LEED 2.什么能得 怎么得到 如何得到 1. IN创新 Q: Which of the following may earn a project IN Credit Innovation for Innovation? Education program is not a onetime event
到IN分? IN分,我选 最多的IN 的选项1的 A: Implementing a green education program
education 的 分,选项包 内容考了2 Q: Which action would earn a project an Innovation credit for a LEED BD+C: New
program; education 括几个 道题,大家 Construction project?
program什 PILOT或 记住是选 A: Development of a public education program /
么的,IN我 者几个 项1,试用 Designing a net-zero building /
没看所以 exemplary
得分项和 Achieving the pilot credit for ergonomics /
也不知道 performan Implementing a green cleaning policy and program /
EP表现不
选的对不 ce
是选项1哦 Q: Which of the following instructional initiatives would satisfy the requirements of an
对
education program for innovation for IN Credit Innovation?
A: Comprehensive signage program throughout the project to educate occupants about
the benefits of sustainable buildings /
Case study highlighting the successes of the LEED BD+C project that could be used
for other building projects /
Weekly guided tours about sustainability using the project as an example
LT 13.access 至少50% 也被问到 20. 一个学 Access to 11. 问了 Q: For a LEED BD+C: School Project, which details will the project team need to show Project teams pursuing Option 2: Pedestrian Access
to quality 学生住在 access to 校招收8年 Quality access to regarding pedestrian access to the school for LT Credit Access to Quality Transit? need to delineate a walkshed boundary using mapping
transit里 walking quality 纪以下的 Transit: 记 quality A: A map with a walkshed boundary software (GIS or CAD). The walkshed boundary varies
school distance不 transit里 学生,住宿 清楚距离, transit里 based on the age or grade level of the school. Points
option 2? 超过 school 的地方与 还有看清 school are earned based on the percentage of students in the
有 3/4mile(8 option 2 学校的距 是否周末 option2: boundary.
attendanc 年级或14 离是1200 也有 3/4 mile.
e 岁以下)、 米,至少百
至少50%学生住在距学校任一出入口walking distance不
boundary, 1.5mile(9 分之50的
超过3/4mile(8年级或14岁以下)、1.5mile(9年级或15岁
年纪或15 学生满足;
以上);
岁以上)距
学校任一
出入口;
LT 22.涉及到 6. 涉及到 Q: A 500,000 SF (46,500 m2) mixed-use building pursuing LEED BD+C: New 商业项目: 前100个regular occupants配1个shower,后面
shower的 洗浴的选 Construction includes office space and residential space. The office space has 102 每150人配1个;住宅项目: 无需配shower
选项?自 项,自行 regular building occupants and 40 peak visitors. The residential space has 30 units with
行车、室外 车、室外用 40 residents and 20 peak visitors. How many shower facilities are required for LT Credit
用水先决 水先决条 Bicycle Facilities?
条件和室 件和室内 A: 2
内用水得 用水得分
分点; 点;
LT 24.满足LT 11. 满足LT Q: A project team is reviewing a map showing an office project, two functional entrances, This is correct. If there are multiple stops within any
quality 800m范围 transit stop locations, and walking routes and distances to transit stops. Which transit walking distance, only one counts.
transit的选 内的选项 options do qualify toward LT Credit Access to Quality Transit?
项?周一 周一到周 A: A bus-line a 1/4-mile (400-meter) walking distance of one functional entrance that has
到周日, 日有火车, trips in both directions/
1/2mile, 还有选项 A ferry a 1/2-mile (800-meter) walking distance of the building's functional entrances
有火车, 是周一到 Q: A project team is reviewing potential sites that have a diversity of transit routes. Which
周五,或者 site feature would help the project earn more points for LT Credit Access to Quality
超出 Transit?
800m;
A: A site served by a bus route and a light rail route for which no one route provides more
than 60% of the total trips
Q: An apartment building pursuing LEED BD+C: New Construction has two functional
building entries. One entrance is within a 1/4-mile (400 meters) walking distance of a bus
stop. The other entrance is within a 1/2—mile (800-meters) walking distance of multiple
stops of a rail station. Each transit route has service in both directions. Which criterion is
true for how these stops count toward LT Credit Access to Quality Transit?
A: Only trips from one stop of the rail station may be counted.
Q: A university housing project with 100 one-bedroom apartments has a baseline parking
capacity of 1 parking space/unit from the ITE handbook. The project will earn 1 point
under LT Credit Surrounding Density and Diverse Uses but not earn LT Credit Access to
Quality Transit. The project includes off-street parking. How many preferred parking
spaces for carpools must the project include for LT Credit Reduced Parking Footprint?
A: 3 spaces
SS 31.可持续 24.
选址、施工 可持续选
污染防治、 址、施工污
什么算做 染防治、什
永久固定 么算做永
措施?有 久固定措
护栏等、选 施、有护栏
择草籽种 等、选择草
植; 籽种植;
SS 32.什么得 27. 开放空 Q: The total site area (including the building footprint) of a project is 100,000 SF. The Wetland or naturally designed ponds count as open
分点有利 间有利于 project has a FAR of 1.75. How much vegetated area is required to earn Open Space? space if the side slope gradients are 1:4 or less (not
于健康和 健康和体 A: 7,500 SF (100,000 SF x 30% x 25%) more)
体育锻 育锻炼; Q: Encouraging human interaction with wetland and natural areas for open space can be
炼?open accomplished with all of the following: Pedestrian-oriented paving or turf areas count.
space; A: Side slopes of 1:4 or more Note athletic fields with turf grass DO count toward this
Q: For a mixed-use office and residential project, which space qualifies as outdoor space credit, but there is a limit to how much turf grass the
for SS Credit Open Space? project can have for the credit.
A: A playground shaded by trees
Q: A site master plan includes the development of stores, restaurants, and other Shared open spaces, such as a park, that are used by
businesses. The site is not a LEED-ND project. For a LEED BD+C: New Construction multiple buildings within the same site master plan that
project that is part of the site master plan, which statement is true about open space as it are not LEED projects can be included in the open
relates to SS Credit Open Space? space and vegetation calculation.
A: Open space adjacent to the building could count toward the credit.
Q: Which feature is open space required to have for SS Credit Open Space?
A: Usable by people on the site
MR 16.MR MR Q: A major office renovation is attempting to reuse the building where possible. The Included in reuse calculation:
material building following items have structural floor / roof decking / envelope
reuse里面 material been maintained during the renovation: (left side table)
的 reuse里面 What percentage of the building qualifies Building and Material Reuse for MR Credit Excluded from the calculation:
hazardous 的 Building Life—Cycle window assemblies / nonstructural roofing materials
material计 hazardous impact Reduction? / structural/envelope materials that are structurally
算的时候 material计 A: 84% unsound / hazardous materials such as asbestos /
是分母? 算的时候 Q: The following items were removed from a renovation project and will not be reused. materials that pose a contamination risk to occupants
分子?既 是,分母? What item must be such as walls with lead paint
是分母分 分子?既
子?不会, included in the calculations for Materials and Resources Credit Construction and
是分母和
我选的都 分子?都 Demolition Waste
不算,我觉 不是? Management?
得 A: Carpet that is not Green Label Plus certified
hazardous Wrong Answer:
的本来就 Asbestos tiles / Excavated soil / Land-clearing debris
不算;
MR 39.哪些算 石膏板砸
41. MR考 46.哪些材 哪些材料
作废弃物 的相当多,碎了填入 料可以算 可以算在
转化?我 也是我不 场地,金属 在 Diversion
选的金属 太熟悉的 碎片回收 Diversion Calculatio
碎片回收 部分,哪些算回收利 Calculatio n 里面
到回收厂 算作废弃 用,场址挖 n 里面?
