You are on page 1of 1

Copyright by SAUDI ENTERTAINMENT VENTURES (SEVEN).

All rights
reserved. This document may not, in whole or in part, be reproduced, stored,

01 02
transmitted or distributed in any form or by any means, whether electronic,
mechanical, by photocopy, recording or otherwise, without the prior written
permission of SEVEN. Except where otherwise expressly agreed in writing by
SEVEN, SEVEN shall have no responsibility or liability for any loss (direct,

–––––– ––––––
consequential or otherwise) which may arise from reliance on or use of this
document or the information contained therein.

Y3 Y3 DO NOT SCALE THIS DRAWING.

01
01
02
02
03
03 04
04
05
05

06 07 08 09 10

17 03 04 05 06 07 08 09 10 11 12 13
06 07 08 09 10
11 12 13 14 15
NOR
TH

M
–––––– –––––– –––––– –––––– –––––– –––––– –––––– –––––– –––––––––––– –––––– ––––––
E

16 17 18 19

Y4 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y3 Y
W

General Notes
1. ALL DIMENSIONS/SIZES ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. SHOWN PIPE SIZES ARE OUTER DIAMETERS.
3. FOR LEGEND, GENERAL NOTES & INDIVIDUAL PIPE SIZE REFER TO DWG. NO. 4MAKA08-DAR-DD-100-PL-DWG-1000-01
4. FOR MISCELLANEOUS DETAILS REFER TO DWG. NO.
4MAKA08-DAR-DD-100-PL-DWG-5001 TO 5005.
5. FOR ENLARGED DETAILS REFER TO DWG. NO. 4MAKA08-DAR-DD-100-PL-DWG-4001 TO 4007.
6. WHERE REQUIRED, PIPE SLEEVES SHALL BE COORDINATED ON SITE AND APPROVED BY STRUCTURAL ENGINEER.
7. PIPEWORK CLEANOUTS SHOULD BE ADDED ON ALL DRAINAGE PIPES EVERY 15M FOR PIPES 100MM OR SMALLER AND EVERY
22.9M FOR LARGER PIPES .
8. INSPECTION CHAMBERS DIMENSIONS ARE THE MINIMUM DIMENSIONS, FINAL DIMENSIONS TO BE VERIFIED BY CONTRACTOR
BASED ON ACTUAL VERIFIED FLOW RATES
9. ALL INDICATED PIPES INVERT LEVELS TO BE VERIFIED BY CONTRACTOR BASED ON ACTUAL COORDINATED SHOP DRAWINGS
10. SOIL, WASTE AND STORM DRAIN PIPES MATERIAL: HDPE
11. VENT PIPE MATERIAL: UPVC
12. IRRIGATION PIPE MATERIAL: HDPE
13. WATER PIPES MATERIALS:
Ø110 mm HDPE WP L/L

AC
• ABOVE GROUND: CPVC
SLOPE 1% • BELOW GROUND: CPVC
14.ALL UNDERGROUND PIPING ARE DIRECTLY BURIED BELOW FINISH AND/OR LOCATED BELOW SLAB ON GRADE. DURING
MAINTENANCE, IT MAY LEAD TO INTERRUPTION OF THE SITE OPERATION.
ANOTHER ALTERNATIVE IS TO USE ACCESSED UTILITY CULVERT AND FEASIBILITY OF THIS OPTION WILL BE STUDIED DURING
306.500

––––––
THE DETAILD DESIGN IN COORDINATION WITH THE CLIENT.
FFL

X1 LEGEND :
ABBREVIATION DESIGNATION
LL LOW LEVEL
306.400 306.400
HL HIGH LEVEL
TOS TOS
NO MECHANICAL
UG UNDER GROUND
SERVICES

