HIRARC FORM
Company: Savelite Engineering Sdn. Bhd. Name: Naszreen Shamsudin Designation: Project Engineer
Conducted by:
Project: 20.76 MWac Junjung Solar PV Signature: Date:
Location: Junjong, Kulim, Kedah Name: Mior Sabri Designation: SHO
Reviewed by:
Activity/Process: PV Module Installation Signature: Date:
Revision No.: 00 Latest Revision: 00 Name: Designation:
Approved by:
Date: Date: Signature: Date:
1. Hazard Identification 2. Risk Analysis 3. Risk Control

Existing Risk Control


Work Activity Hazard Consequences Likelihood (L) Severity (S) Risk Recommended Control Measure Person In Charge
(if any)

Materials and work tools mobilization to work area. On-going traffic Traffic accident. 1. Security to control
Limited space entry at main entrance.
Materials blocking
Poor Weather access or exit route. 2. All required to register
before enter site, also
applicable to vehicle entry
to site.

3. To stop or hold all


outdoor activities during 2 2 4 (Low)
rain.

4. Full time supervision


for this job.

Materials unloading at Laydown Area from Lorries & Trucks. Speeding vehicles Traffic accident 1. Completely stop the
engine during no activity
and remove the keys.

2. Assign a full time


supervisor for this task to
monitor whenever the
construction activity
taking place.

3. Flagman to control
trafic.
2 2 4 (Low)
4. To stop activity during
poor weather (rain or
lightning).

5. To use provided
portable lightning
detector control for the
above measure.

Oil spill from lorry or Environment pollution. 1. Person in-charge need


other machineries. to ensure there no any Oil
Spill from lorry / other
vehicles.

2 2 4 (Low)
2. Site Supervsor to
monitor from time to
time and educate the
worker.

Poor Weather Struck by lightning. To setup workers shelther


(Lighting/ at working area with
Thunderstorm/Heavy proper lightning arrestor
rain) for temporary shelter 1 5 5 (Medium)
during any sudden bad
weather.
SAVELITE ENGINEERING SDN. BHD. - 20.76 MWac Junjung Solar PV Project
Hazard Identification, Risk Assessment & Risk Control (HIRARC) Form
Control Number: 003
HIRARC FORM
Company: Savelite Engineering Sdn. Bhd. Name: Naszreen Shamsudin Designation: Project Engineer
Conducted by:
Project: 20.76 MWac Junjung Solar PV Signature: Date:
Location: Junjong, Kulim, Kedah Name: Mior Sabri Designation: SHO
Reviewed by:
Activity/Process: PV Module Installation Signature: Date:
Revision No.: 00 Latest Revision: 00 Name: Designation:
Approved by:
Date: Date: Signature: Date:
1. Hazard Identification 2. Risk Analysis 3. Risk Control

Existing Risk Control


Work Activity Hazard Consequences Likelihood (L) Severity (S) Risk Recommended Control Measure Person In Charge
(if any)

PV Module Installation On-going traffic Traffic related incident 1. Security to control


PV Module installation shall be done by appointed contractor following AFC drawing or physical injury. entry at main entrance.
and AFC method of statement
2. All required to register
before enter site, also 2 2 4 (Low)
applicable to vehicle entry
to site.

Weather Damage on the PV 1. To prepare canvas at all


module time to cover the PV
module before the rain 1 5 5 (Medium)
comes.

Working tools Physical injury with 1. Arrange proper


improper handling supervision to monitor
workers activity.

2. To stop work if notice 2 2 4 (Low)


any use of unsafe work
tools or work method.

Extreme weather (Heat Heat stroke / 1. To setup drinking water


or heavy rain/lightning). Dehydration facility once Site Office &
Workers Resting Area are
established.

2. Proper breaks in-


between working hours to
control workers exposure
to extreme wether. 2 3 6 (Medium)

3. Allocation of sufficient
drinking water at all
shelter.
SAVELITE ENGINEERING SDN. BHD. - 20.76 MWac Junjung Solar PV Project
Hazard Identification, Risk Assessment & Risk Control (HIRARC) Form
Control Number: 003
HIRARC FORM
Company: Savelite Engineering Sdn. Bhd. Name: Naszreen Shamsudin Designation: Project Engineer
Conducted by:
Project: 20.76 MWac Junjung Solar PV Signature: Date:
Location: Junjong, Kulim, Kedah Name: Mior Sabri Designation: SHO
Reviewed by:
Activity/Process: PV Module Installation Signature: Date:
Revision No.: 00 Latest Revision: 00 Name: Designation:
Approved by:
Date: Date: Signature: Date:
1. Hazard Identification 2. Risk Analysis 3. Risk Control

Existing Risk Control


Work Activity Hazard Consequences Likelihood (L) Severity (S) Risk Recommended Control Measure Person In Charge
(if any)

Housekeeping Debris or sharp objects Physical injury. 1. Assign a full time


To perform housekeeping & materials arrangement. on the ground/floor. Supervisor to monitor
cleaning job activity.

2. To arrange for
mechanical lifting aid such
2 2 4 (Low)
as Pallet Jacks, Forklifts,
etc for heavy or large
items to avoid manual
handling.

Manual handling. Fatigue/Ergonomic issue 1. To use mechanical aid


due MSD. to relocate / shift
materials to the work
location such as using
Forklift, small lorry, etc to
avoid workers continuous
contact with sharp
materilas & continuos
manual handling task.
2 2 4 (Low)
2. Assign 2 or more
people to handle large
materials or longer
materials (more than 2
meters).

Heat. Heat stroke/ 1. To setup drinking water


Dehydration facility once Site Office &
Workers Resting Area are
established.

2. Proper breaks in-


2 3 6 (Medium)
between working hours to
control workers exposure
to extreme wether.

Bad weather (lightning). Struck by lightning. To setup workers shelther


at working area with
proper lightning arrestor
for temporary shelter
1 5 5 (Medium)
during any sudden bad
weather.