融化; 物转化, 的碎土和
树枝都不
算废弃物,
MR 40.在哪些 48. 在哪些 15. 还有一 选项是各 Q: A project team for a heaithcare facility is developing flexibility goals in anticipation of
地方采用 地方采用 题问 MR 种组合,会 the future expansion of the building. The building may be expanded both up and out.
灵活性设 灵活性设 design for 议室,住院 Which overall strategies would help conserve future resources?
计最合 计最合适, flexibility, 区,什么什 A: Oversized corridor /
适?我选 间隙、过道 可移动隔 么医疗区, A facade that accommodates new openings and additions /
了包括 等; 墙可以放 interstitial A structural system to handle increased vertical loads
interstitial 在哪。 space,会 Q: When designing for flexibility, project teams should focus on the portions of the
space间 客室什么 building typically subject to change, which include all of the following:
隙、过道的 的 A: Movable furniture / HVAC services / Department layouts
答案;
MR 45. MR-
Demounta Design
ble For
partition 可 Flexibility:
以加在哪 Demounta
个空间? ble
额外 partition 可
occupied 以加在哪
space; 个空间: 额
外
occupied
space
MR 50.计算题 问的是一 26. 保护栖 7. 还算了 3. 计算题 4. 具体计 废物流的 还有个算reuse的,50%从100mile以内的一个recycle怎样怎样,5%是从100mile以内的
跟前辈们 个footprint 息地种植 一道关于 跟前辈们 算的大概 计算注意 reuse怎样怎样,45%从100mile以外的mine来的。原题是具体数据,不是100mile以内以外这
回忆的差 3,000sf 的 屋面需要 转移率的, 回忆的差 有3道,一 以下几点: 样。最后我选的是11000吧,其他选项是19500,5500,还有一个忘了。这个我没算出来。
不多,三 五层new 多少,是一 总共20吨 不多,三 道考了 recycle
题,MR 里 building, 个很长的 材料,其中 题,MR 里 protect or and 7.保护和恢夏栖息地达到优良表现 已用本地植物恢复了 部分需要谱加的种植屋面面积为多
面的raw 在一个 计算题,污 回填土多 面的raw restore salvaged 少 25000
material选 100,000sf 染面积多 少,某可回 material选 habitat的 必须是no
的 少,开口空 收材料多 exemplary
了11000, 少,某个材 了11000, hazardous 还有个算reuse的,50%从100mile以内的一个recycle怎样怎样,5%是从100mile以内的
SS restore disturbed 间多少,都 SS restore performan ; 计算是以
是迷惑你 料的转化 reuse怎样怎样,45%从100mile以外的mine来的。原题是具体数据,不是100mile以内以外这
那个选了 土地上建, 那个选了 ce,一道是 WEIGHT
最后保留, 的; 率是多少 样。这题之前也有人分享过,我算出来也是11000好像..
25000,废 等等,最近 25000,废 building or
35,000sf product
物流选了 算一个总 物流选了 VOLUME 46. 多少的石膏板5%从哪里买来的,50%从哪里买来的,计算可回收材料贡献的费用;
paving和 disclosure
90%; 的转化率 90%。 为基准;
35,000 sf and EXCLUDE
green optimizatio EXCAVAT
open n里的 ED SOIL
space。问 ADC
要得到
LAND
habitat
CLEARIG
examplary
DEBRIS等
credit 要建
等。
最少多少
的
vegetated
roof。
MR 2. 转化75%材料且包含至少4类; 2 分
Constructi
on and
Demolition
Waste
Managem
ent
(Option
1): 转化
50%材料
且包含至
少3类; 1
分
MR 11. waste
diversion
的距离怎
么算,
roadway,
direct way,
还是
transportat
ion way,
还有1个记
不清了。
MR 还有比如
实际应用
的,MR生
命周期的
op3,问你
一面水泥
墙,上面有
门的话,怎
么计算
reuse的面
积。
MR
MR
EQ 11.水景旁 水景旁边 1. 五星级 水景酒店 水景旁边 12. 问你会 Q: Views into interior atria may be used to meet up to which percentage ofthe required
边的酒 的酒店可 酒店旁边 得分:选择 的酒店可 选择哪个 area for EQ Credit Quality Views?