AA
––––––
4MAKA08- MBL- SD- 100- PL- SHD- 10014
IL: 305.741
GD-01

IL: 306.000

IL: 305.680 IL: 305.489


IL: 305.484
NO MECHANICAL SERVICES
CLEARANCE FOR RC FOUNDATION
CONCRETE PRE-POURING TO
+303.70 TOC
4MAKA08- MBL- SD- 100- PL- SHD- 10014
CO
FCO

GD
CLEAN OUT
FLOOR CLEAN OUT

GUTTER DRAIN

X4
FCO

IL: 305.734
FCO TD TRENCH DRAIN
IL: 305.697 IL: 305.471
4MAKA08- MBL- SD- 100- PL- SHD- 10017

4MAKA08- MBL- SD- 100- PL- SHD- 10019


1 HDPE HIGH-DENSITY POLYETHYLENE

AB
VENT ARRESTER
Ø110 mm HDPE WP L/L Ø110 mm HDPE WP L/L Ø110 mm HDPE WP L/L Ø50 V UP 306.500
SLOPE 1% SLOPE 1% SLOPE 1% IL: 306.100
FFL
CONDENSATE PIPE HIGH LEVEL
SUMP-PIT DIMENSIONS ARE

–––––– (1500 x1500 x 2000mm)(LxWxD)


SSP-LG-08
306.500
FFL
CONDENSATE PIPE LOW LEVEL (UNDER GROUND)

X1
Ø25 CDP DN TO UG
IL: 306.123
SOIL PIPE
Ø90 WMF UP
IL: 305.564 TO H/L WASTE PIPE
Ø25 CDP FROM Ø90 mm HDPE WP L/L IL: 306.100
PACU DRAIN PAN IL: 306.122 Ø110 mm HDPE WP L/L
FORCE PIPE
SLOPE 1%
TELECOM
'P' TRAP Ø25 CDP FROM AHU ROOM SLOPE 1% VENT PIPE
ROOM
PACU DRAIN PAN IL: 305.743
LG 10003 03 LG 10001 01
306.500
'P' TRAP 306.500 MBL COORDINATION
Ø32 CDP DN TOFFL
UG FFL
IL: 305.754 IL: 305.748 CHECKED NAME SIGNATURE DATE
'P' TRAP
BIM COORDINATION BM ISLAM BADR 24/12/2023
IL: 305.605 ARCHITECTURAL AR OSAMA ELDEMERY 24/12/2023
Ø25 CDP FROM
PACU DRAIN PAN IL: 306.000
GD-01 LANDSCAPE LS OSAMA ELDEMERY 24/12/2023
GD-01 Ø110 mm HDPE WP L/L IL: 306.000
FD-01 IL: 305.616
Ø50 CDP UG IL: 306.032
IL: 306.000 SLOPE 1% IL: 305.766 INTERIOR DESIGN ID OSAMA ELDEMERY 24/12/2023

AA
Ø110 mm HDPE WP L/L IL: 305.748 IL: 305.956
STRUCTURAL ST ATEF ELARABY 24/12/2023
SLOPE 1%
IL: 306.012 IL: 305.627 FCO
Connect FCO CIVIL CC ATEF ELARABY 24/12/2023
IL: 306.100 IL: 306.067 Ø25 CDP DN TO UG IL: 305.632 IL: 305.759

–––––– drainpipe to
Funnel Floor ELEC ROOM Ø110 mm HDPE WP L/L IL: 305.771 Ø110 mm HDPE WP L/L
IL: 306.000 IL: 305.993 SURVEY
PLUMBING
SU
PL
MOHAMED MORTADA
MOHAMED BASIOUNY
24/12/2023

X1
24/12/2023
IL: 306.044 GD-1
drain. LG 10004 01 LOBBY SLOPE 1% SLOPE 1%
ZONE VALVE
FIRE FIGHTING FF MOHAMED BASIOUNY 24/12/2023
306.500 LOBBY LG 10033 06 306.500
Ø25 LG
CDP 10033
FROM 06 ROOM MECHANICAL ME MOHAMED BASIOUNY 24/12/2023
FFL FFL
PACU DRAIN PAN 306.500 LG 10002 01
FFL HVAC HV MOHAMED BASIOUNY 24/12/2023
'P' TRAP 306.500
FFL ELECTRICAL EL MOHAMED ANTAR 24/12/2023

