Professional Documents
Culture Documents
: 2214-BOQ-001
PAKISTAN MOLASSES COMPANY LTD. PREP. BY : RS
CONVERSION OF EDIBLE OIL TANKS INTO D.P PRODUCTS REV. : 0
BILL OF QUANTITIES OF DATE : 14-MAY-2013
CIVIL WORKS
Item.
Description Qty. Unit Rate Amount in Rs.
No.
1.0 EARTH WORKS
1.1 DISMANTLING OF EXISTING STRUCTURE
1.2 EXCAVATION
Excavation for foundation in all kinds of soil, dry or wet, hard or soft,
including all operation. Complete with breaking clods, levelling, dressing,
dewatering, shoring & compacting, including lifting, shifting or disposing of 741.0 m3
surplus earth outside the premises or as per instruction and specification
of the Consultant and approval of Client (Site Engineer).
Item.
Description Qty. Unit Rate Amount in Rs.
No.
DOC. No. : 2214-BOQ-001
PAKISTAN MOLASSES COMPANY LTD. PREP. BY : RS
CONVERSION OF EDIBLE OIL TANKS INTO D.P PRODUCTS REV. : 0
BILL OF QUANTITIES OF DATE : 14-MAY-2013
CIVIL WORKS
Item.
Description Qty. Unit Rate Amount in Rs.
No.
4.0 STEEL REINFORCEMENT
Providing and laying hot rolled grade 460 steel reinforcement bars
complying with BS-4449 including the cost of straightening, cutting,
bending, binding, wastage and such overlaps as are not shown in
drawings, placing in position on cement concrete 1:2:4 precast spacer
block or M.S chairs, tying with binding wire (GI wire of 18 guage),
including cost of chairs and wires etc. in all kinds of RCC works.
Providing & Laying two coats of PB4 Hot Bitumen or approved make
imported water proof chemical inside and outside foundation upto finished
ground level & sides of footings, including cost of all material, labour, 579.0 m²
equipmenetc complete as per drawing and specification and as directed
by the Engineer Incharge.
Providing and laying precast fairface 1:2:4 PCC curb stones of size
172.0 RM
12''×18''×6'' around the bays.
11.0 PAVERS
Providing and laying 80mm thick invicrete pavers having the strength
greater than 60 tons axle load including joint filling fine sand to fill the 1552.0 m²
gaps as per drawings and specifications.
DOC. No. : 2214-BOQ-001
PAKISTAN MOLASSES COMPANY LTD. PREP. BY : RS
CONVERSION OF EDIBLE OIL TANKS INTO D.P PRODUCTS REV. : 0
BILL OF QUANTITIES OF DATE : 14-MAY-2013
CIVIL WORKS
Item.
Description Qty. Unit Rate Amount in Rs.
No.
12.0 SUB BASE COURSE
Providing and laying 150mm thk aggregates sub base course with
(crushed stone or natural gravel) compacted upto max dry density 98% 1552.0 m²
AASHTO. Complete all works as per drawings and specifications.
Providing & Laying 50mm thick sand cusion below the pavers as per
1552.0 m²
drawing and specification and as directed by the Engineer Incharge.
Providing and laying block masonary 150mm thick with good quality
blocks in 1:4 (1 cement 4 sand) and as per specification and instruction of 212.0 m2
Consultant and Client from approved quality.
17.0 PLASTERING
Providing and laying smooth Plaster with cement mortar 1:4 on walls,
columns,slabs etc. on straight or curved surfaces including providing and
fixing expanded metal at the junction of structural members and
brick/block walls, making chamfered edges rounding of corners at
junctions, plaster stopper metal corner beads, drip course where required,
hacking of RCC surface and curing including the cost of scaffolding etc. at
any height. All work will be carried out as per specifications and
instructions of site Engineer.
18.0 PAINTS
18.1 PALSTIC EMULSION PAINT
Providing and applying three coats of plastic emulsion paint, of required
color and shade to internal walls including preparation of the base by
rubbing the surface with carborandum stone,applying premier coat of
"Plastron Premier Sealer" on the entire surface, filling depressions with
putty,cutting the surface and rubbing smooth finally with sand paper
725.0 m²
complete as per instruction and specification of the consultant and
approval of client.
Item.
Description Qty. Unit Rate Amount in Rs.
No.
Providing and applying three coats of weather shield paint, of required
color and shade on exterior surfaces including preparation of the base by
rubbing the surface with carborandum stone, filling depressions with
putty,cutting the surface and rubbing smooth finally with sand paper 200.0 m²
complete as per instruction and specification of the consultant and
approval of client.
DOC. No. : 2214-BOQ-001
PAKISTAN MOLASSES COMPANY LTD. PREP. BY : RS
CONVERSION OF EDIBLE OIL TANKS INTO D.P PRODUCTS REV. : 0
BILL OF QUANTITIES OF DATE : 14-MAY-2013
CIVIL WORKS
Item.
Description Qty. Unit Rate Amount in Rs.
No.
19.0 PVC OR VAPOR BARRIER POLYETHENE SHEET
Providing & Laying PVC or Vapor barrier polyethene sheet (80gm/m²)
thick flooring layed well with all joints heat welded including welding rods,
imported adhesive etc complete in all respect as per drawing and 58.0 m²
specification and as directed by the Engineer Incharge.
23.0 GATE
Providing, fixing and fabricating in psition steel gate 6700mm wide as per
1.0 No.
drawing 2214-DT-017. Complete in all respects as per drawing.
25.1 Double leaf steel louver door (5' x 7'). 1.0 No.
25.2 Double leaf steel louver door (10' x 9'-10"). 1.0 No.
25.3 Double leaf steel louver door (8' x 9'-10"). 1.0 No.
Item.
Description Qty. Unit Rate Amount in Rs.
No.
26.0 STEEL STRUCTURE
26.1 Steel Structure weight of loading and decanting gantry structure. 70.0 Tons
26.2 Steel Structure Weight of product pump house structure. 12.0 Tons