SEC EHVPD RISK ASSESSMENT

/RISK ASSESSMENT AND ANALYSIS/‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬

RA Number(‫)رﻗم ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬: ‫اﻟﻣﻌدة‬/‫اﻟﻌﻣﻠﯾﺔ‬/‫اﻟﻣﮭﻣﺔ‬/‫اﻟﻣوﻗﻊ‬WORKPLACE/TASK/ACTIVITY/PROCESS DEPARTMENT/AREA( ‫اﻟﻣﻧطﻘﺔ‬/‫)اﻻدارة‬: Gregar S/S

SS RA – 010 NAME:
DATE( ‫)اﻟﺗﺎرﯾﺦ‬: 01.01.2019
RA TEAM(Names) (‫)أﺳﻣﺎء ﻓرﯾﻖ اﻟﺗﻘﯾﯾم‬: NEXT REVIEW DATE(‫)ﺗﺎرﯾﺦ اﻟﻣراﺟﻌﺔ اﻟﻘﺎدم‬: 01.07.2019
1. Hussain Yahya
2. Mohamed Abdou Concrete Work APPROVED BY MANAGER/SUPERVISOR(‫)اﻋﺗﻣد ﻣن ﻗﺑل‬: Eng. Imran Khan

3.Ahmed Ramadan Singniture ( ‫)اﻟﺗوﻗﯾﻊ‬

RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/Eq & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# uipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
1 Obtain Permit to ● Unauthorized work ● Accident ● Permit to Work shall be obtained as a pre-requisite to ● Site Manager, Supervising Engineer, Foreman
Work to be performed resulting serious perform work shall designate a Permit Receiver competent
within a defined injury or death to ● Work shall not be started until duly approved Permit to enough to take responsibility in securing the
location and worker Work is available at site and that Safety Toolbox Permit to Work
boundary ● Significant meeting was conducted ● Permit Receiver shall be trained and authorized
● Uncontrolled property and ● A safe work practice shall be implemented to reduce the by the Manager to receive a Permit to Work
personnel entering a appurtenances possibilities of accident / incident ● Permit Receiver shall be responsible to oversee
restricted location damage ● Permit Receiver and Permit Issuer shall visit together at for the safety of all workers under his Permit to
● Unidentified hazards ● Loss of the site to ensure that workplace hazards are Work
with unplanned production adequately identified and mitigating measure shall be ● Manager, Supervisor, Foreman and all workers
safety mitigating ● Significant cost established shall adhere to all requirements set forth in the Moham
4 3 12 4 1 4 Yes
ed Abdu
measures due to damages ● Permit to Work shall be displayed at the worksite Permit to Work, Risk Assessment, Method
● Inadequate ● Governmental ● Permit Receiver shall not leave the area for the whole Statement, Job Safety Procedure and other
coordination and violation duration of work relevant safety practices and standards
area control protocol ● Environmental ● Work shall not proceed without the presence of ● All workers shall attend the toolbox meeting on a
complaint approved Permit to Work with the Permit Receiver daily basis conducted by the Supervising
overseeing the activity Engineer, Foreman and Permit Receiver
● Permit Receiver shall account all workers under his ● All workers attending the toolbox meeting shall
Permit to Work before the start of work sign on the attendance sheet attached to the
specific Permit to Work

2 Preparingthe ● Damaged hand tools ● Damaged hand ● Damage or defective tools shall be quarantined in a ● Supervisor should regularly check the hand tools.
areas for ● Sharp tools inside tools can cause designated box or immediately repaired. ● Proper supervision should be there during activity.
concrete tool box. hand injury. ● Regular maintenance, inspection of toolboxes ● All defective tools must be brought to store for
pouring ● Tools not inspected ● Sharp tools arrangement shall be carried out daily. replacement
● Holes on ground inside tool box ● Ensure that inspection of tools shall be conducted
● Steel bar and small can cut fingers. regularly and all tools that are in good condition are
Moham
concrete blocks on ● Tools which are registered and color coded. 3 3 9 3 2 6 Yes
ed Abdu
ground not inspected can ● Tools and materials with sharp edges or exposed
cause injury in pointed parts shall be stored separately and must
hand. provide with covers
● Holes on ground ● Workers responsible for the tools must be trained,
can cause falling competent and authorized.
on that. ● All ground opening and clutter materials which may

