2. MAINTENANCE DATA
________________________________________________________________
Start of downtime/Activity: 20230405-09:20 End of downtime/Activity:
Complaint/Problem: BUCKET LOCK PIN MISSING Duration, hours:
3. OPERATIONS DATA
________________________________________________________________
3.1. Task List
PLAN ACTUAL
OP # Operation Description Start End Work Manpower Start End Work Manpower
(Hrs) (Nos) (Hrs) (Nos)
0010 BUCKET LOCK PIN MISSING 20230405- 20230405- 4.0 2
09:25 11:25
3.2. Manpower
Work done, hrs
OP # Supervisor Team Lead Tech 1 Tech 2 Tech 3 Tech 4 Tech 5 Tech 6 Tech 7
0010
3.3 Materials
ITEM # Material # Description Qty UoM Reservation / Operation Remarks
Requisition #
0010 5005212 01580-12016; NUT 5.000 PC 0000087514/0001 0010
0020 5004608 362-46-11210; BOLT 5.000 PC 0000087514/0002 0010
Page 1 of 2
ITEM # Material # Description Qty UoM Reservation / Operation Remarks
Requisition #
Page 2 of 2