Republic of the Philippines

NUEVA VIZCAYA STATE UNIVERSITY


Bayombong, Nueva Vizcaya
INSTRUCTIONAL MODULE
IM No.:IM-BE13- 2NDSEM-2022-2023

Name:_________________________________________ Section____________________________

Please read Lecture 4 attached in the MS Teams (Files), we will have a short discussion via zoom meeting
(schedule to follow). In the learning activity and assignment sections (2 questions), answer the questions
given in an essay format. You may write your answer in a clean paper, if you do not have a laptop, write
legibly, take a picture of your answer then upload via MS Teams (Assignment). Do not forget to click “Turn
In” to submit your answer. Your submitted answer will serve as your graded recitation/participation in the
class. Please take note that credits will be given to authentic and original works.

I. LEARNING ACTIVITIES (50 points)

Which of the following represents valid constraints in linear programming?


a. 2X ≥ 7X*Y
b. 2X * 7Y ≥ 500
c. 2X + 7Y ≥ 100
d. 2X2 + 7Y ≥ 50

II. ASSIGNMENT

The Aban Construction supply won a bidding to supply cements to three horizontal (road) Projects;
Projects 1, 2, and 3 require 100 bags, 170 bags, and 180 bags respectively; it has three warehouses A,
B, and C. The available bags per warehouse are as follows 120 bags for A, 180 bags for B, and 150 bags
for C. It will cost P5/bag to transport cement from warehouse A to Project 1, P2/bag to Project 2; P4 to
Project 3; warehouse B costs P3, P5 and P4 respectively for Projects 1, 2, and 3; P4, P3, P2 for warehouse
C. Get the total cost using the occupied cells.

Table 4.4 Aban Construction Supply

In accordance with Section 185, Fair Use of Copyrighted Work of Republic Act 8293, the copyrighted works included in this material may be reproduced for educational
purposes only and not for commercial distribution
NVSU-FR-ICD-05-00 (081220) Page 1 of 1
Prepared by: Aljanet M. Jandoc, PhD., EnP.