITURE & FF&E SCHEDULE FOR DETAILS. C2 REVISED CONSTRUCTION 12.10.22 SL KG
C1 C1 ISSUE - ADDITIONAL SCOPE
C1
C1 LIFT LOBBY C3 QUIET ROOM UPDATES 09.12.22 SL KG
TV1
C1 C1 C1 EX EX C1 C1
C1 C1 C1 C4 QUIET ROOM UPDATES 16.12.22 SL KG
EX C1
C1
TV1
R.CS C1 C1 R.CS
C1 C1 530 COLLINS STREET, MELBOURNE
C EX
UP UP AS03 QUIET ROOM T13 T13 QUIET ROOM
30.08 30.09
C1 C1
KITCHEN
T10
EX.J.04
SCALE 1: 100
CONSTRUCTION ISSUE
Scale @ A1 Phase Job No.
1 1 : 100 CD 9289
A 09-51 SCALE 1 : 100
Dwg No. Revision
A 05-42 C4