店? 以得哪个 的水景,追 quality 以得哪个 得分点,如 A: 30%
quality 分,应该是 求革新,选 view 分,应该是 果项目前
view; quality 择高质量 quality 有水景。
view 视野; view
EQ 18.EQ EQ smoke 51. 控烟在 Tobacco 3. 考了一 。。。最后 8. 考了no Q: Which actions does a retail building owner need to take to prevent or minimize
smoke control,是 那个门的 Signage : 道是禁烟 经过理论 smoke的 occupant exposure to
control要 不是每个 多少米设 Within 10 标志应该 分析我选 标志是在 environmental tobacco smoke?
求?所有 门的3米内 置控烟标 feet of any 贴在离入 了距离所 main entry A: Post signage within 10 feet (3 m) of all building entrances indicating the no-smoking
出入口, 都要有提 志,所有门 functional 口(主入口 有功能入 还是 policy. /
10feet; 示牌?还 的3米处; entrance 还是所有 口3m的地 functional Prohibit smoking inside the building.
是就是主 入口)3m 方贴禁烟 entry,距
门前面有 还是7.5m 标志,翻了 离10feet。
就好 的地方? rating
这种细节
我在到底 system 是
一定要记
贴主入口 对的。 清楚别弄
还是所有 混
功能入口
上纠结了
好久
EQ 41.改变人 49. 改变人
流量会导 流量就会
致?改变 改变最小
最小通风 通风的流
的流量; 量;
EQ 42.什么测 50. 什么测
点可以间 点可以间
接测量人 接测量人
数?CO2 数,选择二
测点; 氧化碳测
点,根据浓
度判断;
EQ 43.清洗间 53. 清洗间 Q: Project team for a hotel is trying to earn an Innovation credit by including a green
和换衣室 和换衣室 cleaning policy that uses environmentally preferable cleaning products and equipment.
相邻怎么 相邻怎么 The building will have a housekeeping space and mixed-mode ventilation. Which
避免交叉 避免交叉 statement is true about the project's ability to meet the requirements of interior cross-
污染?建 污染,建立 contamination prevention?
立单独的 单独的机 A: The housekeeping space would need to additionally include self-closing doors,deck-to-
机械排风 械系统; deck partitions, and a hard-lid ceiling to meet the requirements.
系统,self-
closing门
deck-deck
什么的;
EQ 44.一道奇 那个选择 还有一个 CFR和
奇怪怪的 Preventive什么顾客 O&M包括:
题目,没读 Maintenan 想要什么, Preventive
懂,但是想 ce的题目, 然后应该 Maintenan
到JJ,我就 几经里面 提供什么 ce
选了 有 建议,应该
Preventive 是
Maintenan preventive
ce那个答 maintenan
案; ce。这题我
真心没看
懂其实,但
是就选了
这个。
EQ 49. 影响 8. 关于混 5. 我最后选 还考了
reverberati reverberati 响时间和 Acoustic的 了HVAC, school
on混响时 on time的 什么关系 那题也考 这个很不 Reverbera
间和什么 因素包含 最小,选项 到了,问的 确定。考前 tion Time,
关系最 哪些 有房间的 是算 在RG里面 问那些会
小?HVAC 长宽, reverberati 看了算 影响到测
噪音大小; HVAC噪音 on time的 reverberati 评它吧还
大小,天花 时候哪一 on的公式, 是什么的,
板的吸声 项影响最 考试的时 选项有
材料,还有 小。选项有 候记不清 furnished,
什么材料 room 了 不
的减噪什 furnished,
么的:与房 height and
width, 附 老师讲课,
间的吸声
量和体积 近的HVAC nearest
大小有关; 噪音大小, HVAC 启
ceiling的吸 动,还有
声材料, ceiling吧好
wall的什么 像
什么材料。
EQ 医疗 包括典型 学校 “the school
ACOUSTI 房间的谈 ACOUSTI measurem prerequisit
C:仅在得 话隐私、隔 C:在先决 ent must e minimun
分项中出 音;MEP背 条件及得 be acoustic
现, 景噪声;声 分项中出 performed performan
学装饰(平 现,在 postoccup ce.
