Documents essential for preparing the SSEMP for the transmission line project in Baitadi and Bajura

district

1. Alignment in KML and TOPO map


2. Contractual Obligations for the Safeguards
3. Design of the towers
4. Location and design of the substation (Plan & profile)
5. Potential Camps for the project.
6. List of Community Forest along the transmission line.
7. Major settlelments along the TL and near from the Substations?
8. Special considerations from contractors side if any?