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 1 of 8 02 SS RA - 010
SEC EHVPD RISK ASSESSMENT
RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/E & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# quipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
● Steel bar and cause tripping hazard shall be removed and clear for
small concrete concrete pouring
blocks on ground
can cause
tripping.

● Poor housekeeping ● Accident resulting ● Housekeeping shall be done before, during and after the ● Site management plan shall be prepared
in the workplace injury to job indicating all the location of personnel and
● Struck with sharp personnel ● Designated access shall be free from any obstruction equipment access, parking areas, offices,
and hard object ● Vehicular ● Designate location for unloading of personnel and materials storage area, disposal area, hazardous
● Unorganized accident materials be stored only on a designated storage area waste disposal and storage area, rest shelter, Moham
3 3 9 3 2 6 Yes
materials and access ● Property damage ● Designate material disposal area with secondary evacuation area and etc. ed Abdu
● Area congestion to equipment or containment intended for the hazardous liquid material ● Designate a dedicated personnel who is familiar
materials ● All material location and storage shall be barricaded and with the site management plan to guide all
● provided with adequate signage personnel and equipment in loading and
unloading of materials and equipment
3 Pre start ● Going to congested ● Going to different ● Put engine in off position, apply hand brake, remove the ● Related engineer and supervisor should monitor
checking of parts of equipment. areas of key and lock the cabin to ensure that the vehicle cannot the operator and advise him as per current site
pumpcrete ● Equipment not equipment to move forward or backward during inspection. It also condition to adjust the equipment.
machine switched off. Brake check the secures unauthorized personnel to prevent operating. ● Wear the PPE that is required for the particular
,concrete not applied. condition, lack of ● Driver and operator shall use cotton gloves with rubber process area that you will be working in.
mixture truck ● Going to oily and putting proper palm hand gloves when inspecting.
and fill-out the greasy areas which brake and lock ● All the hoses and pipes to be checked by standing in a
daily vehicle are slippery. may move truck. safe position to avoid falling during inspection.
checklist ● Improper PPE use ● Contact with oily ● Only recommended PPE like hand gloves, coverall, hard
during inspection. areas during hat, safety shoe, eye glass to be used which should be
inspection. Can in good condition.
Moham
slip if step over 3 3 9 3 2 6 Yes
ed Abdu
greasy areas.
● Hand injury,eye
injury,cut on
skin,head injury
due to contact
with equipment
parts.