均声学吸 HVAC ancy and HVAC
收系数)以 BACKGR
及外部噪 OUND should be noise <40
声(降低外 done in DB
NOISE中 furnished
部交通 飞
提到 spaces
行器 等对
<35dB with HVAC
它的影响,
也要降低 systems
它对周围 operating
社区的影 in typical
响,考虑外 condition
围护结构 and while
的STC) no
occupants
are
present”
EQ 51. 10. MR 里 Q: A project team has hired a LEED consultant to assist them with their first LEED
constructio 面 project. What
n IAQ plan constructio will the consultant need to tell the project team to take photographs of if they choose to
要什么 n IAQ plan pursue
document 要什么 those credits?
? document A: IEQ Credit Construction IAQ Management Plan
photograp 。我选了
h; photograp
h
EQ 54.flush- 0.3 55. 建筑面 Flush out
out考了两 cf/sf/min 积多少,高 (Before
道,入住 or 度多少,需 Occupanc
前:14000 minimum 要多少风 y: 14,000
cf/sf;入住 IAQ 量实施吹 cf/sf)
期间:先提 (ASHRAE 洗,14000
供 62.1标准 乘以高度。
3500cf/sf, 或欧盟标
空间使用 准) ,两者
后, 以更严格,
每天吹洗
前,入住前
3h开始通
风,达到
14000为
止;
EQ EQ (自然通风
Minimum 系统,在每
indoor air 个thermal
quality zone监测
performan CO2,传感
ce, CO2 器必须在
minitor的 地板
要求?我 thermal
选了每层 zone上
都要有+ 3~6 feet;
between 住宅每层
36 feet 每户均有
above the CO监测
floor..EQ 器;).
部分正确
率超低感
觉又是选
错了吧..
EQ 6. 也被问 4 医院用的
到了医院 轮椅(皮
用的轮椅 椅)中,以
(皮椅)中, 下哪一项
哪一项是 是室内环
室内环境 境要特别
要特别评 评估的?
估的 选项有占
总重量4%
的底座不
能含铅什
么的,占总
重量20%
的轮子不
能含铬。
(不准确,
大概这么
个意思)
EQ 5 室内墙壁
刷成high
reflective
的涂料以
减少照明,
这种策略
能得哪种
分。
EQ-C-室内
照明
EQ 还有一道 我选的是
问 炫光,因为
daylight, 考虑到他2
大概是说 个玻璃面
一个办公 都在采光,
室在一个 收到直射
长方形平 的概率更
面的角上, 高,需要额
它在 外的设施
daylight和 处理炫光。
interior 其他选项
light 上会 是内部光
有哪些地 控制,
方特别难 daylight之
处理, 类的记不
清了。
EQ 8施工污染
防治必须
要做的: 最
低设备排
放要求 外
围安装控
制
EQ
IN
IN
RP 10.RP根据 RP根据什 44. 试点根 6. 13. 3 还有 RP根据什 接下来是RP credit不再是based on zip codes, 而是gis based program.
