You are on page 1of 9

Quality Department

Factory Visit Report


BCC-RPT-GQC00-MQC-00036-01

April 17th, 2023

Factory Visit Report


Of
BUILT WOODEN DOORS
FACTORY

QC Engineer Quality Manager


Rabih Harba Ahmad hassan

1
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

Visited the Built Wooden Doors Factory on 17April, 2023 at Sudair City, As Built Wooden Doors Factory
complies with project requirements as per Quality Inspection and checked the order quantities as mentioned
in below table.

Site Packing Number of Doors Under Process Total


Leaf
140 898 1038
Jawharat Al Door
Ruseifa Set
_ 1292 1292
Frame
Leaf
_ 939 939
Waves Door
Frame _ _ _

1. Production Process:

A. Raw Materials of Wooden Doors


Wooden Door Frame:
The below photos are of wooden frame panels which are used to make the frame of the
wooden doors.






2
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

Hollow Chipboard:
The chipboard is the main body/part of the door.

MDF Sheets:

3
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

OMEC Radial Arm Saw:


The machine is equipped with a mill spindle which allows cutting of indents of variable height.

Wooden Doon Frame:


The structure of wooden frame is complete for the joint with hollow core chipboard.

4
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

Bandsaws:
The below machine is used for cutting solid wood, and chipboard materials for wooden doors.


OMEC Machine:
The below OMEC machine is used to press the wooden door to remove the air voids and
fix the level of the door.

5
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

Under Process: For Makkah Site

Before packing:

6
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

Packages:

7
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

Dimension of Leaf Door:

Height=2140 mm Width=815mm

8
Quality Department
Factory Visit Report
BCC-RPT-GQC00-MQC-00036-01

Thichkness=45 mm

Recommendations:
a. The QC inspection to be carried out before delivery to the site and the frequency of
visit is depend on construction team order.
b. It must be well packaged before being loaded for supply to the site.
c. The Materials must offload properly with the help of machineries without causing
any damage to the materials.
d. The frequence of visiting the factory is weekly as per project requirement.
e. Checking the Raw material as quantity and quality.

April 17th, 2023