Dubai Villa Electrical Power Layout
Dubai Villa Electrical Power Layout
±0.00M
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE NOTED.
2. ALL LEVELS ARE IN METERS UNLESS
OTHERWISE NOTED.
3. THIS SHOULD BE READ IN ACCORDANCE WITH
STRUCTURAL AND MEP DRAWINGS.
+0.15M 4. VERIFY ALL THE DIMENSIONS PRIOR TO
EXECUTION.
DN
(TO UG.PRM)
-1 BUILDING (B+G+13+R)
-2
KEY PLAN
SHOP DRAWING
W/P
W/P
-17 W/P
MAN HOLE
W/P
ABOVE
20A
TPN ISO
40A SHAFT
TPN ISO
ABOVE
20A
SPN ISO
F
SUMP PUMPS
DIESEL
ELECT.
SP
BLOCK: PLOT NO.:
20A
TPN ISO AL KARAMA
BF-AC-01
3180133
UG UG
WATER TANK AS-BUILT
PUMP ROOM PROPOSED G+3 BUILDING ON
-2.70 M -2.70 M PLOT NO 3180133 (RC1_p_s/4) AT
AL KARAMA, DUBAI, UAE.
EP-100 REVISION
00
SHEET SIZE : A1
4 7 PERSPECTIVE :
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE NOTED.
2. ALL LEVELS ARE IN METERS UNLESS
ATTIC SLAB OTHERWISE NOTED.
ACCESS
3. THIS SHOULD BE READ IN ACCORDANCE WITH
Y8-DB-GYM
B W/P
SP
BUILDING (B+G+13+R)
RAMP
GUARD
(600MM CLEAR
-1
GF-AC-07
SP
SUB STATION -2 SHOP DRAWING
W/P
GYM 12 U
GARBAGE (FOR RESIDENCE ONLY)
ROOM
W/P RECYCLING/ TOILET
LEGEND & SYMBOL - ELECTRICAL
SP
32A
TPN ISO R8-DB-GYM
C
SP
TOILET
WH
(950 MM CLEAR
W/P
ATTIC SLAB
ACCESS 1 W/P
-NEIGHBOR PLOT-
LV ROOM
(PLOT NUMBER - 3180593)
A
VIEW
WALL STOPS AT
D ATTIC SLAB C.BANK-2 FALSE CEILING LVL MANHOLE
W/P
1 8
VIEW
VIEW
ACCESS B C
TO UGWT
W/P
UP W/P
SP
-SIKKA-
FACP 9
15 KVA
UPS
DB-TEL
E 24X7 WITH BYPASS
20A
SPN ISO
FOR UPS SUPPLY
LOBBY
SHAFT ABOVE
SP
TOI. TOILET
REV DESCRIPTION DATE DRW BY CHKD
AS/SPECS
ALUMINUM
ENCASEMENT
WATER
METER
Y1-DB-SH 2 ENTRANCE
BLOCK:
AL KARAMA
PLOT NO.:
3180133
SP GT
AS-BUILT
SHOP- 02 MH-01 PROPOSED G+3 BUILDING ON
PLOT NO 3180133 (RC1_p_s/4) AT
R1-DB-SH 1 AL KARAMA, DUBAI, UAE.
SHOP- 01 SP
G MH-02
(1:12 SLOPE)
PRESSURE ALRIYAMI
B1-DB-SH 2 BREAK MANHOLE
RAMP
3
2
SP 12 U
1
UP 12 U
DB-SHOP-02 DB-SHOP-01
I
PLOT LIMIT PLOT LIMIT
BREACHING INLET
EP-101 REVISION
00
SHEET SIZE : A1
PERSPECTIVE :
650
PLOT LIMIT PLOT LIMIT NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE NOTED.