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 2 of 8 02 SS RA -010
SEC EHVPD RISK ASSESSMENT
RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/E & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# quipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
4 Arranging ● Unlevelled ground. ● Accident to ● Ground should be leveled and compacted where the ● Ensure that the PPE is in good condition and
place for ● Not wearing the personnel pumpcrete machine will be located to avoid sliding and affords adequate protection.
concrete required personal resulted to injury collapsing. ● Provide Power Tools Training to the workers.
pumpcrete protective equipment ● Falling over ● Mixture truck placed area should be made clear. ● Standby firewatcher to monitor hot work activity.
machine and (Clear glass, ear ground due to not ● Ensure that required PPE are provided and wear by the ● Use fire blanket to contain the flying sparks.
concrete mixer plug, dust mask, levelled properly. workers ● Provide bucket with water as a support for fire
truck ,placing hand gloves, cover ● Laceration and ● Clear safety glass when working inside the basement extinguisher in case of fire.
barricade and all, helmet and safety cut building or the like. ● Defective tools and equipment shall not be used
signage shoes) ● Respiratory ● Dark Safety Glass when working outdoors and must be surrender to store for replacement.
● Heavy wind illness ● Wear safety Helmet / hard hat ● Conduct training regarding electrical safety to all
movement at work ● Eye injury due to ● Wear safety shoes workers to increase their awareness.
area. flying particles ● Normal cotton gloves for light works ● Post some campaigns regarding electrical safety.
● Flying objects ● Head injury ● Cotton gloves with rubber palm when handling sharp ● Conduct illumination survey on those areas
● Poor lighting ● Eye strain object suspected to have insufficient lighting to ensure
● High ambient ● Head ache ● Single respiratory dust mask for cutting and grinding that lighting is checked and that correct lighting
temperature ● Physical Injuries works. levels are maintained.
● Sharp edges of sign due to slip trip ● Trained workers for the use of PPE. ● Location that required additional illumination must Moham
3 4 12 3 2 6 Yes
board can cause and fall ● Supervisor to monitor complete use of PPE be reported to their respective supervisor/foreman ed Abdu
injury to workmen. ● Injury on eye and ● Adequate PPE like dust mask, safety glass to be used for the arrangement.
● Tripping & falling due hand due to poor to avoid injury due to flying objects and dust. ● Conduct temperature/humidity monitoring to
to ropes & tapes light ● Work should be stopped if sand storm continues. ensure safe working condition.
used for barricade. ● Heat Stress ● Area should be cleaned to avoid injury from flying
(stroke, cramps, objects.
rashes etc.) ● Provision of suitable & adequate illumination.
● Check illumination level is suitable or no.
● Check the task is free from veiling reflection of shadow.
● Ensure proper lighting is provided.
● Provide sufficient ventilation, shelter etc.
● Provide sufficient drinking water and scheduled breaks.
● All workmen involved in signboard installation should
use proper cotton hand gloves to avoid injury when
placing sign boards.
● All ropes and tapes to be arranged and placed properly
to avoid falling due to them.

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 3 of 8 02 SS RA -010
SEC EHVPD RISK ASSESSMENT
RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/E & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# quipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
● Struck by moving ● Vehicular ● Establish equipment access and shall be free from any ● Site management plan shall be prepared,
equipment and accident obstruction approved and implemented to avoid property
vehicle ● Accident resulting ● Designate parking area damage and personnel accident
Injury to ● Designate location for unloading of materials
personnel ● Designate spotter and flagman to guide all equipment
● Property damage and personnel movement
of adjacent
structure or
appurtenances
Moham
3 4 12 3 2 6 Yes
ed Abdu

5 Pumpcrete ● Improper usage of ● Serious ● Only trained and competent operator shall be assigned ● Use of MEWP like man lift, scissor lift etc.)
machine outrigger/Incompete personnel injury to operate pumcrrete machine. ● Supervisor/foreman must identify areas with risk
operator nt operator due to not ● Follow proper procedure to extend outrigger as per of falling are provided with suitable fall
extends ● Dust particles knowing manufacture recommendation. prevention.
outrigger and exposure operation. ● Site supervisor should present during the execution of ● Worksite Supervisors to closely monitor the
placing it over ● Excessive noise ● Injury on nose, work activity & recommends precautionary measures if
pads. ● Operator wearing allergy, nausea, ● Dust control by moistening the location with water unsafe act or unsafe condition have been noted
loose clothing due to dust. ● Appropriate dust mask to be worn by operator. during the course of the work Moham
3 4 12 3 2 6 Yes
● Noise can cause ● Conduct noise survey on the activity area to determine ● Provide Working @ Heights training to the ed Abdu
hearing the ear plug/ear muff capacity to be provided. personnel involve in working at heights.
loss,headache. ● Train operator on how to wear the earplug /Earmuff ● Loose materials must be secured by buckets.
properly. ● Unwanted & surplus material shall be removed.
● No loose clothing and remove all jewelry to prevent ● Affected area shall be barrier off with appropriate
being entangled on the moving g part of the equipment. safety signage" Overhead Works
● Supervisor to monitor proper compliance of PPE. ●

