You are on page 1of 3

gene

samp
of
8
rows
Abou
is
Gantt
rated
le
the
week
in
tchart
outli
base
phas
cell.
swill
this
work
ned
d on
ework
Enter
repre
sheet
in
auto
the
block
task
sente
sheet
.matic
Red
s.start
d
Conti in
(hex
ally
and
have
date
this
Over
nue
#AD3
fill in
end
been
in
view
write
navig
815)
the
dates
creat
cell
from
any
ating
from
appr
enter
ed
E9.
cell
samp
down
today
opria
ed,
for
Enter
I4
le
colu
's
te
using
you
task
throu
data.
mn A
date
dates
condi
in
end
gh
A
to
in
and
tional
cells
date
cell
samp
hear5
row
shad
form
B20
in
BF4.
furth
le of
ethrou
ats.
and
cell
You
anot
er
gh
accor
Do
B26.
F9.
shoul
her
instr
the
ding
PROJECT TITLE: MOBILE INDUSTRIAL WASTEWATER EFFLUENT TREATMENT PLANT (ETP)
not
Othe
A
d
phas
uctio
entir
to
modi
rwise
estatu
emodi
ns.
the
not

sfy
,starts
fybar
date
progr
conte
navig
shad
these
in
colu
ess
nt in
ate
Enter
ed
CLIENT NAME: SALEM FA CONSULTANT NAME: MIDAS (PTE) LTD
cells.
cell
mn
enter
cells
throu
for
Displ
A14.
to
ed.
withi
gh
the
ay
Conti
the
To
Enter t
PROJECT LEAD: MIR HASIB-UL-LATIF PROJECT START: Wed, 4/26/2023 GROSS PERIOD(DAYS): 96 TOTAL TASKS: 29
n
colu
dates
Wee
nue
end
delet
colu
mn
k: A
enter
enter
PROJECT END: Sun, 7/30/2023 NET PERIOD(DAYS): 66 TOTAL BILLING HOURS: 475
of
emns
cells the
ed
label
ing
the
phas
after
to
appe
is and
tasks
eproje in
colu
find
ars
cell in
in
ct
work
mn DISPLAY WEEK: 1 CONSULTANCY FEES: $ 9,500.00 IN WORDS: NINE THOUSAND FIVE HUNDRED DOLLAR ONLY Apr 24, 2023 May 1, 2023 May 8, 2023 May 15, 2023 May 22, 2023 May 29, 2023 Jun 5, 2023 Jun 12, 2023 Jun 19, 2023 Jun 26, 2023 Jul 3, 2023 Jul 10, 2023 Jul 17, 2023 Jul 24, 2023 Jul 31, 2023 Aug 7, 2023 Aug 14, 2023 Aug 21, 2023 Aug 28, 2023 Sep 4, 2023 Sep 11, 2023 Sep 18, 2023 Sep 25, 2023 Oct 2, 2023 Oct 9, 2023 Oct 16, 2023 Oct 23, 2023
C4. I
the
block
cells
sche
sonly
starti
additi
A10
dule. 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
from
ng
onal
starti
throu
tasks,
with
block
ng
gh ASSIGNED REVISION BILLING RATE/USD
simpl
cell
s.
from TASK NO. TASK PROGRESS START END EXECUTION DAYS INITIAL DELIVERY DATE FINAL DELIVERY DATE REVISION DAYS EXPECTED DATE OF PAYMENT MANHOURS PER DAY EXECUTION HOURS BILLING HOURS TOTAL BILL M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
A13 TO HOURS PER HOUR
yRepe
I7. go
cell
or
delet
at
I9
to P1
ethe
this
throu
cell PROCESS ENGINEERING
row.
instr
gh
A14 P11
uctio
BL9.
to Project Definition, Design Basis, Process Selection, Process Description, Block Flow Diagrams (BFD) 4/26/23 4/26/23 1 4/27/23 4/27/23 1 4/28/23 5 5 5 10 20 200
ns
learn P12 Heat and Material Balance (HMB), Utility Balance, Process Flow Diagrams (PFD), Utility Flow Diagrams (UFD), Piping & Instrumentation Diagrams (P&ID), Utility
from
more Distribution Diagrams (UDD), Process Simulation Report 4/28/23 4/30/23 3 5/1/23 5/1/23 1 5/2/23 5 15 5 20 20 400
cells
.
A8
and P13 Equipment List, Equipment Sizing Calculations, Process Datasheet, Catalyst & Chemicals Summary (including Lubricant) 5/2/23 5/2/23 1 5/3/23 5/3/23 1 5/4/23 5 5 5 10 20 200
A9 Performance Guarantee Statement , Performance Test Procedure, Pre-commissioning & Commissioning Manual, Operation & Maintenance Manual, Job Standards,
when P14 Inspection Procedure 5/4/23 5/4/23 1 5/5/23 5/5/23 1 5/6/23 5 5 5 10 20 200
ever
you
need P2 MECHANICAL ENGINEERING
to.
P21 Equipment Design Calculations (Mechanical), Mechanical Datasheet, Material Selection Diagram (MSD) 5/6/23 5/8/23 3 5/9/23 5/9/23 1 5/10/23 5 15 5 20 20 400
P22 Specialty Items List, Mechanical Schematic Diagram, Detail drawings 5/10/23 5/12/23 3 5/13/23 5/13/23 1 5/14/23 5 15 5 20 20 400
P23 Sectional Drawings, Elevation Drawings 5/14/23 5/16/23 3 5/17/23 5/17/23 1 5/18/23 5 15 5 20 20 400
P24 Isometric Drawings, Assembly Drawings 5/18/23 5/20/23 3 5/21/23 5/21/23 1 5/22/23 5 15 5 20 20 400
P25 Installation Drawings, General Arrangement Drawing (GAD) 5/22/23 5/24/23 3 5/25/23 5/25/23 1 5/26/23 5 15 5 20 20 400