WH
2. ALL LEVELS ARE IN METERS UNLESS
1550
KITCHEN BEDROOM
CCU
BUILDING (B+G+13+R)
W/P
Y3-DB-104 KEY PLAN
SHOP DRAWING
LIVING ROOM BEDROOM 1 BEDROOM 2 LIVING ROOM
LEGEND & SYMBOL - ELECTRICAL
RWP
TF-AC-2A 1
DB-104 7 6
5
12 U WASH
BASIN
R3-DB-104 TOI.&
SP
BATH
R3-DB-103
4
WH
R3-DB-103 R4-DB-104 5
1 SHOWER
AREA
2 WC
3 W/P
WASH
WH BASIN
W/P
3 3 5
@LL
1
7
6
7
6
1
GB SHAFT W/P
SP
SP
UTILITY WASH
BASIN
TOI.&
WC WC
TOI.&
WASH
BASIN SHOWER
TF-AC-2B W/P
LIFT) 2
SP
Y2-DB-103 Y5-DB-103 4
AREA WC
3
KITCHEN TF-AC-1A
BATH BATH
SP
2 2
DB-103 8 W/P
4
SHOWER TF-AC-1B SHOWER
4
AREA AREA
WH
5
W/P
TF-AC-1C
TF-FCU-05
LOBBY
@LL
SP
W/P
@LL
REV DESCRIPTION DATE DRW BY CHKD
5 5
2 ROW
SHOWER TF-AC-3B SHOWER
ROOM ROOM
UTILITY
R5-DB-102
KITCHEN DB-102 4
AREA AREA
4
SMDB
SP
TOI.&
TF-AC-3A
2 2
TOI.& DB-101
BATH BATH
SP
4
REFRIGERATOR
3
12 U WASH
WC WC
WASH 12 U
SHOWER
AREA TF-AC-4B
2 WC BLOCK: PLOT NO.:
SP
BASIN BASIN
AL KARAMA
3180133
SP
@LL 6 6
1
7
WH 3 3
7
1
R6-DB-101 5
AS-BUILT
WASH PROPOSED G+3 BUILDING ON
R4-DB-101 7 6
5
BASIN
WH 1
4
SHOWER 2 WC
3
PLOT NO 3180133 (RC1_p_s/4) AT
AL KARAMA, DUBAI, UAE.
R3-DB-102 AREA
R3-DB-102
SP
WASH MR. SAIF MUBARAK SAIF
R3-DB-101 7 6
5 DE
SE-01
BASIN
1
ALRIYAMI
B3-DB-102
UCC
Y3-DB-102 @LL
Y3-DB-101
KITCHEN BEDROOM
R3-DB-101
TERRACE TERRACE
WH
Karnafuly Electromechanical
650 Works L.L.C
PLOT LIMIT PLOT LIMIT KARNAFULY
P.O Box: 237788
E-mail:karnafuly12@gmail.com
J 07 / 22
DRAWING NO.
DRAWN BY:
OMOR
CHECKED BY:
ENG. KAMRUL
DATE:
06.09.2023
SCALE / SHEET
EP-102 REVISION
00
SHEET SIZE : A1
4100 3500 3650 3700 2730 3700 PERSPECTIVE :
ELEVATION PROJECTION
LINE BELOW (+3.95M LVL) AS REVISED
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
PLOT LIMIT PLOT LIMIT OTHERWISE NOTED.
2. ALL LEVELS ARE IN METERS UNLESS
A OTHERWISE NOTED.
W/P 3. THIS SHOULD BE READ IN ACCORDANCE WITH
1200
W/P STRUCTURAL AND MEP DRAWINGS.
4. VERIFY ALL THE DIMENSIONS PRIOR TO
EXECUTION.
B +13.85M FFL
BUILDING (B+G+13+R)
TECHNICAL ROOF
3260
KEY PLAN
+14.90M FFL
SHOP DRAWING
W/P
C DB-ROOF
W/P
BATH
B7-DB-P.H W/P
SP
GB SHAFT W/P
LIFT LOBBY
1900
R3-DB-P.H
R6-DB-RF 27 DN
SP
26
W/P Y4-DB-RF
KIDS ROOM
19810
AL KARAMA
B3-DB-P.H 3180133
12 U DB-PENT HOUSE PWD. RM.
SP
B7-DB-P.H AS-BUILT
R5-DB-P.H PROPOSED G+3 BUILDING ON
Y5-DB-P.H B4-DB-P.H PLOT NO 3180133 (RC1_p_s/4) AT
AL KARAMA, DUBAI, UAE.