什么? 么,经纬度 据经纬度 Regional Regional regional 么,经纬度
environme 还是 选择; Priority那 Priority 那 priority, 问 还是
ntal zone; environme 题,之前看 题我选的 哪个决定 environme
ntal zone 过论坛里 是 它吧。我选 ntal zone。
写的,貌似 Environme 的 我考试的
选择 ntal zone. Longitude 时候纠结
Environme 其他选项 , 了一下,后
ntal zone. 还有经纬 Latitude。 来还是选
其他选项 度,climate 不知道对 的之前一
还有经纬 zone还是 不对 个备考贴
度,climate 什么的记 里面说的
zone啥的 不清了 经纬度。但
是我刚刚
查了一下
RP,感觉
应该是
environme
ntal zone.
Project/ 4.什么 HEALTHC 4. 集成设 HEALTHCARE;
IP rating ARE;这个 计研讨会
system的 是IP的 Charrette
项目必须 PRE,我当 只针对于
有 时纠结半 医疗保健,
Integrative 天医疗和
Process设 学校,还好
计来综合 纠结半天
设计等 选对了;
等?
Project/ 5.IP能耗 10. 问了 Q: A project team is reviewing a simple box energy model for a large commercial building Site conditions / Massing and orientation / Basic
IP simple box simple dominated by external loads. Which strategy can help decrease envelope loads? envelope attributes / Lighting levels / Thermal
评估了哪 box。 A: Increasing the insulating value of the glazing and window frame system comfort ranges / Plug and process load needs /
个? Q: Which aspects must a project team evaluate for a simple box energy model to earn Programmatic and operational parameters.
thermal Integ rative Process credit?
comfort A: Thermal comfort ranges / Plug and process loads
range; Q: For Integrative Process credit which factors must project teams assess through simple
box energy modeling before completion of schematic design?
A: At least two potential load reduction strategies
Q: Which factors should be modeled in a preliminary energy analysis?
A: Only options that have large consequences on energy use
Q: Which options would be considered when evaluating building envelope performance
as part of a simple box energy analysis?
A: Effects of the percentage of exterior glazing on energy loads
Q: Each item would be developed for EA Prerequisite Fundamental Commissioning and
Verification except which ofthe following?
A: A simple box energy model
Project/ 6.OPR和 BOD和 讨论项目 OPR和 5. OPR和 以下哪项 5 还有一个 Q: Which action must a project team take for implementation of the Integrative Process
IP BOD有哪 ORP的确 的LEED目 BOD的具 BOD的细 是OPR的 是以下哪 credit?
些点,考了 考了很多 标什么的 体要求 节有被问 内容,选项 项是OPR A: Document how the analysis informed building and site design decisions in the project's
3道,务必 题,真的推 是属于什 到。 好像有 的内容,选 OPR and BOD
仔细看; 荐去好好 么阶段,选 operationa 项好像有 Q: Before construction documents are written for an office project, the project team
看一下 项有LEED l goal,还 operationa makes some design modifications as a result of value engineering. Who will be
SCOREC 有一个是 l goal,还 responsible for updating the Owner's Project Requirements?
ARD还是 performan 有一个是 A: The owner(s)
BOD,应该 ce criteria performan Q: At which point during a project schedule is the Basis of Design created?
是BOD and一个什 ce criteria A: During the schematic-design phase
么。 这题 and一个什 Q: Which action would a third-party commissioning agent most likely take in the pre-
也是别人 么。我不确 design phase of a project?
分享过得, 定and后面 A: Verify that the architect's and engineer's designs meet the owner's project
但是最后 那个东西 requirements
我自己选 是不是,不 Q: In a goal-setting workshop, which information should be documented to guide the
了什么我 过选了这 integrative process?
也忘记 个。(可能
了。。 A: Owner's project requirements (OPR)
是
Q: Which document will serve as the foundation from which all design construction,
Performan
acceptance, and operational decisions are made?
ce criteria
A: Owner's Project Requirements (OPR)
and
Q: The number of occupants, their function, and the occupancy schedules for the building
assumptio
would be noted in which document?
ns,但这个 A: Owner's Project Requirements (OPR)
是BOD) Q: Which system is required to be included in the Owner's Project Requirements (OPR)
but does not have to be commissioned for Fundamental Commissioning and Verification?