P3 PLANT & PIPING ENGINEERING


P31 Pipeline sizing, Piping General Arrangement Drawings, Key Plan, Piping Material Specifications, Piping Detail Drawings 5/26/23 5/28/23 3 5/29/23 5/29/23 1 5/30/23 5 15 5 20 20 400
P32 Piping Elevation Drawings, Piping Sectional Drawings, Piping rack layout, Nozzle Orientation Drawings,Piping Demolition Drawings 5/30/23 6/2/23 4 6/3/23 6/3/23 1 6/4/23 5 20 5 25 20 500
Special Piping (SP) Item Schedule and Datasheet, Special Pipe Support Register, Pipe Supports Design Detail Drawings, Pipe Support Spring Register and Calculations,
P33 Fabrication and Installation of Pipe-work Specification 6/4/23 6/6/23 3 6/7/23 6/7/23 1 6/8/23 5 15 5 20 20 400

P34 Isometric Drawings, Line list, Tie-in Schedule, Insulation Specification and Schedules (Plant & Piping), Piping Material Take-offs (MTOs) 6/8/23 6/9/23 2 6/10/23 6/10/23 1 6/11/23 5 10 5 15 20 300
This i P35 Stress Analysis Specification, Stress Critical Line List, Stress-Strain Diagram, Final Stress Report, Hydrostatic test diagram 6/11/23 6/12/23 2 6/13/23 6/13/23 1 6/14/23 5 10 5 15 20 300
P4 CONTROL SYSTEM & INSTRUMENTATION ENGINEERING
Instrument Index, Instrument Datasheet, Instrument Design Data and Engineering Calculation, Control Logic Gate Diagram, Ladder Diagram, Input/ Output Schedules
P41 6/14/23 6/15/23 2 6/16/23 6/16/23 1 6/17/23 5 10 5 15 20 300
Cause and Effect (C&E) Diagram, Alarm and Trip Schedule, Instrument Loop Diagram, Instrument and Control System Schematic Wiring Diagram, Air Distribution
P42 Diagram, Control Room and Control Building Layout 6/17/23 6/19/23 3 6/20/23 6/20/23 1 6/21/23 5 15 5 20 20 400
Functional Block Diagram, Specifications of Interface System , Interface Control Drawing, Grounding Diagrams for Instruments and Control Systems, Instrument
P43 Cable Routing, Instrument Cable Schedule 6/21/23 6/22/23 2 6/23/23 6/23/23 1 6/24/23 5 10 5 15 20 300
Instrument Hook-Up Diagrams(Electric,Pneumatic,Hydraulic, Process), Instrument Junction Box Schedules, Instrument Junction Boxes and Panels Block Diagrams,
P44 Instrument Location Drawings, Instrument Power and Utility Requirement, Instrument Specification (for equipment and materials) 6/24/23 6/25/23 2 6/26/23 6/26/23 1 6/27/23 5 10 5 15 20 300

