LEGEND
UP
UP
UP
UP
RAMP UP RAMP UP
UP
UP
UP
UP
8 10
UP
6
10
A B C D
8.2 24.94 6.27
8
11 9 12
3 1
8 8 5 1
8 5 11 1
5 3 3
8 11
3 8
5 11 11 11 11
6
1.53
8 11
5 5
11 11 6 2 UP
11
9 3
2 6
2
10 12
8 12 3
4.17
RAMP UP 4 9
10 5 11 5 5
5 11 5 11 5 11 6 3 4
5 11
UP
11 5 11 11 10
11 5
1 12
UP
12
UP
12 12 12 12 12 12
7 6
7 7 7 7 7 7
12 7
7 7 7 12 7 12 7 12 7 7
UP
12 12 12 7 12 12 12
39.37
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVAL: SET NO. SHEET NO.
(REVISED PLAN)
NEW BIG FOUR J CONSTRUCTION INC. CONSTRUCTION / REPAIR / REHABILITATION /
ENGINEERS · BUILDERS · CONTRACTORS IMPROVEMENT OF VARIOUS INFRASTRUCTURE
INCLUDING LOCAL PROJECTS REPUBLIC OF THE PHILIPPINES
ENGR. JAIME CRUZ PASIG RIVER ESPLANADE FROM AYALA BRIDGE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS EDMUNDO C. BANIQUED EDWIN M. LUZON LYDIA G. CHUA JUBY B. CORDON, CEO NOMER ABEL P. CANLAS
PRESIDENT TO JONES BRIDGE ALONG PASIG RIVERWAYS NATIONAL CAPITAL REGION PROJECT ENGINEER CHIEF, IMPLEMENTING DIV. CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DATE: MANILA 2ND STREET, PORT AREA MANILA DATE: DATE: DATE: DATE: DATE: