You are on page 1of 1

3.8 4 4.

3
ADJACENT TENANT
RTU

STAFF OASIS SD-1


100
HEIGHT 10'-0"
5 EF-1 RG-1
CEILING ACT SD-2
80 • •• • • •
250 • •• • • • • •• • • • T

MECHANICAL CODED NOTES :

• • •• • • • • 12 1. MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL


1818 CORNWALL AVE.
13 TF-1 8. SPRINKLER SYSTEM THROUGHOUT SPACE. PROVIDE NEW VANCOUVER, B.C., V6J1C7
100 • •• • • • •• • • • •• • • • • • • •• •• •• • • • • •• • • • • • • • • • •• •• • •• • ••••••••••••••••••••••••••••••••••••••••••••••••••
HEADS AS REQUIRED TO ACCOMMODATE LAYOUT. SPRINKLER
A/CP-PBS REMOTE SENSOR AS SHOWN MOUNTED AT 4 FT. HEADS SHOWN FOR LOCATION/CEILING COORDINATION ONLY.
D.9 11 (TYP.) ABOVE FINISHED FLOOR. COORDINATE EXACT LOCATION WITH ALIGN SPRINKLER HEADS WITH THE ADJACENT CEILING
TENANT. THE ENTIRE CONTROL SYSTEM SHALL BE PROVIDED
COMPLETE IN EVERY RESPECT BY THE MECHANICAL
ELEMENTS WHERE CEILINGS OCCUR. STAMPED DESIGN
DRAWINGS TO BE SUBMITTED BY SPRINKLER CONTRACTOR BRIDGEPORT VILLAGE
CONTRACTOR. ORDER WITH THE HVAC EQUIPMENT. THE
E CONTROL SYSTEM SHALL INCLUDE THE FOLLOWING
AND APPROVED BY LULULEMON. SUBMIT A COPY OF THE
RG-2 SG-2 SPRINKLER SHOP DRAWINGS TO THE LANDLORD.
225 COMPONENTS AND FUNCTIONS: 7381B SW BRIDGEPORT RD
TG-2 7 TIGARD, OR 97224
9. ZD-1 :
· AUTOMATIC OCCUPIED/UNOCCUPIED OPERATION WITH

10"x12"
PROGRAMMABLE THERMOSTAT. CONTRACTOR SHALL FURNISH AND INSTALL A ZONE DAMPER
TG-2 7 · THE SYSTEM SHALL AUTOMATICALLY INDEX EQUIPMENT TO WITH CONTROLS EQUAL TO YOUNG REGULATOR #2000.
4 2 FURNISH #2075 ROUND DAMPER OR #2085 RECTANGULAR
(TYP.) ADJACENT TENANT THE HEATING, COOLING, AND OCCUPIED AND UNOCCUPIED ARCHITECT OF RECORD
M611 M611 DAMPER, SIZED FOR DUCT INDICATED ON THE PLAN, WITH
RTU MODES OF OPERATION.
· CONTINUOUS SUPPLY FAN OPERATION MUST BE MAINTAINED MODEL #T-312-CE ZONE THERMOSTAT MOUNTED AT 48" A.F.F.
4.7 FITROOMS 5 5.6 6 DURING OCCUPIED HOURS. WHERE INDICATED ON THE PLAN. THE DAMPER AND SUSANNA CHAN, AIA, NCARB
ZD ZD-1 • •• • • • THERMOSTAT SHALL BE MODULATING TYPE AND CAPABLE OF
· OUTSIDE AIR SYSTEMS SHALL INCLUDE A MOTORIZED
HEIGHT 9'-6" DAMPER INTERLOCKED TO CLOSE WHEN THE UNIT SUPPLY AUTO-CHANGEOVER. MOUNT CHANGE-OVER SENSOR IN THE OR LICENSE NO: ARI-13711
CEILING GWB FAN IS DE-ENERGIZED. DUCT PER MANUFACTURER'S PRINTED INSTRUCTIONS, SET
OFFICE SD-1 SG-2 FOR MIN. OPENING TO BE 30%. 120V. CONNECTION BY THE 9425 SHORE ROAD, 3D
200 9 225
2. RTU-1&2 - NEW ROOFTOP UNITS ELECTRICAL CONTRACTOR. ALL LOW VOLTAGE SYSTEMS BY BROOKLYN, NY 11209
HEIGHT 8'-0" THIS CONTRACTOR.
T
T-STAT CONTRACTOR SHALL FURNISH AND INSTALL A ROOF MOUNTED 327-994-9411
CEILING GWB T
T
RTU-1&2 SG-2
AIR TO AIR HVAC UNIT AT EXISTING LOCATION. SEE ROOF TOP SUSANNA.T.CHAN@GMAIL.COM
3 UNIT SCHEDULE FOR FURTHER INFORMATION. CONTRACTOR 10. MOUNT CO2 SENSOR BETWEEN 48" AND 60" AFF FOR DEMAND
1 225
M611 MUST VERIFY MODEL NUMBERS AND ELECTRICAL CONTROL VENTILATION. THE MINIMUM CODE REQUIRED ARCHITECT
(TYP.) 7 TG-3 14 14 14 REQUIREMENTS PRIOR TO INSTALLATION. SUPPLY AND OUTDOOR AIR CFM WILL BE MAINTAINED WHENEVER THE
14 14
RETURN AIR DUCT CONNECTIONS TO RTU SHALL BE MADE SPACE IS OCCUPIED REGARDLESS OF C02 SENSOR CONTROL.
RG-1 3 SENSOR FULL SIZE OF EQUIPMENT OPENING WITH FLEXIBLE DUCT
SG-2 1 10
CO2 RTU-1 CONNECTIONS AT UNIT. INCLUDE A COMPLETE ECONOMIZER 11. BOTTOM OF DUCTWORK HEIGHT TO BE COORDINATED WITH
225 SD
PACKAGE WITH ALL CONTROLS AND WIRING FACTORY
20"x12"

S
ARCHITECTURAL ELEMENTS. DUCTWORK TO BE MOUNTED NOT
(E) CEILING @ BACK DOOR MOUNTED. UNIT SHALL BE FURNISHED WITH TWO SETS OF HIGHER THAN 14'-0" AFF. FIELD VERIFY PRIOR TO BID THE 14'-0"
8 MERV 8 FILTERS. CONTRACTOR TO REPLACE FILTERS PRIOR CAN BE ACHIEVED.
• •• • • • • •• • • •
HEIGHT 9'-0" (TYP.)
11 10 TO TURNING STORE OVER TO TENANT. PROVIDE UNIT WITH
SD-1 SD-1 M611 M611 MANUFACTURERS OPTIONAL POWER EXHAUST IF AVAILABLE.
CEILING (E) GWB 175 175 ALL ROOF WORK INVOLVED WITH SETTING OF THE ROOF 12. PROVIDE DOOR WITH 18"X18" DOOR GRILLE. TITUS MODEL
MEP ENGINEER
SD-4 SD-4 SD-4 SD-4 CT-700 OR EQUAL.
RG-3 CURB ADAPTOR AND UNIT SHALL BE DONE BY THE
HALLWAY 20"x14" 20"x18" 20"x14"
200 RG-3 200 200 RG-3 200
LANDLORD'S ROOFING CONTRACTOR AT THE GENERAL
CONTRACTOR'S EXPENSE UNLESS NOTED OTHERWISE. 13. TF-1
HEIGHT 9'-2" • •• • • • • •• • • • GENERAL CONTRACTOR SHALL PROVIDE ANY ADDITIONAL FANTECH CENTRIFICAL INLINE TRANSFER FAN MODEL FG 4XL
M-Engineering
CEILING GWB 5 • •• • • • • •• • • • STRUCTURAL STEEL REQUIRED TO SUPPORT RTU, PER SHALL BE FURNISHED AND INSTALLED BY MECHANICAL 
(TYP.) LANDLORD'S REQUIREMENTS. CONTRACTOR. EXHAUST CAPACITY SHALL BE 100 CFM UP TO 
RTU-1 M611 • •• • • • 20"x14"
RESTROOM • •• • • • • •• • • • 4000 4 2 12"x14" 0.75" S.P. REFER TO PLANS FOR FURTHER INFORMATION. 

(BY 3. SMOKE DETECTOR FURNISHED AND INSTALLED BY CONTRACTOR TO FURNISH AND INSTALL EXHAUST DUCT AND 
• •• • • •
HEIGHT 8'-0" LLL) 1
MECHANICAL CONTRACTOR. SMOKE DETECTOR TO BE ACCESSORIES AS REQUIRED. REFER TO PLANS FOR LOCATION.
14 (TYP.) INSTALLED IN THE RETURN AIR DUCT OF THE ROOF TOP UNIT. PROVIDE THERMOSTAT FOR CONTROL. SET THERMOSTAT TO
CEILING GWB SD-1 STRUCTURAL ENGINEER
14 SD-1 • •• • • • • •• • • • M611 • •• • • • THE SMOKE DETECTOR SHALL SHUT DOWN THE HVAC UNIT • • ••• •••••••
SD-1 175 • •• • • •
SD-1 175 RG-3 UPON SENSING SMOKE.
5 EF-1 200 7 TG-3
50 80 14. 1" SLOT FOR RETURN AIR PATH. REFER TO ARCHITECTURAL
• •• • • • 4. CONTRACTOR SHALL FURNISH AND INSTALL CONDENSATE PLANS FOR DETAILS. TM

E.9 8
DRAINS FROM ALL UNITS. MINIMUM DRAIN SIZE TO BE 1" OR AS OSBORN
9 SPECIFIED ON PLANS. CONDENSATE DRAIN TO BE TRAPPED ENGINEERING
(TYP.) 990 West Third Avenue - Suite 200 | Columbus, OH 43212
M611 WITH A MINIMUM 5" TRAP DEPTH. DRAINS SHALL BE EXTENDED 15. AIR CURTAIN-1 1100 Superior Avenue - Suite 300 | Cleveland, OH 44114
AT A SLOPE OF 1" PER 40'. ROUTE DRAINS TO SPLASH BLOCK CONTRACTOR TO PROVIDE A BERNER AIR CURTAIN MODEL
F ON ROOF. ROOFTOP/EXTERIOR PIPING TO SPLASH BLOCK,
(614) 556-4272 www.osborn-eng.com

ARC16-2072E. 16 Kw, 480V, 3 PHASE, (2) 1 HP MOTORS (FAN


ROOF DRAIN SHALL BE U.V. RESISTANT PVC PIPING. PVC VOLTAGE BASED ON ELECTRIC HEAT VOLTAGE), AIR CURTAIN. THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
JOINTS SHALL BE CHEMICALLY WELDED. COPYRIGHT OF ARCHITECT AND SHALL NOT BE USED ON ANY OTHER
RTU-2 AIR CURTAIN TO BE MOUNTED ABOVE CEILING. AIR CURTAIN WORK EXCEPT BY WRITTEN AGREEMENT WITH ARCHITECT. DO NOT
4 2 7 TO BE MOUNTED ABOVE CEILING. PROVIDE BERNER 12" SCALE DRAWINGS.
3400 3
(BY SD M611 5. EXHAUST FAN COMPLETE WITH INTEGRAL BACKDRAFT NOZZLE EXTENSION. FIELD CUT EXTENSION SO AS TO BE
RG-3(TYP) 8 RG-3(TYP) RG-3(TYP) MOUNTED FLUSH WITH CEILING. PROVIDE WITH DOOR
SEAL
LANDLORD) (TYP.) DAMPER AND ON-OFF SWITCH, UNIT SHALL BE FURNISHED
WITH LIGHTING PACKAGE AND INSTALLED BY MECHANICAL SWITCH. ELECTRICAL CONTRACTOR TO PROVIDE CONDUIT.
CONTRACTOR. EXHAUST CAPACITY SHALL BE AS SCHEDULED. ALL LOW VOLTAGE WIRING BY MECHANICAL CONTRACTOR.
SD-4 SD-4 SD-4 SD-4 SD-4 EXHAUST SHALL BE EXTENDED TO EXISTING ROOF EXHAUST LOCATE AND INSTALL UNIT IN STRICT ACCORDANCE WITH
SD-4 SD-4 SD-4 SD-4 SD-4 SD-4
200 200 200 200 200 CAP. ENSURE A 10'-0" CLEARANCE FROM ANY FRESH AIR MANUFACTURER'S PRINTED INSTRUCTIONS. PROVIDE
200 200 200 200 200 200
INTAKES. MECHANICAL CONTRACTOR TO FURNISH AND DISCONNECT SWITCH, DOOR SWITCH, REMOTE SENSOR AND
INSTALL EXHAUST DUCT AND ACCESSORIES AS REQUIRED. THERMOSTAT. CONTACT BERNER PH. 724.658.3551 OR
VERIFY IN FIELD EXACT LOCATION. 800.245.4455. COLOR BY ARCHITECT.

6. GENERAL CONTRACTOR TO UNDER CUT DOOR, 1" FOR AIR


26"x18" FLOW.
8 • •• • • • • •• • • • • •• • • • • •• • • •
• •• • • • • •• • • • • •• • • •
7. ENSURE TRANSFER AIR OPENINGS AND/OR GRILLES ON HIGH
SIDE WALL AND ABOVE CEILING WHERE APPLICABLE FOR
RETURN AIR PATH TO UNITS. PROVIDE FIRE DAMPER AT RATED
PARTITIONS. COORDINATE COLOR WITH ARCHITECT FOR
8
(TYP.) 20"x18" 20"x12" SALES FLOOR TRANSFER GRILLES
M611 12"x12"
8
F.6
15 AIR CURTAIN-1
• •• • • • • •• • • • • •• • • • • •• • • • • •• • • • • •• • • • • •• • • •
• •• • • • • •• • • • • •• • • •

SD-4 SD-4 SD-4 SD-4 SD-4 SD-4 SD-4 SD-4 SD-4 SD-4
14
200 200 200 200 200 200 200 200 200 200
RG-3(TYP) RG-3(TYP) RG-3(TYP) M611

