B. COMMUNICATION SYSTEM
1. Changed of
transmission design
from 150 pair copper 1. Variation Order under
cable to FOC data review of DOTr-MRT3 &
transmission. OGC-MRT3.
2. DOTr-MRT3 has 2. This is a Critical Path
finalized the VO BOQ on for the start of
28 October 2019. installation and may
PRIORITY. 3. SC taking too much affect the rehabilitation
Installation, Test & Commissioning of Installation at Depot, time in the submission Speed up PABX VO work schedule.
2 61% 0% -61% of the proposed VO. work to catch up the 3. NEW schedule 16-Jun-21
PABX System Station 01, 02, 03 & Revised VO proposal rehabilitation delay. received from 01
04. was submitted on 05 September 2020 to 16
October 2020. June 2021.
4. Under review of both 4. SC reported that has
DOTr-MRT3 & OGC- started PABX VO works
MRT3. due to agreement
5. SC has started the signing between DOTr
PABX VO due to & SC.
agreement signing
between DOTr & SC.
COMMENTS
`````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````````
Report format is based on Sumitomo's Alternative Schedule (Final Plan) for Signaling system, CCTV system, PABX system and PA system and updated until 26 February 2021 and the Signaling &
Communication system has already slipped by -12.4% (previous = -13.7%). Delays are due to limited rehabilitation local manpower. However, Sumitomo is now increasing it subcontractor
1 manpower and it was noted that Signaling Rehabilitation is now catching up based on Alternative Schedule (Final Plan). Please note that the upgrade issues of the Telephone system is still 0% and it
might affect the project schedule. Sumitomo reported that PABX VO works has started on engineering upon signing of agreement between DOTr & Sumitomo. Next update on 05 March 2021. Please
refer below for subsystem progress.
PABX System. Overall accomplishment = 0%. SC has reported 21.0% overall accomplishment (for engineering, procurement, delivery, installation, test & commissioning)
4 Depot = 0%; Station 1 = 0%; Station 2 = 0%; Station 3 = 0%; Station 4 = 0%; Station 5 = 0%; Station 6 = 0%; Station 7 = 0%; Station 8 = 0%; Station 9 = 0%; Station 10 = 0%; Station 11 = 0%; Station 12 =
0%; Station 13 = 0%. Ongoing engineering process. Next update on 05 March 2021.
Signaling System. Overall Installation accomplishment = 85.2% (previous=78.3%) (Outdoor equipment & cabling = 85.1%; Indoor equipment = 90.6%; Indoor cable termination 69.0%).
Depot = 100%; Station 1 = 100%; Station 2 = 100%; Station 3 = 100%; Station 4 = 93%; Station 5 = 82%; Station 6 = 100%; Station 7 = 100%; Station 8 = 100%; Station 9 = 100%; Station 10 = 59%;
Station 11 = 36%; Station 12 = 53%; Station 13 = 20%. Current local manpower = 79 (previous = 79) + 10 safety officers. PAT on Signaling system at Station 6 on October 14, 2020. PAT on Signaling
6 system at Station 7 on December 22, 2020. PAT on Signaling system at Station 8 on February 10, 2021, PAT on Signaling system at Station 9 on February 11, 2021. Next update on 05 March 2021.
Signaling System Test & Commissioning. Overall Test & Commissioning accomplishment = 33.0% (previous = 31.2%)
Object Test accomplishment = 53.1% (previous = 46.9%)
Depot = 100%; Station 1 = 95%; Station 2 = 73%; Station 3 = 22%; Station 4 = 0%; Station 5 = 0%; Station 6 = 100%; Station 7 = 100%; Station 8 = 100%; Station 9 = 100%; Station 10 = 0%; Station 11 =
0%; Station 12 = 0%; Station 13 = 0%.
EBIScreen Server Test = 33.3%
7 Area 3 = 0%; Area 2 = 100%; Area 1 = 0%
Correspondence Test = 31.7%
Area 3 = 0%; Area 2 = 95%; Area 1 = 0%
Checked by:
Fernando R. Petilla
DEPARTMENT OF TRANSPORTATION - METRO RAIL TRANSIT 3
DAILY MONITORING OF STATUS OF ACCOMPLISHMENT
MAINTENANCE WORKS
TARGET ACTUAL
ACCOMPLISHMENT TO ACCOMPLISHMENT TO SLIPPAGE (net
DATE (percentage DATE (percentage percentage of BALANCE OF WORKS IF
NO ACTIVITIES where works should where works are works: ahead, on- NEGATIVE
now be per original actually now per May time, delayed)
May 1, 2019 plan) 1, 2019)
(Identify if
% % ±% Priority/Critical
Works)
3
Monthly Preventive Maintenance of
EBILOCK 950 (Cleaning and functional 0.0% 0.0% 0.0% NA
testing)
4
Monthly Preventive Maintenance of
EBIScreen 900 (Cleaning and functional 0.0% 0.0% 0.0% NA
testing)
5
Monthly Preventive Maintenance of
Point Machine (Inspection, motor voltage
& current measurement, gap & blade 0.0% 0.0% 0.0% NA
opening measurement, lubrication and
functional testing)
6
Quarterly Preventive Maintenance of
Insulated Rail Joints (Cleaning and 0.0% 0.0% 0.0% NA
tightening of IRJs)
B. COMMUNICATIONS
1
Daily Preventive Maintenance of CCTV,
PA and Telephone Equipment (Visual 3.2% 3.2% 0.0% NA
checking and cleaning) at Station 6.
2
Quarterly Preventive Maintenance of
CCTV System (Functional testing and 7.7% 7.7% 0.0% NA
Cleaning of CCTV System) at Station 1.
3
Monthly Preventive Maintenance of
PABX System (Visual inspection and 0.0% 0.0% 0.0% NA
checking of MDF and telephone lines)
MAINTENANCE PROGRESS AS OF 01 MARCH 2021 Overall - PLANNED 2.3% Overall - ACTUAL 2.3%
2.4% 2.4% 0.0%
NOTES
1 The report today was yesterday's day shift and night shift. All day shift and night shift works today will be reflected on tomorrow's report.
2 Additional activity: Daily inspection of point machines and IRJs at Station 1, 7 and 13 - Done.
a. Manpower b.
Spare
Parts/Materials c. (MM-DD-YYYY)
Equipment d. Others
SUFFICIENT &
NA NA NA
AVAILABLE (Daily)
SUFFICIENT &
NA AVAILABLE (Daily) NA NA
SUFFICIENT &
NA NA NA
AVAILABLE (Daily)
SUFFICIENT &
NA NA NA
AVAILABLE (Daily)
SUFFICIENT &
NA AVAILABLE (Daily) NA NA
SUFFICIENT &
NA NA NA
AVAILABLE (Daily)
SUFFICIENT &
NA NA NA
AVAILABLE (Daily)
`
SUFFICIENT &
NA NA NA
AVAILABLE (Daily)
NA SUFFICIENT & NA NA
AVAILABLE (Daily)
on tomorrow's report.