A: The building envelope
Project/ 7.IP水耗怎 Q: Which statement is true regarding a project team's ability to use the water budget from A water budget is a project-specific method of
IP 么评估用 a school project and app|y it to an office project? calculating the amount of water
水量? A: The application of the school project's water budget will not apply to the office project required by the building and associated grounds.
water because water budgets are project-specific. The budget takes into ccount indoor, outdoor, process,
budget分 Q: Which water-budget information provides enough data for use in the Discovery phase and makeup water demands and any on-site supply,
析; of water-related systems? including estimated rainfall.
A: A week's worth of data showing that 5,000 gallons (18,900 liters) of water will be used Water budgets must be associated with a specified
amount of time, such as a week, month, or year and a
Q: Which tool would a project team use to calculate the 95th percentile rainfall event for quantity of water such as kGal or liter.
SS Credit Rainwater Management?
A: USGBC Rainfall Events Calculator
Q: The WaterSense Water Budget tool uses which variables to determine how much
water a project needs?
A: Evapotranspiration levels / Each location's rainfall
Q: A landscape designer is calculating the landscape water budget for a school project.
Which areas can be optionally included in or excluded from the calculations?
A: Vegetated playground
Q: A site project has two landscaped sections: one that requires irrigation and one that
does not because it is Xeriscaped. How should the project team calculate the landscape
water budget?
A: By making two separate calculations, one for the irrigation section and one for the
unirrigated area
Q: When calculating the landscape water budget for a site, which areas must be
included?
A: Hardscapes (pervious or impervious) / Unvegetated softscapes (muiched paths,
playground areas)
Project/ 9.AP与 AP与OPR Q: Which project team members' presence on a project would help meet the
IP OPR的关 的关系,选 requirements of nultiple credits for a prospective LEED BD+C: Data Center?
系?AP帮 项有AP帮 A: LEED AP BD+C and a qualified CxA
助owner写 助owner写 Q: The classification of a sink in a mixed-use project is unclear. Which action should the
opr; opr,AP帮 LEED AP take when performing the indoor water-use calculations?
owner发布 A: Classify the sink as public
opr,AP和 Q: If a project team is pursuing the prescriptive path of WE Prerequisite indoor Water Use
设计团队 Reduction, which information should the LEED AP provide to the MEP engineer to assist
一起写 in meeting the credit requirements?
OPR,AP A: Example fixture cutsheets that fulfill the intent of the credit
监督团队
创作OPR
Project/ 21.集成设 集成设计
IP 计的三个 的三个过
过程?讨 程、讨论、
论、设计施 设计施工、
工、运营反 运营反馈 ;
馈;
Project/ 26.社区的 16. 社区的 Q: What challenge do low-income communities face with vacant or underutilized sites? LT Credit High-Priority Site rewards projects for building
IP 经济目的 经济目的 A: Perceived stigmas or economic barriers in priority designations. The sites may have the
是?降低 是降低基 perception that they would not be good site locations
基础设施 础设施的 because of the low-income community.
的费用; 费用;
Project/ 29. 链式铺
IP 装百分之
五十没有
边界,设计
初期采用
的油漆反
射比为多
少,后来改
成了多少,
结果节约
了电能,属
于集成设
计;
Project/ 6. IP里面 Q: A building owner and primary project team have convened for a goal-setting workshop This level of detail would not come out of the initial goal-
IP 各种会议 Which factors are examples of what would NOT be determined in the workshop? setting workshop. It would be addressed as a possible
什么的也 A: The lighting needs of certain workspaces. energy strategy.
是要看的, Q: In an initial goal-setting workshop, which action would occur?
考了两三 A: Engagementoftheownerandprimaryprojectteam