SENSOR
1 10
CO2 RTU-2
S

G ISSUE FOR PERMIT


SPRINKLER LEGEND 01/28/2022
SYMBOL TYPE
NEW FULLY RECESSED/CONCEALED SPRINKLER HEAD FACTORY WHITE UNO
NEW SEMI-RECESSED SPRINKLER HEAD DATE DESCRIPTION
12/23/2021 ISSUE FOR CD
MECHANICAL PLAN NEW UPRIGHT SPRINKLER HEAD
01/28/2022 ISSUE FOR PERMIT
1/4"=1'-0" E E EXISTING SPRINKLER HEAD
HEAD LOCATION SHOWN FOR COORDINATION ONLY. LICENSED FIRE PROTECTION CONTRACTOR
SHALL PROVIDE AND SUBMIT DRAWINGS FOR MODIFICATION OF EXISTING SYSTEM. SPRINKLER
HVAC GENERAL NOTES: 6. GC MUST FLUSH ALL MECHANICAL PIPING PRIOR TO 15. COORDINATE THE EXACT MOUNTING SIZE AND FRAME HEADS TO BE FM GLOBAL APPROVED.
CONNECTING TO BUILDING SYSTEMS. TYPE OF DIFFUSERS, REGISTERS AND GRILLES WITH
1. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT THE OWNER RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND
DRAWINGS AND SITE VISITS AND MAY NOT REFLECT 7. FLEXIBLE INSULATED DUCTS SHALL BE MAXIMUM 5'-0" INSTALLATION REQUIREMENTS. SPECIFICATIONS. SHOULD THE OWNER FIND CORRECTIVE WORK NECESSARY, HE WILL NOTIFY CONTRACTOR
EXACT "AS-BUILT" CONDITIONS. FIELD VERIFY EXISTING LONG AND SHALL MEET INSTALLATION AND MATERIAL OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY SYMBOL LEGEND
CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. REQUIREMENTS OF LOCAL CODES. 16. ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE BY THE
COORDINATE NEW WORK AND DEMOLITION WITH AND GRILLES AS REQUIRED TO ACCOMMODATE FINAL CONTRACTOR. SYMBOL DESCRIPTION SYMBOL DESCRIPTION
OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR 8. ALL BRANCH TAKE-OFFS SHALL BE PROVIDED WITH CEILING GRID AND LIGHTING LOCATIONS. BRANCH
TO CONSTRUCTION. MECHANICAL CONTRACTOR TO MANUAL BALANCING DAMPERS. DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS IF WORK IS REQUIRED BY OWNER IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING SUPPLY AIR DIFFUSER -
PROVIDE TENANT WITH AS-BUILT DRAWINGS, ALL OUTLET NECK SIZE UNLESS OTHERWISE NOTED. CEILING EXHAUST GRILLE
OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE SHADING DENOTES BLANK-OFF
EQUIPMENT SHOP DRAWINGS, INFORMATION ON 9. MECHANICAL CONTRACTOR SHALL FURNISH AND COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR SHALL BE DIRECTED BY OWNER TO ADDRESS
THERMOSTATS, CONTROL WIRING DIAGRAMS AND INSTALL A COMPLETE TEMPERATURE CONTROL SYSTEM 17. PROVIDE A NEW SET OF MERV 8 AIR FILTERS IN UNITS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CAN NOT ACCOMPLISH
OTHER PERTINENT INFORMATION AT COMPLETION OF TO INCLUDE: PANELS, MODULES, RELAYS, WIRING, PRIOR TO TESTING, ADJUSTING AND BALANCING AND THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE, THE OWNER MAY AT HIS DISCRETION TAKE OVER RETURN AIR GRILLE OR DUCT T T-DENOTES THERMOSTAT
PROJECT. THERMOSTATS, SENSORS, DAMPERS, ACTUATORS AND BEFORE TURNING SYSTEM(S) OVER TO OWNER. SUCH WORK AND BACK CHARGE THE CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE
ALL MISCELLANEOUS ITEMS AS REQUIRED TO FULFILL TO LACK OF PERFORMANCE, WORKMANSHIP AND/OR ADHERENCE TO PLANS AND SPECIFICATIONS.
2. COORDINATE THE INSTALLATION OF THE MECHANICAL THE DESIGN INTENT AS INDICATED ON THE PLANS AND 18. ALL ROOF PENETRATIONS SHALL BE PERFORMED BY A DUCT MOUNTED DIFFUSER S S-DENOTES SENSOR
SYSTEMS WITH OTHER TRADES TO ENSURE A NEAT AND IN THE CODED NOTES. LANDLORD APPROVED CONTRACTOR TO MAINTAIN
ORDERLY INSTALLATION. COORDINATE INSTALLATION WARRANTIES. BOTTOM DUCT MOUNTED CO2 CARBON DIOXIDE SENSOR
OF DUCTWORK AND PIPING TO AVOID CONFLICTS WITH
