You are on page 1of 2

PATRIND HYDRO POWER PLANT

WEEKLY INTERNSHIP REPORT Revision


00 Issue No. 01
FORM No.
Date of Issue: 09-09-2022
Documents Number PHPP-WIR-F76 Page 1 of 2

Weekly Internship Report

Amir Latif Afnan Gillani


Mentor Name: Mentee Name:

Operation TEC
Department: Department:

Information submitted by the Mentee to Mentor:


 Introduction of Hydro power plant .
 Main and Auxiliary equipment of Hydro power plant .
 Mechanical and electrical equipment .
 Type of turbine
 Working principle and construction of Francis Turbine.
 Mechanical Drawing of turbine, its parts and construction .
 Overview Rotatory parts and Embedded .
 Overview MIV , Governor , Servomotor , Distributor assembly .
 Drawing of each part .
Observations by the Mentor:

Controlled Copy
PATRIND HYDRO POWER PLANT
WEEKLY INTERNSHIP REPORT Revision
00 Issue No. 01
FORM No.
Date of Issue: 09-09-2022
Documents Number PHPP-WIR-F76 Page 2 of 2

Date: 11/01/2023 Mentor’s Signature: ________________

Controlled Copy