13 TO ASCERTAIN THE
ACTUAL REQUIREMENT OF PHASE II (REVISED) IN UPGRADATION OF
PORT ELECTRICAL SYSTEM”
The standing tender committee members met on 29.09.13 at 15.00 hrs
of trustees for the year 2012-2013 held on 27.09.12 for carrying out the Phase
Lakhs. The committee has analyzed the site conditions and observed the
following.
structure.
available between 8 pole structure and Green gate control room and
from the green gate control room, the HT power supply was distributed
Pole structure.
Shallow draught berth feeder, Wharf feeder from Green gate control
provided.
required.
R.Baskar B.Selvaraj
Executive Engineer/Electrical-I Executive Engineer/Electrical-
II
Shri.N.V.Perumaal
Dy. CME
P.Ravindran
Chief Mechanical Engineer