ELECTRICAL PANELS, LIGHTING FIXTURES, ETC.
10. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATION WITH ELECTRICAL CONTRACTOR 19. TENANT SHALL LOCATE ANY ROOF TOP VENTS A FIELD VERIFY ALL CONDITIONS DIFFUSER
FOR ALL EQUIPMENT POWER REQUIREMENTS PRIOR TO MINIMUM OF 10' AWAY FROM ANY ADJACENT ROOFTOP
3. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT ORDERING AND FINAL INSTALLATION OF EQUIPMENT UNIT. DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE SUPPLY AIR DUCT RISE. SIMILAR
TURNING VANES
TO REMAIN FOR NEW INSTALLATION DURING WORK. PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD FOR RETURN AIR
REPAIR DAMAGE CAUSED DURING CONSTRUCTION AT 11. INSTALL DUCTWORK PARALLEL TO BUILDING COLUMN 20. FIELD VERIFY EXISTING CONDITIONS AND THAT SPACE TV
NO EXTRA COST TO THE OWNER. LINES UNLESS OTHERWISE SHOWN OR NOTED. CONFORMS TO APPROVED LEASE OUTLINE DRAWING,
CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS DRAWING INFORMATION
AS APPROVED WITH LEASE AGREEMENT. NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. PROJECT #: 2141254
SUPPLY AIR DUCT DROP.
4. ALL MECHANICAL EQUIPMENT SHOWN ON THE DUCT TRANSITIONS
12. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT 21. CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING
SIMILAR FOR RETURN AIR CHECKED BY: XXX
MECHANICAL PLANS SHALL BE PROVIDED BY THE
AND DUCTWORK SHALL BE FASTENED TO BUILDING ALL APPLICABLE CODES AND OBTAINING ALL
THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR
MECHANICAL CONTRACTOR UNLESS OTHERWISE
NOTED. JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND JURISDICTIONAL APPROVALS. ALL WORK SHALL BE IN TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND DRAWN BY: XXX
HSW HIGH SIDE WALL
SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF. STRICT ACCORDANCE WITH ALL FEDERAL, STATE AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS BRANCH DUCT WITH SPIN-IN
5. NEW MECHANICAL EQUIPMENT AND DUCTWORK ARE LOCAL CODES AND ORDINANCES. FITTING AND VOLUME DAMPER
SHOWN AT APPROXIMATE LOCATIONS. FIELD MEASURE 13. COORDINATE LOCATION OF EQUIPMENT SUPPORTS
MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL
AND SHALL BE IMPLEMENTED AT CONTRACTORS COST.
LSW LOW SIDE WALL MECHANICAL PLAN
FINAL DUCTWORK LOCATIONS PRIOR TO FABRICATION WITH LOCATION OF EQUIPMENT ACCESS 22. ANY EXISTING HVAC UNITS NOT TO BE REUSED BY
AND MAKE ADJUSTMENTS AS REQUIRED TO FIT THE PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT TENANT SHALL BE REMOVED AND DISCARDED BY E EXISTING TO REMAIN FD - FIRE DAMPER (GWB PADS @ 12'-0")
DUCTWORK WITHIN THE AVAILABLE SPACE. VERIFY AND/OR FILTER REPLACEMENT. TENANT G.C. AND ROOF PATCHED IF REQUIRED.
BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES
THAT FINAL EQUIPMENT LOCATIONS MEET
MANUFACTURER'S RECOMMENDATIONS REGARDING 14. SEAL PENETRATIONS THROUGH THE BUILDING AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK SD DUCT SMOKE DETECTOR
ROOF MOUNTED EQUIPMENT AS
SERVICE CLEARANCE AND PROPER AIRFLOW COMPONENTS IN ACCORDANCE WITH THE CONTRACT INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND NOTED
CLEARANCE AROUND EQUIPMENT. SPECIFICATIONS. FIREPROOF PENETRATIONS
SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT M.C. MECHANICAL CONTRACTOR DRAWING NUMBER
THROUGH FIRE RATED COMPONENTS IN ACCORDANCE
WITH U.L. REQUIREMENTS. ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN E.C. ELECTRICAL CONTRACTOR
GOVERNING CODES AND DESIGN INTENT.
M-110

You might also like