You are on page 1of 1

Date of date

PROCESS - FMEA Worksheet Revision No. Description of revision


est./revision
Approved
by
Confirmed Prepared by
by

MODEL K1B

PAST No. 14451-K1BA-T001

PAST NAME SHAFT , ROCKER ARM

Process FMEA war carried out by ( dept of person ) :

Scope of risk evaluation Risk evaluation Countermeasure ( risk minimizing activities ) Verification of C/M ( re-evaluate risks)

Influence if a failure mode occurs Detectio Risk


Risk C/M Occurren
Function of the Process Idenlify- Seriousenee Cause of failure mode Occurrence Current process control method Deteclion C/M date C/M carried out (including PIC of Senousnes n priority Completion
No. Process Name (wat does this )
Failure mode (S) (Occurrence mechanism) rate (O) (Prevention/detection of Probability (D)
priorty Proposed C/M (target) follow-ups)
appilcation
CM s (S)
ce rate
probabili no. Confirmation
cation date (O)
To parts/components To Honda procucts (RPN) ty (RPN)

You might also like