R3-DB-P.H
3550
R4-DB-P.H W/P
KITCHEN
MR. SAIF MUBARAK SAIF
LIVING ROOM B3-DB-P.H B2-DB-P.H ALRIYAMI
R6-DB-P.H
CCU
DINING
WH
G
W/P
W/P
Architectural & Engineering Consultants
P.O. BOX 22543, DUBAI, UAE TEL: 04-2942889 FAX:04-2942890
E-MAIL : egecdxb@eim.ae Web : www.ecogreenuae.ae
3250
H
1200
Karnafuly Electromechanical
Works L.L.C
W/P W/P P.O Box: 237788
I KARNAFULY E-mail:karnafuly12@gmail.com
LINE BELOW (+3.95M LVL) PENT HOUSE FLOOR PLAN DRAWING NO. SCALE / SHEET
4 SCALE 1:100
EP-103 REVISION
00
SHEET SIZE : A1
PERSPECTIVE :
E-2
AR-06
AS REVISED
B NOTES:
AR-07 1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE NOTED.
1 2 3 4 5 6 7 2. ALL LEVELS ARE IN METERS UNLESS
OTHERWISE NOTED.
3. THIS SHOULD BE READ IN ACCORDANCE WITH
21380
STRUCTURAL AND MEP DRAWINGS.
4. VERIFY ALL THE DIMENSIONS PRIOR TO
4100 3500 3650 3700 2730 3700 EXECUTION.
ELEVATION PROJECTION
LINE ABOVE (450 MM)
BUILDING (B+G+13+R)
1200
B SHOP DRAWING
TECHNICAL ROOF
3260
+14.90M FFL
+19.40M FFL
RYB6-DB-101 DB-PH-R7 DB-PH-RYB8
C B5-DB-101
W/P
CAT LADDER AS/SPECS
REFER DWG NO: AR-09
W/P
RWP
B5-DB-104 AR-05 RYB-DB-104 (FUTURE AR-05
LIFT)
RYB6-DB-201
+19.40M FFL
W/P
B8-DB-203
D Y8-DB-203
RYB7-DB-203 W/P
1900
B5-DB-201
+19.40M FFL
E-3 E-4
19810
B8-DB-104
E
AR-06 +19.40M FFL RYB-DB-104 AR-06
+18.20M FFL Y8-DB-202
W/P
R6-DB-RF RYB7-DB-102
1900
B8-DB-103
+19.40M FFL Y8-DB-103 B8-DB-102 REV DESCRIPTION DATE DRW BY CHKD
RYB7-DB-103 B8-DB-202
B8-DB-102 Y8-DB-102
3550
+19.40M FFL
W/P
AL KARAMA
W/P 3180133
+19.40M FFL
R8-DB-LL Y9-DB-LL
AS-BUILT
G PROPOSED G+3 BUILDING ON
Y8-DB-LL B8-DB-LL PLOT NO 3180133 (RC1_p_s/4) AT
B10-DB-LL
AL KARAMA, DUBAI, UAE.
A B9-DB-LL Y10-DB-LL R10-DB-LL A
+19.40M FFL
AR-07 AR-07
3250
H
1200
I
PLOT LIMIT PLOT LIMIT Architectural & Engineering Consultants
P.O. BOX 22543, DUBAI, UAE TEL: 04-2942889 FAX:04-2942890
E-MAIL : egecdxb@eim.ae Web : www.ecogreenuae.ae
ELEVATION PROJECTION
LINE ABOVE (450 MM)
E-1 B
AR-06 AR-07
Karnafuly Electromechanical
Works L.L.C
P.O Box: 237788
KARNAFULY E-mail:karnafuly12@gmail.com
J 07 / 22
DRAWN BY:
OMOR
CHECKED BY:
ENG. KAMRUL
DATE:
06.09.2023
EP-104 REVISION
00