You are on page 1of 2

PATRIND HYDRO POWER PLANT

WEEKLY INTERNSHIP REPORT Revision


00 Issue No. 01
FORM No.
Date of Issue: 09-09-2022
Documents Number PHPP-WIR-F76 Page 1 of 2

Weekly Internship Report

Amir Latif Afnan Gillani


Mentor Name: Mentee Name:

Operation TEC
Department: Department:

Information submitted by the Mentee to Mentor:


Generator
 Generator used in Patrind Hydropower Plant
 Generator Parameters
 Active power
 Reactive Power
 Power factor
 Power Triangle
 Technical parameters of generator
 Generator Capability Curve
 Generator Operational Limit
 Generator check points / Sheet during operation
Measauring and Monitoring System
 Partial Discharge Measurement
 Causes of PD
 Measurement of PD
 Features
 Operation
Vibration Measurement
 MLS-9 Low frequency Vibration sensor
 JS-70 Integratted eddy current displacement transducer
 Vibration monitoring panel

Controlled Copy
PATRIND HYDRO POWER PLANT
WEEKLY INTERNSHIP REPORT Revision
00 Issue No. 01
FORM No.
Date of Issue: 09-09-2022
Documents Number PHPP-WIR-F76 Page 2 of 2

Observations by the Mentor:

Date: 11/01/2023 Mentor’s Signature: ________________

Controlled Copy

You might also like