Interconnection Diagram for Instrument , Panel and Rack Layout, Power Distribution Schedule for CSI, Power Distribution One line Diagram for CSI, Relief and Safety
P45 Device Index, Instrument Termination Schedule/Diagram 6/27/23 6/28/23 2 6/29/23 6/29/23 1 6/30/23 5 10 5 15 20 300

P5 ELECTRICAL & ELECTRONICS ENGINEERING


Electrical System Studies, Electrical Area Classification Drawing (EAC), Load Flow Analysis with Motor Starting Effect & System Stability & Voltage Levels, Electrical
P51 Load List (Schedule), Emergency Power Load Requirement, Single Line Diagram (SLD), Key One Line Diagram, Emergency Power One Line Diagram, UPS One Line 6/30/23 7/2/23 3 7/3/23 7/3/23 1 7/4/23 5 15 5 20 20 400
Diagram
Power Riser Diagram, Electrical Bulk Material List, Electrical Equipment and Component Specification, Electrical Equipment Drawing including Vendor Prints, Electrical
P52 Equipment Front and Interior Layout, Electrical Equipment Sizing Calculation, Electric equipment list, Electrical Component Maintenance and Instruction Manual. 7/4/23 7/5/23 2 7/6/23 7/6/23 1 7/7/23 5 10 5 15 20 300
MOV Control Schematic Diagram, Motor Datasheets, Motor Schematic Diagram, Tray and Grounding layout, Emergency and Normal Power Supply Layout.
P53 7/9/23 7/10/23 2 7/11/23 7/11/23 1 7/12/23 5 10 5 15 20 300
Grounding cable Drawing, Inter connection Drawing between Panels, Electrical Installation Detail Drawing, Installation Detail Drawing for , Grounding, Heat Tracing,
Termination Schedule/Diagram, Electrical Wiring Drawing and Terminal Connection Document, Electrical and Electronic Equipment Manual and Setting Document.
P54 7/14/23 7/16/23 3 7/17/23 7/17/23 1 7/18/23 5 15 5 20 20 400

P55 Plant Cable Tray and Cable Routing Layout, Cable Routing Schedule, Cable Tray Penetration Detail Drawing, Tray Sizing Calculation 7/18/23 7/19/23 2 7/20/23 7/20/23 1 7/21/23 5 10 5 15 20 300
P56 Heat Tracing Calculation, Electrical Heat Tracing Isometric Drawing, Heat Tracing Panel Schedule 7/21/23 7/22/23 2 7/23/23 7/23/23 1 7/24/23 5 10 5 15 20 300
Circuit Breaker Setting, Transformer Tap Setting, Motor Protection Setting, Relay Setting Schedules including Setting Curves, Fuse Ratings and Characteristic Curve
P57 7/24/23 7/25/23 2 7/26/23 7/26/23 1 7/27/23 5 10 5 15 20 300

P6 COST ENGINEERING
P61 Production Costing, Capital Investment Costing 7/7/23 7/7/23 1 7/8/23 7/8/23 1 7/9/23 5 5 5 10 20 200
P62 Economic Analysis 7/12/23 7/12/23 1 7/13/23 7/13/23 1 7/14/23 5 5 5 10 20 200
P63 Bill of Quanties (mechanical, piping, instrumentation, electrical) 7/27/23 7/28/23 2 7/29/23 7/29/23 1 7/30/23 5 10 5 15 20 300
TERMS AND CONDITIONS
1.Quoted amount does not include any type of VAT, AIT or any government duties but 20% Upwork Service Fee Inclus
2. The client shall provide all legal information and shall be responsible for any misinformation provided by client.
3. The client shall provide all supporting material regarding the design
4. The client shall clear payment within expected date of payment. Otherwise later task will be upheld.
5. The client shall not make or allow anyone to make changes to the basic design without the approval of the consultant.
6. The client shall pay additional charges for any additional services availed of from the consultant beside the agreed upo
7. The client shall not disclose the design drawings other than brochure, until the project is completed.
8. All services provided by the consultant shall strictly adhere to API, ANSI, ASTM, ASME, TEMA, ACI, ISA, NEC, N
9. Consultant will strictly adhere to agreed upon timeframe while providing services as per mode of service charges.
10. Consultant to have all legal standings for all undertaken works.
11. All payments shall be made in favor of Upwork Escrow Inc linked bank accounts in US dollars.
ervice Fee Inclusive. Also the quoted amount may change with the change of built-up area or plant capacity.
d by client.

of the consultant.
de the agreed upon services.

CI, ISA, NEC, NFPA, OSHA and ASHRAE standards.


vice charges.