LOW CURRENT LC MOHAMED ANTAR 24/12/2023

TELECOMMUNICATION TE MOHAMED ANTAR 24/12/2023

DWG QUALITY Q
BIM REFERENCE
Ø110 mm HDPE WP L/L
SLOPE 1% NO. MODEL NO. MODEL TITEL REV. DATE
01 4MAKA08-DAR-FC-100-PL-MOD-1000-00 Plumbing Revite Model 00
Floor plan-lower ground parking floor
Ø110 mm HDPE WP L/L
02 4MAKA08-DAR-FC-100-PL-DWG-1018-00
-plumbing -part 18
00

SLOPE 1% 03 4MAKA08-DAR-FC-100-CC-MOD-1018-00 Plumbing Revite Model 00

04
NO MECHANICAL
GD-1 306.400 REVISION
SERVICES
TOS
IL: 306.000 306.400 NO. DWG. No. DWG. TITLE. REV. DATE
TOS Floor plan-lower ground parking floor 00 24/12/2023
FCO 01 4MAKA08- MBL- SD- 100- PL- SHD- 10018
-plumbing -part 18
02
IL: 305.797
IL: 305.976 03
4MAKA08- MBL- SD- 100- PL- SHD- 10017

4MAKA08- MBL- SD- 100- PL- SHD- 10019


306.500
FCO IL: 305.742
Ø110 mm HDPE WP L/L FFL 04
SLOPE 1%
Ø110 mm HDPE WP L/L IL: 305.749
GD-1 IL: 306.000
SLOPE 1% Ø110 mm HDPE WP L/L RELATED DOCUMENTS, LETTERS & RFI'S REFERENCES
Ø110 mm HDPE WP L/L
SLOPE 1% SLOPE 1% NO. DOC. No. DOC. DESCRIPTION DATE
FCO 01
02
03
04
IL: 306.000
GD-01
Client

Project Management Consultant

LEAD DESIGN & SUPERVISION


CONSULTANT

1- Install a cleanout at change in direction of the drainpipes.


2- Condensate drainpipes to be insulated.
3- 90 deg elbows are not allowed to be installed in drainpipe system, use 45 deg elbows.
4- pipework cleanouts should be added on all drainage pipes every 15m for pipes 100mm or smaller and every 22.9m for larger pipes
5- Sump pits cover, and garage drains to be heavy duty ones.
6- All sump pits, trenches to be waterproof painted as per the project specification. General Contractor
7- All materials shown on the drawings should be as per respective approved material submittal and project specification.
8- Coordinate with all other trades.
9- AHU condensates drainpipes to be connected first to the funnel floor drain then to the system( TYP).

Code B. Modern Building Leaders


Sub Contractor
100 mm

Project Title

MAKKAH ENTERTAINMENT COMPLEX


Building Name

GENERAL PLAN
SCANNING SCALE

Follow approved IFC


drawing.
Drawing Title
FLOOR PLAN
50 mm

LOWER GROUND PARKING FLOOR


DRAINAGE SYSTEM LOW LEVEL
(PART 18)
DARWIN BY: DATE 24/12/2023

REVIEWED BY: SCALE 1:100

APPROVED BY: SHEET SIZE A0

Drawing & Transmital No.


10 mm

01 01_LOWER
SCALE 1:100
GROUND_PARKING FLOOR PLAN-PART PLAN-18
4MAKA08- MBL- SD- 100- PL- SHD- 10018
PROJECT CODE COMPANY CODE Development Stage BUILDING DISC D. TYPE DRAWING NUMBER

File Path

You might also like