We need IFC drawings no later than one week from RFA date or the PM must be notified within 24 hours
of receipt if this cannot be achieved.
Also, when releasing Issue For Construction drawings please provide the following;
IFC Review documents and files for PM/TL review within 48 hours prior to IFC release date;
• Provide the PDF drawings (Erection & Detail sheets) for PM/TL review
• Provide the latest IFC model
• Provide the bolt summaries
After the IFC review has been made and corrections incorporated into the model, post the final Tekla XML
IFC file on the FTP and provide the link to download;
• Fab File
- XML File
- CNC Folder (for all sub-material (Plate [Bent, Profile or PM], Angles, Channels, Beams & HSS)
- Drawings Folder (Detail, DetailSheet, ErectionSheet, GatherSheet & Submaterial)
• Updated bolt summaries
• Updated IFC model
• All XML and DXF files (For guardrails and handrails)
• Dwg Log
• Weight and Pc Count
By:
SUBMITTAL TRANSMITTAL
Via: ✔ Electronic Transfer Hand Deliver Date: March 31, 2023
Joeris General Contractors SPEC DIVISION NO:
To:
19350 Tomball Pkwy Suite 110 05 12 00.01
Houston, TX 77070
Attention:
Jason Patterson
Description:
Submittal: 05 12 00.01_Anchor Bolts (Myrex)
REMARKS:
ACTION:
Reviewed Rejected
ENCLOSURES (if enclosures are not as noted, please inform us immediately.) Date: March 31, 2023 PBK Architects, Inc.
CC: File
Ryan Attebery, CISD
Leo Franco, PBK Field
11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P 713-965-0608 \\ F 713-961-4751 \\PBK.com
Project Name: Enter Project Name Here
Owner: Enter Owner Name Here
Project No.: Enter Project Number Here
THE CONTRACTOR SHALL REVIEW ALL SUBMITTALS FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS AND SHALL
CERTIFY THE REVIEW BY A STAMP NOTING THAT THE SUBMITTAL HAS BEEN "APPROVED" AND WHICH BEARS THE
SIGNATURE OF AN AUTHORIZED REPRESENTATIVE OF THE CONTRACTOR AND THE DATE. SUBMITTALS WHICH DO NOT
REFLECT THE CONTRACTOR'S APPROVAL, SIGNATURE AND DATE; OR DO NOT APPEAR TO HAVE BEEN REVIEWED BY
THE CONTRACTOR, WILL BE RETURNED WITHOUT REVIEW. THE ARCHITECT/ENGINEER SHALL NOT BE RESPONSIBLE
FOR DELAYS CAUSED BY REJECTION OF INADEQUATE OR INCORRECT SHOP DRAWINGS, AND THIS RESPONSIBILITY
SHALL LIE SOLELY WITH THE CONTRACTOR. OMISSION FROM THE SHOP DRAWINGS OF ANY REQUIREMENTS OF THE
CONTRACT DOCUMENTS SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF COMPLYING WITH THE
OMITTED REQUIREMENTS, EVEN IF THE SHOP DRAWINGS HAVE BEEN REVIEWED AND RETURNED.
RESPONSES TO QUESTIONS AND RFI'S, COMMENTS MADE DURING THE REVIEW OF SUBMITTALS, AND DIRECTIVES
PROVIDED IN ANY FORM, BY THE ENGINEER TO THE CONTRACTOR DURING THE CONSTRUCTION PROCESS ARE
INTENDED TO BE CLARIFICATIONS OF THE CONTRACT DOCUMENTS OR CORRECTIONS TO THE PERCEIVED
INTERPRETATION OF THE INTENT OF THE CONTRACT DOCUMENTS BY THE CONTRACTOR. SUCH CLARIFICATIONS AND
CORRECTIONS ARE NOT INTENDED TO REPRESENT A CHANGE IN COST OF THE PROJECT TO THE OWNER AND ARE
CONSIDERED TO BE INFERABLE FOR THE CONTENT OF THE CONTRACT DRAWINGS OF CONSISTENT WITH INDUSTRY
STANDARDS OF CONSTRUCTION. IF THE CONTRACTOR DETERMINES THAT SUCH CLARIFICATIONS AND CORRECTIONS
HAVE AN IMPACT ON THE COSTS OF THE PROJECT TO THE OWNER, THE CONTRACTOR SHALL SUBMIT A CHANGE
ORDER REQUEST WITH DETAILED PRICING INFORMATION TO THE ARCHITECT BEFORE PURCHASING, DETAILING,
FABRICATING, OR INSTALLING ANY COMPONENT RELATED TO SUCH CLARIFICATIONS AND CORRECTIONS.
