Rivoningo Safety Consultants Safety Management System Legal Compliance Site Safety File Legal Compliance Audit
Rivoningo Safety Consultants Safety Management System Legal Compliance Site Safety File Legal Compliance Audit
1. CR 10 ( 2 )(a) Risk Assessment & method to address all risks X No Fall protection
identified management in place
2. CR 10 ( 2 )(b) The process for evaluation of employees’ X None on file
physical & psychological fitness
3. CR 10 ( 2 )( c) Training program X None on file
4. CR 10 ( 3 ) Inspection, testing & maintenance procedure for X None on File
all the fall protection equipment
5. CR8 (1)b A competed fall protection plan signed by the X None in file
appointed person
6 References CERTIFICATION OF MEDICAL FITNESS Yes No N/A Remarks
POINTS ACHIEVED = 0 / 5 TOTAL 0 %
1. CR 8 & 21 Evaluation of physical fitness of persons by a X No medical evaluations
registered Medical Practitioner (certificate-Pre done
and post)
2. Job profiles for each employee/ Man-job X
specifications
3. Training & Certificates of competence - job X
specific
4. C.R.21(1)(d)(i) Medical certificate of fitness to operate X
construction vehicle & mobile plant
5. Work permits - area and/or control permit X
7 References PLANNED MAINTENANCE INSPECTION, Yes No N/A Remarks
REGISTERED RECORDS (CHECKLISTS
AND REGISTERS)
POINTS ACHIEVED = 0 / 13 TOTAL 0%
1. X No registers or checklists on
Daily toolbox talks register file
2. GAR 9 Reportable incidents and accidents (APPENDIX X No registers or checklists on
file
2 register) & WCL forms
3. PER (6)2c Pressure equipment and fire equipment register X No registers or checklists on
file
and checklist
4. GSR 3 ( 4 ) First Aid equipment register and checklist X No registers or checklists on
file
5. CR 21( 1 ) ( j) Construction vehicle & mobile plant inspection X No registers or checklists on
file
6. GSR 2 Personal protective equipment X No registers or checklists on
file
7. HCS (Anne 8) Alphabetical list of all HCS’s used and 16 point X No registers or checklists on
file
MSDS’s
8. Tools/equipment Checklist and register X No registers or checklists on
file
9. Facilities inspection checklist X No registers or checklists on
file
10. CR 8 ( 2 )( d) Inspection, testing and maintenance of fall X No registers or checklists on
file
protection equipment
11. DMR 18 ( 5 ) Lifting machines and lifting tackle X No registers or checklists on
file
12. EMR 9 Portable electrical equipment X No registers or checklists on
file
13. EMR 10 Portable electrical lights X No registers or checklists on
file
1. CR 23( 1 ) (k) Construction vehicle & mobile plant inspection X None on file
2. CR 24 ( d ) Temporary electrical installation inspection register X None on file
3. HCS 9A Alphabetical list of all HCS’s used and 16 point X Copy of MSDS on file
MSDS’s
4. CR17 (12)( c) Training records (Signatures) X None on file
5. CR 12( f ) Record of inspections of temporary work X N/A
6. CR 13( 2 )( h) Record of inspection of excavation, bracing & X None on file
shoring
7. CR 14 ( 2 ) Method statement for demolishing a structure X N/A
8. CR 14( 11 ) Method statement for use of explosives X N/A
9. CR 17( 2 )( b) Certificate of system design for suspended platform X N/A
10. CR 17( 2 )( c) Operational compliance plan X N/A
11. CR 17( 10 ) Competencies of erectors, operators & inspectors X N/A
12. CR19 ( 8 )(C) Inspection results of materials hoist X N/A
13. CR 20 (8) Record of repairs / maintenance to a batch plant X N/A
14. CR21(2)(g)(ii) Register of nails & studs (explosive powered tool) X N/A
9 References GENERAL REQUIREMENTS Yes No N/A Remarks
POINTS ACHIEVED = 0 / 3 TOTAL 0%
1. Sect 8 Toolbox talk Manual X None on file
2. CR 9 PTO /DSTI X None on file
3. Section 8 Copies of I.D and Personal Information X None on file
REMARKS
1. There is no Risk Management Plan/Procedure in place and the Task Risk Assessment not all Risks Identified for the project.
2. No Proper Fall Protection plan drafted by a Fall Protection Planner.
3. No training program in place and no records of induction and competence training.
4. No registers and checklists or evidence of inspections done.
5. The Legal Appointments are on file but not signed.
6. There are no method statements on file and safe work procedures do not correlate with Risk Assessments for each task.
7. There are no records for medical evaluations for the project.
8. Most of the documents on file not signed by Section 16(2) appointee.
9. The OHS Policy not signed by CEO and
RECOMMENDATIONS/CORRECTIVE ACTIONS
Document Number
Rivoningo Safety Consultants RSC/SMS/LCA/SSFLCA/001
Revision Number
Safety Management System 00
Legal Compliance Page Number
Site Safety File Legal Compliance Audit Page 5 of 5
1. Contractor to Draft/Develop a Risk Management Procedure and ensure proper Risk Assessment for all tasks on site.
2. Develop a proper Fall Protection Plan by a registered and competent Fall Protection Planner
3. Ensure that the Section 16 (2) and CEO sign all documentation on file that needs to be signed.
4. Ensure all Legal Appointments are done and signed by both parties
5. Develop registers and checklists and ensure they are placed on file.
6. Ensure Notification of Construction work is done and sent to Department of labour.
7. Ensure Task Risk Assessments, Method Statements and Safe Work Procedures are talking the same language.
8. Ensure medical evaluations are done and medical fitness certificates are placed on file.
9. Ensure induction takes place and ID Copies and personal information placed on file.