PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR


Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA FABRIKASI, MEMBEKAL DAN MENGHANTAR PINTU AIR AUTOMATIK FLAP


SERTA AKSESORI LAIN YANG BERKAITAN BAGI JABATAN PENGAIRAN DAN SALIRAN
NEGERI SELANGOR
NO. SEBUTHARGA : JPS/N/ME/B13/17/2018(SH)

Bil Perkara Unit Kuantiti Kadar Harga

1.0 PRELIMINARIES
1.1 Provide Insurance of the Works, Public Liability L/Sum L/Sum
Insurance, SOCSO/Workmen Compensation
Insurance and other related issues.

1.2 The contractor shall delivery to BPME, JPS Selangor L/Sum L/Sum
High Density Polyethylene (HDPE) Automatic Flap
Gate complete with other related accessories.

1.3 To provide report of work done before, during and Set 3


after completion (Soft Copy & Hard Copy)

2.0 SCOPE OF WORKS


2.1 The contractor shall fabricate and supply to BPME,
JPS Selangor High Density Polyethylene (HDPE)
Automatic Flap Gate complete with other related
accessories as in accordance to the specification:-
Nos 1
i) Size 2.4m x 2.4m

ii) Size 1.8m x 1.8m Nos 1

iii) Size 1.4m x 1.8m Nos 1

iv) Size 900mm x 900mm Nos 1

v) Size 900mm Ø Nos 1

vi) Size 600mm Ø Nos 1

1/3
PENTING : DOKUMEN MEJA INI HANYA UNTUK RUJUKAN DAN TIDAK DIANGGAP SEBAGAI DOKUMEN SEBUTHARGA

JABATAN PENGAIRAN DAN SALIRAN NEGERI SELANGOR


Sebutharga Untuk Kerja Bahagian Perkhidmatan Mekanikal Dan Elektrikal

KERJA-KERJA FABRIKASI, MEMBEKAL DAN MENGHANTAR PINTU AIR AUTOMATIK FLAP


SERTA AKSESORI LAIN YANG BERKAITAN BAGI JABATAN PENGAIRAN DAN SALIRAN
NEGERI SELANGOR
NO. SEBUTHARGA : JPS/N/ME/B13/17/2018(SH)

3.0 OTHERS WORK


3.1 The contractor shall provide the detail design Set 2
drawing and design calculation of High Density
Polyethylene (HDPE) Automatic Flap Gate approve
by Professional Engineer.

3.2 The tendered shall provide or bear all the incurred L/Sum L/Sum
cost for two (2) JPS officer to visit the assembly /
manufacturing plant. (Factory Acceptance Test)

3.3 Testing and Comissioning (T&C) L/Sum L/Sum

CARRIED TO COLLECTION