SUBMITTAL REVIEW
NO EXCEPTIONS TAKEN REVISE AND RESUBMIT
COMMENTS INCLUDED
Corrections or comments made on the shop drawings during this review
do not relieve Contractor from compliance with requirements of the
drawings and specifications. This check is only for review of the general
compliance with the information given in the contract documents. The
Contractor is responsible for: confirming and correlating all quantities and
dimensions, selecting fabrication processes and techniques of
construction, coordinating his or her work with that of all other trades and
performing all work in a safe and satisfactory manner.
John Kubala, PE
Name: ___________________________ 3/30/2023
Date: _______________________
Remarks
______________________________________________
Signed: Date:
Notes:
MYREX INDUSTRIES Page 1 of 1
1912 BUSCHONG STREET Date : 3/24/2023
HOUSTON, TEXAS 77039 Transmittal #: 00012
Phone: 713-691-5200 Job #: 11977
Conroe ISD North Transportation Center
THIS PROJECT WILL NOT BE PROCESSED FOR FABRICATION WITHOUT RETURNED APPROVAL
DRAWINGS AND 100% OF THE QUESTIONS ANSWERED.
A) All clouded dimensions are requests for verification - if drawings are approved without comments, Myrex
will assume dimensions shown to be correct. Any corrective work required due to approval of incorrect
dimensions will not be chargeable to Myrex's account.
B) Please supply all field verifies and sub-contractor coordination submittals with the returned approval
drawings to avoid delays in detailing and fabrication.
C) Roof frame information is to be supplied with returned approval drawings in order to avoid delays and/or
additional costs for labor or special deliveries. (If Applicable)
By:
G BL
5
4
AND LOCATIONS. REF DETAIL 1/S-304 -3' - 6" GB1 G
BY TL
C
M
INDICATES TRENCH DRAIN.
M YG
TL C
B
30/72
BL
FD
D
-3' - 6"
G
REF NOTE 5
GB3
CO
REF DETAIL 4/S-305
L
INDICATES PRE-ENGINEERED
STAIR COLUMNS BY OTHERS 6'-6"
SIM AT GB
3/ S-312
3
O BE
C AND EACH
24/60 GB1
ALL COSTS,
7/ S-310
L
CUTTING, -3' - 6" CO
GB3
UR BACKS, G
GB1 D
ED TO RE- BL 4/ S-312
HE GC SHALL 24/60 TL C
M YG GB4
L INTERIOR -3' - 6" B
ER DICIPLINES
GB1
FD 24/60
GB1
-3' - 6" FD
HS
S6
FD 5'-0" 30/72
X6
1/ S-312 FD
X1
-3' - 6"
/4
FD
FD 5'-8" 17'-0" 3
24/60
-3' - 6" 1/ S-312
7/ S-310 24/60 FD
-3' - 6" 30/72 4/ S-312
FD -3' - 6"
24/60 GB4
-3' - 6"
HS
24/60 FD
S6
24/60
X6
-3' - 6"
X1
-3' - 6"
GB1
/4
GB3
1/ S-312
24/60 4/ S-312
1/ S-312 -3' - 6"
FD GB4
GB3
1/ S-312
GB1
LLS. 30/72
HS
GB1
GB1 -3' - 6"
S6
OF WALL (TYP.) 24/60 SIM AT GB
X6
-3' - 6"
X1
ONDITIONS (TYP.) 3/ S-312
GB3
/4
GB1 GB1 GC N
NEW
GB3
REFE
BUILD
WHERE NEW GRADE BEAMS FOR
7/ S-310
1/ S-312
24/60 24/60
-3' - 6" CONNECT TO EXISTING LOCA
-3' - 6"
FOUNDATION,
GB2
REF DETAIL 3/S-305
GB2
L
7/ S-310
CO
G
D 4/ S-312
BL
TL C
18/36 GB2 18/36 M YG GB4
-3' - 6" B
-3' - 6"
7/ S-310
1/ S-312
30/72
5'-0" -3' - 6"
SIM AT GB
3/ S-312
GB1
GENERAL SLAB WITHIN THIS AREA TO
BE 6" THICK SLAB WITH #4 BARS AT
12" OC EACH WAY AT MID-HEIGHT.
FOR AREAS OF SLAB INTENDED TO
SUPPORT LIFTING EQUIPMENT L
CO 2'-6"