Professional Documents
Culture Documents
25m LEGEND:
Top of Curb = BM+0.15m D6 ROAD
BOUNDARY LINE BM +0.00m = EL +2.40m
SETBACK LINE
BM+0.05m BM : BENCH MARK
STOP
BM+0.42m BM+0.1m
AV : AVERAGE LEVEL
ROAD -0.2m=EL+2.2m
PARKING AREA BM-0.03m
EL : ELEVATION LEVEL
STOP
Top of Curb = BM+0.15m
GROUND FLOOR
Road AV=BM-0.12m=EL+2.28m GFL=BM+0.8m (EL+3.2m)
STOP STOP
GFL : GROUND FLOOR LEVEL
STOP
BM+0.8m
STOP
BM+0.8m
BM+0.04m : DESIGN LEVEL
AV=BM
Park
BM+0.06m
STOP
i=2% i=2% i=2%
Road N3
STOP
STOP STOP STOP STOP Top of Curb = BM+0.15m
RESIDENTIAL
BM+0.3m BM+0.75m
BM-0.11m
32°
Up
BM+0.16m
BM+0.64m
Up Up
58°
Up
.5m
BM+0.8m 135
° BM+0.16m
+2
EL
20 FT
BM+0.64m
=
.1m
8 TON
i=2%
BM+0.8m 20 FT BM+0.65m
+0
°
8 TON
BM
135
i=
BM+0.64m
2%
A V=
Up
ad
Bike Parking 2
ET
Ro
507 bikes
RE
ST
i=
G
2%
ON
VU
BM+0.34m
NG
SETBAC
Top of Curb =BM+0.15m
HU
K LINE
BM-0.04m BOUND
BM+0.14m
BM+0.54m
ARY LI
NE BENCHMARK
1A NATION
AL ROAD
Road A ±0.00m
BM+0.61m V=BM- EL +2.40m
0.08m
=El+2.
BM-0.02m 32m
Owner Architecture Consultant Design Consultant Revision Date Description Project Name Drawing Title Drawing No
Aeon Retail Tan An External plan - Site Level Plan
00 December, 2022 Tender Submission Address: Tan An, Long An, Vietnam
PLANTEC ARCHITECTS COMPANY LIMITED SEMBA CORPORATION
- - - Design Stage: For Tender Submission Scale: A1:1/500 - A3:1/1000
A13-01