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 4 of 8 02 SS RA -010
SEC EHVPD RISK ASSESSMENT
RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/E & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# quipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
● Unstable set-up of ● Fall and topple of ● Check first for soil stability in the area ● Preplan the area where pumpcrete and concrete
pumpcrete and equipment ● Ground or outrigger pad shall be compacted and stable mixer will be positioned, ground must be leveled
concrete mixer ● Accident resulting enough to carry the weight of the equipment and compacted
injury or death to ● Out rigger must be fully extended on a stable and flat ● Driver and operator shall evaluate the ground if
personnel even ground capable to withstand the position of the Moham
● Significant ● Outrigger spreader mat pad shall be 4 times the 4 3 12 equipment 4 2 8 Yes
ed Abdu
property damage diameter of outrigger pad
to crane and ● All tires of the crane must be elevated at least 3 inches
offices building from the ground for the whole body to act as the counter
weights
6 Through control ● Poorly positioned ● Poorly positioned ● Operator should be positioned in an area where he can ● Use of MEWP like manlift, scissor lift etc. if
system where operator where operator see the movement of discharge pipe properly during available and applicable.
extending cannot see the cannot see the extension. ● Supervisor/foreman must identify areas with risk
pumpcrete pipes. pipes can ● Ground should be stable and no slippery material of falling are provided with suitable fall
machine ● Lifting operation damage adjacent should be there. prevention.
towards lean ongoing above structures. ● No lifting work should be allowed where operator placed ● Worksite Supervisors to closely monitor the
concrete operator located ● Lifting operation during extension of discharge pipe to avoid colliding. activity & recommends precautionary measures if
pouring area area. ongoing above ● Flagman should control the movement of crane and unsafe act or unsafe condition have been noted
● Inexperience operator located should stop lifting during concreting activity. during the course of the work
operator operating area can cause ● Only trained and competent operator shall be assigned ● Provide Working @ Heights training to the
Moham
the control severe injury due for the use control equipment. 3 3 9 personnel involve in working at heights. 3 2 6 Yes
ed Abdu
equipment to extend to fall of material. ● Site supervisor should present during the execution of ● Loose materials must be secured by buckets.
pipes. ● Inexperience work ● Unwanted & surplus material shall be removed.
operator ● Affected area shall be barrier off with appropriate
operating the safety signage" Overhead Works
control
equipment to
extend pipes can
damage pipes
and can cause
injury for people.

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 5 of 8 02 SS RA -010
SEC EHVPD RISK ASSESSMENT
RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/E & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# quipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
7 Mason and ● Pumpcrete machine ● Accident resulting ● Operator should first position the pipe properly, after ● Any obstructions shall be moved and kept
labor position pipes injury to holding by workmen properly the operator should start materials away from any access. Keep work area
the discharge ● Moving pipe and personnel discharging concrete. free from loose tools and materials
pipe of pouring machine sound ● Concrete spill ● Wear appropriate PPE (Clear glass, dust mask, rubber ● Provision of proper work access (i.e. ladder or
machine at the ● Poor communication outside the gloves, cover all (waterproof apron), helmet and rubber scaffold) if worked at elevated areas.
location of ● Poor visibility intended location shoes) when doing concrete works. ● Establish adequate communication and agreed
lean concrete ● Concrete may fall ● Property damage ● Handheld radio or mobile phone should be used for signal by the pumpcrete operator and worker
over workmen if not communicating properly with operator holding the discharge pipe Moham
positioned properly 3 3 9 3 2 6 Yes
ed Abdu

