Professional Documents
Culture Documents
Customer not
satisfied , Effect next Prepare setup sheet to provide training,
1.Provide training for measuring tools. 1. (Syafiq)
process, High material Wrong Setup, Machine perfomance, provide training how to use measuring
2.Prepare setup sheet 3.Prepare 2.(Sham)
Part Damage cost, Lost our 8 wrong handling, Programmer know 6 tools, Machine mattainance checklist 8 384
carrier bin for storage. 4.Machine 3.(Hanjie)
productivity, Labour how (weekly & monthly), storage inside carrier
maintanence schedule. 4.(Faiz)
cost, Damage the Laser bin
Nozzle, Shutter
Part Warping,
Over Heat Dimension Out, 3 Programmer know how 6 Basic Exam/ WI for software 9 162 N/A
Part Twist
Next process effect, Wrong Nozzle use, Machine condition Prepare setup sheet to provide training,
Burr 3 6 8 144 N/A
cosmatic issue & perfomance Machine maintainance weekly & monthly
Material wasted,
Machine perfomance, programmer Machine maintainance weekly & monthly,
Over Travel Productivity effect & 2 6 5 60 N/A
know how basic exam (internal or external training)
Labour cost
Material waste,
1.Provide thickness gauge for measurement.
Wrong Material - Material Customer not Do measurement before load the material, 1.(Sham)
8 No proper label,marking, storage 6 6 288
type satisfied, Do a label markin 2. (Hanjie)
2. Provide label marking.
Effect next process
Part damage,
Customer not Power failure, programming error, Qurantine the parts and send for buyoff, 1.Provide carrier bin 1.(Hanjie)
Over Cut 8 6 8 384
satisfied, machine alarm, programmer know how basic exam (internal or external training) 2.Provide training for programmer 2.(Amada)
Material & Labour cost
Part damage,
Material & Labour
cost,
Machine damage, Technician know how, No proper setup Prepare setup sheet WI how to operate the
Wrong Setup Machine 5 6 8 240 1.Provide setup sheet & WI 1.(Sham)
Hardburr, sheet & W machine
Productivity effect,
Laser Cut Nozzle
damage
KWPG2-EN-FRM-009 REV C
Dimension Out,
Customer not satisfied, 1. Prepare Golden sample 1,4.(Faiz)
Material waste, Effect 1. Human error 2. No proper jig 3. No 1. Golden sample 2. Provide training 3. Use a 2. WI 2. (Sham)
Buffing Over buff
next process, Machine &
4
proper tools use 4. No proper method
8
jig 4. Have a WI
8 256 3. Design Jig 3.(Ammar)
labour cost, effect 4. Jig maintanance schedule
productivity
Material Waste,
Wrong setting Productivity & Labour 8 No Setup sheet, No WI, 6 Prepare setup sheet & WI 5 240 Tooling Checklist Syafiq
cost effect
Loading error Part damage 8 Human error 9 Provide training , WI 9 648 WI Inspection Sham
F-QA-079-A
KWPG2-EN-FRM-009 REV C
R
P
N
KWPG2-EN-FRM-009 REV C
KWPG2-EN-FRM-009 REV C
Severity
high The product does not meet the standard requirements and cannot be used. 7
The production line is severely interrupted, and all products may be scrapped. Major
8
functions fail. Customers are very dissatisfied.
Approximate process
Incidence Probable failure rate fraction
capacity Cpk
Hardly happen: Failure is unlikely. No
failures ever associated with almost £ 1 in 108 ³ 2.0 1
identical processes
Very High Defects are automatically found in the process 1 in 10,000 100 1
Very High Control will almost certainly find defects 1 in 5000 200 2
High There is a high chance that control will find defects 1 in 2000 500 3
1 in 1000 1,000 4
Moderate Controls may find defects 1 in 500 2,000 5
1 in 200 5,000 6
1 in 100 10,000 7
Low It is also difficult to find defects in control 1 in 50 20,000 8
1 in 20 50,000 9
Very Low Controls will not detect defects 1 in 10 100,000 10
Scraches on class A
surface
AND AND