Materials and work tools mobilization to work area. On-going traffic Traffic accident. 1. Security to control
Limited space entry at main entrance.
Materials blocking
Poor Weather access or exit route. 2. All required to register
before enter site, also
applicable to vehicle entry
to site.
Materials unloading at Laydown Area from Lorries & Trucks. Speeding vehicles Traffic accident 1. Completely stop the
engine during no activity
and remove the keys.
3. Flagman to control
trafic.
2 2 4 (Low)
4. To stop activity during
poor weather (rain or
lightning).
5. To use provided
portable lightning
detector control for the
above measure.
2 2 4 (Low)
2. Site Supervsor to
monitor from time to
time and educate the
worker.
3. Allocation of sufficient
drinking water at all
shelter.
SAVELITE ENGINEERING SDN. BHD. - 20.76 MWac Junjung Solar PV Project
Hazard Identification, Risk Assessment & Risk Control (HIRARC) Form
Control Number: 003
HIRARC FORM
Company: Savelite Engineering Sdn. Bhd. Name: Naszreen Shamsudin Designation: Project Engineer
Conducted by:
Project: 20.76 MWac Junjung Solar PV Signature: Date:
Location: Junjong, Kulim, Kedah Name: Mior Sabri Designation: SHO
Reviewed by:
Activity/Process: PV Module Installation Signature: Date:
Revision No.: 00 Latest Revision: 00 Name: Designation:
Approved by:
Date: Date: Signature: Date:
1. Hazard Identification 2. Risk Analysis 3. Risk Control
2. To arrange for
mechanical lifting aid such
2 2 4 (Low)
as Pallet Jacks, Forklifts,
etc for heavy or large
items to avoid manual
handling.