8 Leveling the ● Incorrect manual ● Accident resulting ● Ensure correct body positioning and manual handling ● Provision of waste bin nearby the area to maintain
concrete handling/ lifting of injury to procedures. the good housekeeping.
mixture and vibrator (forceful personnel ● Rotation to be followed to use vibrator machine. ● Provide Manual handling Training to the workers
using vibrator movement, incorrect ● Twisted wrist due ● Use of male female industrial plugs to connect vibrator (Workers shall be aware of proper methods of
to spread posture). to improper with power source. handling and moving vibrator machine).
concrete ● Use of handling ● Proper double insulated cables to be used for
properly faulty/damaged ● Fire due to concreting area to avoid short circuit.
Making proper plugs to connect presence of ● Keep hands away from rotating parts
level after vibrator with power gasoline and ● Trained workmen to be used to use leveler machine
using vibrator source. ignition source properly to avoid any injury and damage to concreted Moham
3 3 9 3 2 6 Yes
and move ● Damaged cables ● Electric shock areas. ed Abdu
forward up to passing over due to naked wire ● Supervisor/foreman to ensure all rotating parts is
the end to concreting area. connection for properly guarded.
Complete lean ● Naked wire vibrator. ● Suitable PPE to be provided and use to avoid any injury.
pouring connection in wet ● Worker doesn’t ● Safety Helmet / hard hat
concrete area. know how to use ● Safety shoes
leveler properly ● Clear safety glass when working inside the basement
can cause injury. building
● Rubber gloves when handling leveler
● Cover all with waterproof apron.

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 6 of 8 02 SS RA -010
SEC EHVPD RISK ASSESSMENT
RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/E & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# quipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
9. Bringing back ● Movement of pipes ● Improper ● Engage proper signalman to guide operator when ● Supervisor/foreman to ensure all the residual
pouring of pumpcrete movement of moving the pipes from workplace to equipment. concrete from pouring machine is secured by
machine pipes machine pipes can cause ● Stop pouring machine discharge, put one cover over placing some bag at end point.
towards the ● Residual concrete of damage to discharge pipe to avoid falling of discharge concrete ● Proper location to be decided by supervisor to
machine, start pipes adjacent during moving. clean pouring machine and truck.
cleaning pipes ● Cleaning on access structures by ● Signalman should guide the operator properly to avoid ● Supervisor should provide concrete waste
by placing road ,slippery area, colliding. touching any power lines passing near to work area. removing truck to remove concrete waste.
machine at a damage access road ● Fall of residual Proper clearance should be maintained from power line. ● Nominated parking place to be decided by
designated ● Poor management of concrete from ● Use hand truck or trolley when return excess materials engineer to park after concreting works.
area, clean drain water pipes during to store.
machine and moving. ● Ensure that all hand tools & portable electrical
move to ● Contact with equipment were properly stored after usage (kept inside
parking .Bring power lines the toolboxes or return to the store)Wear suitable PPE
back the tools during moving. when conducting housekeeping (cotton gloves, rubber
and equipment ● Concrete waste globes dust mask, hard hat, safety shoes) Moham
3 3 9 3 2 6 Yes
to store. can cause ● Dispose generated waste concrete into the designated ed Abdu
tripping hazard waste placed areas.
for other working ● Pumpcrete machine and Mixture truck to be cleaned at
crew. one designated area where proper drainage system to
● Cleaning over be made to avoid water accumulation and damage to
access road can access road.
damage
temporary
access.
● Water can spread
towards
equipment kept
areas which can
cause damage to
them.
10 Clearing the ● Manual handling ● Manual handling ● Facilitate training for manual handling. ● Labeling of storage box (good items, scrap /
. area with all ● Materials lying on the can lead to ● Observe proper posture during manual lifting, pushing, damage items, by capacity, etc.)
used ground musculoskeletal pulling, etc. ● Immediate disposal or sending the damage one
materials, ● Protruding object / disorder ● Provide storage box for cables to the store keeper
tools and materials at the site ● Fire ● Remove all unwanted / protruding materials / object at ● Daily inventory of the equipment Moham
3 3 9 3 2 6 Yes
equipment and ● Uncollected / ● Property damage the site ● Good housekeeping at the site ed Abdu
brought to the scattered rubbish ● Accident resulting ● Provision of waste skip in the strategic location at the ● Daily toolbox meeting
designated injury to worker site with marking ● Training / awareness regarding the segregation
storage and ● Provision of color coded waste bins at the site of waste
disposal area ● Provision of standby fire extinguisher ● Records / registry for the quantity of waste

