You are on page 1of 2

700MW CSP + 250 MW PV Hybrid IPP

-DEWA

Owner Noor Energy 1 EPC SEGC


Substation 700MW CSP+250MW PV HYBRID-IPP PHASE IV
Sub-contractor JEPCC
Equipment Cold and hot salt pump #3VSD tank 7/8
Installation location TES -NORTH BUILDING
1. Equipment parameters
WDZC-YJY73-6/10kV
Model Rated Voltage (kV) 6/10kV
3x1x240
The Starting 23BBA20GS407 The Ending #3VSD tank 7/8

Cable Iength (m) Release Date /

Cable KKS Manufacturer /

2. Insulation Resistance measurement


Insulation Measured Value(GΩ)
Test Position Resistance test Test Time(min)
voltage (V-DC) Before Voltage test After Voltage Test

A-B,C and ground 2500 1 >1000 >1000

B-A,C and ground 2500 1 >1000 >1000

C-A,B and ground 2500 1 >1000 >1000

3. AC withstand voltage test

Test Position Test Voltage (kV) Test Time (min) Test Frequency (Hz)

A-B,C and ground 24 15 186.1

B-A,C and ground 24 15 185.6

C-A,B and ground 24 15 185.3

Test Result Pass

4. Check the ends of the line phase

Test Result Correct

Test Date 2023.03.24 Temperature 35.0 ℃ 36 %


Calibration due
Test Instrument Make Model Serial Number
date
Insulation
Resistance SCEEC DM50C 521575 22/06/2024
Tester
Series Suzhou
Resonance Test Industrial Park HVFRF-270 41539 22/06/2024
Device Haiwo

5. Conclusion:

Qualified

Tested By. Witnessed By. SEGC Witnessed By. NE1