CP Date ( Originated ) : 26.07.2012
CONTROL PLAN
Proto type Pre launch Production 02525
Key Contact / Phone: XXX- 320092 / 252552 / 256158 CP Number: CP:MPP:01
Process Specific Description: front beading for high roof Other Approval / Date (If Reqd) : Customer Quality Approval / Date (If Reqd) :
Specia Methods
Process Name l Char. Product /
Part / Machine, Device, Jig, Tools Evaluation / Reaction Plan/ Corrective
/ Operation Process Sample
Proc # For Mfg. Product Process Class Specification / Measurement Sample Freq. Control Method Action / Responsibility
description Size
Technique
CTQ's Tolerance
As per
1.Test certificate Reject material for return to
10 Procurement Sinthetic Rubber drawing 50 gms Every lot Visual
2. Visual check supplier
of raw specification
material
Smooth
40 Extuiding Extruder Machine As per As per
Extruding/
Mixed batch extruding drawing 100% 100% Specification/
dimension
specification Formulation
/finishing
As per
Production Inprocess Vernier, as per Reject material isolate
drawing 1st Pcs. Every batch
Approval inspection measuring Tape Specification/drg batch/check process setting
specification
Production lot
As per Vernier, Reject material inform to
visual defects Final as per
drawing measuring Tape 100% Every batch production incharge /
(Sink,Halfshot.Flas inspection Specification/drg
specification /Visual Review
h, Color Change)
Production lot
As per Vernier, Reject material inform to
visual defects Final as per
Hot air oven/ Micro wave (Sink,Halfshot.Flas drawing measuring Tape 100% Every batch production incharge /
60 Curring inspection Specification/drg
oven specification /Visual Review