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 7 of 8 02 SS RA -010
SEC EHVPD RISK ASSESSMENT
RISK
HAZARD IDENTIFICATION/‫ﺗﺣدﯾد اﻟﺧطر‬ CONTROL‫وﺳﺎﺋل اﻟﺗﺣﻛم‬ ASSESSMENT ACTION PLAN/‫ﺧطﺔ اﻟﻌﻣل ﻟﺗﻘﻠﯾل اﻟﺧطر‬
‫ﺗﻘﯾﯾم اﻟﻣﺧﺎطر‬
Follow
up by

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking

‫اﻟﺧطر ﺗﺻﻧﯾف‬Risk Ranking


Consequence /‫اﻟﺷدة‬

Consequence /‫اﻟﺷدة‬
Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬

Likelihood/‫اﻻﺣﺗﻣﺎﻟﯾﺔ‬
Whom Controls
Risks Issue
Workplace/ (name) Implem
(Possible incident)
Activity/Process/E & By ented
[What can go wrong] (Improve existing controls / implement new controls)/ ‫وﺳﺎﺋل‬
# quipment/Material Hazards/‫اﻷﺧطﺎر‬ Existing Controls /‫وﺳﺎﺋل اﻟﺗﺣﻛم اﻟﻣﺗوﻓرة‬ When Yes/No/
(Accident/ill health to ‫اﻟﺗﺣﻛم واﻟﺳﯾطرة اﻻﺿﺎﻓﯾﺔ‬
‫ﻣﮭﻣﺔ‬/‫ﻣوﻗﻊ اﻟﻌﻣل‬ (date)/ ‫ھل ﺗم‬
persons, fire or property
‫اﻟﻣواد‬/‫اﻟﻣﻌدات‬/‫اﻟﻌﻣل‬ ‫اﻟﺟﮭﺔ‬ ‫اﻟﺗﻔﯾذ؟‬
loss)
‫اﻟﻣﻌﻧﯾﺔ‬ ‫ﻻ‬/‫ﻧﻌم‬
‫اﻟﺗﺎر‬/‫ﺑﺎﻟﺗﻧﻔﯾذ‬
‫ﯾﺦ‬e
● Periodical inspection and / or color coding for fire disposed
extinguisher ● Records and registry for fire extinguisher

11 Closing of Permit ● Poor housekeeping ● Significant ● Permit Receiver shall ensure that housekeeping in done ● Permit Receiver shall account all worker under
to Work ● Undisposed waste property and before, during and after the work his Permit to Work and ensure all have signed
materials appurtenances ● All waste materials generated from the work shall be out on the attendance sheet and clear of the
● Unaccounted damage disposed properly and shall not be left unattended at area
workers ● Governmental the worksite ● Supervising Engineer and Foreman shall adhere
● Inadequate violation ● Mobile equipment shall properly parked on a designated to the proper housekeeping and storage of
communication ● Environmental equipment laydown materials at the designated location
● Poor storage of complaint ● All materials used at the site such as chemicals, ● Site Manager shall be responsible on the
Moham
chemical, flammable ● Loss of flammable and combustible materials shall be stored at 3 3 12 effective implementation of the Permit to Work 3 2 8 Yes
ed Abdu
and combustible production the designated storage at the end of each day ● Permit Issuer shall visit the work location to verify
materials and etc. ● Accident ● Electrical equipment shall be properly secured, good housekeeping was conducted before
● Unattended unsafe resulting serious distribution board closed and padlocked closing the Permit to Work
condition injury or death to
● Unsecured electrical worker
equipment, ● Significant cost
energized due to damages
equipment

Element Ref. No: 2.8 Page No: Rev. No: RA Reference No.
SEC EHV FORMS 2.8 Page 8 of 8 02 SS RA -010