PATRIND HYDRO POWER PLANT

WEEKLY INTERNSHIP REPORT Revision


00 Issue No. 01
FORM No.
Date of Issue: 09-09-2022
Documents Number PHPP-WIR-F76 Page 1 of 1

Weekly Internship Report

Amir Latif Afnan Gillani


Mentor Name: Mentee Name:

Operation TEC
Department: Department:

Information submitted by the Mentee to Mentor:


 Generator, Its construction and working.
 Layout of Generator: four layers of Generator.
 Main and auxiliary part of generator.
 Stator assembly and Rotor assembly.
 Upper bracket , lower bracket , Thrust bearing , Lower guide bearing.
 Mechanical Drawing of main parts.
Observations by the Mentor:

Date: 11/01/2023 Mentor’s Signature: ________________