1. Provide the area covered and capacities of each of the Project Components:
Areas (ha) or
Project Components Specifications Capacities (m3)
UG Mine Area (APSA No. 000409-III within ZMCR-Lower Western Orebody)
L-30
L-40
L-50
L-60
L-70
L-80
L-90
L-100
L-110
L-120
L-130
L-140
L-150
L-160
L-170
L-180
L-190
L-200
L-210
L-220
L-230
L-240
Shafts
Ventilation System
Drainage System
UG Mine Facilities
Field Office
Workshop
Air Compressor Building
Generators Building
Hoist Room Building
Sand Cement Plant
Explosive Magazines
Tramline
ZMCR Loading Station
Haul Roads
Access Roads
Mill/Processing Plant
Washing & Heavy Media Separation Facilities
o Receiving Bin
High Silica
Areas (ha) or
Project Components Specifications Capacities (m3)
Low Silica
Backup
o Grizzly Screen 8” openings
o Primary Ore Bin
o Scalp Screen 4’ x 8’, 2.75” round
openings
o Double-Deck Vibrating Screen 4’ x 10’, 2 ¾” openings
(upper), 5/16” openings
(lower)
o Akins Classifier
o Storage Bin 1,000-ton cap.
o Jaw Crusher 10” x 20”
o Symons Cone 3’
o Gyradisc 48
o SD Symons 2’
o Short Head Symons 2’
o Classifier 2 units of ???
o Magnetic Separator
Fine Plant Facilities
o Vibrating Screens Classifier 4’ x 8’
o Vibrating Screens Classifier Cyclone 36”
o Cyclones 3 units of 24”
o Yuda Jig Reichert Spiral ???
o Humprey Spiral ???
o Product Storage Bins
Field Office
Workshop
Assay Laboratory
Scale House
Air Compressor
Administration Building
Warehouse
Accounting Office
Personnel Office
Mechanical/Electrical Office/Shop
Motorpool
Carpentry Shop
Fabrication Shop
Core House
Airstrip 1,400 m
Helipad
Campsite
Coto Camp Residential Areas
Staff House
Staff Mess
Hospital
Towers
Areas (ha) or
Project Components Specifications Capacities (m3)
o 1
o 2
o 3
o 4
o 5
o 6
o 7
o 8
o 9
Elementary Schools
Coto High School Annex
Recreational Facilities
o Kidz Swimming Pool/Cottages
o Playground
o Basketball Courts
Utilities
Power Source
o ZAMECO
o AES Masinloc Power Plant
o Substation
o Generator Set 2.5 MW
o Komatsu Ltd Japan M#SAGD170-A-1 2 units
Water Source
o South Lawis River & Creeks Flume Line for
domestic use &
Mill Plant Water
Storage Tank for
industrial use
o Reservoir
Pollution Control Structures/ Facilities & Devices
Tailings Pond - 3
Tailings Pond - 4
Waste Dump
Materials Recovery Facility
Hazardous Waste Storage Facility
Oil-Water Separators
Nursery
Siltation Ponds (include geo-coordinates)
Improve Figure 1-6 to A3-size to show the above-mentioned project components, as well as the open
pit mining areas (ZMCR and Coto sides).
The mill flowsheet in Figure 1-14 needs improvement to show all equipment, such as storage bins,
vibrating screens, and ball mill. It should conform to the description of the milling process (Sec.
1.5.2, pp. 1-33 – 6).
2. Locate in an A3-sized Map the following 17 known Orebodies and provide the Measured and
Indicated Mineral Resources and Total Ore Reserves for each of the Orebodies:
Mineral Resources Total Ore
Orebodies Measured Indicated Reserves %Cr2O3 %SiO2 Status
a. Coto Side: (no operation)
i. Coto Lower Layer;
ii. G-Layer;
iii. Harding;
iv. Hayden;
v. Murphy;
vi. 587;
vii. 787;
viii. 815;
ix. 909;
x. Upper 1111;
xi. Lower 1111;
xii. 1124;
xiii. Coral; &
xiv. Wood.
b. ZMCR side:
i. Eastern;
ii. Western; &
iii. Lower Western.
c. Various satellite orebodies:
(for assessment)
i. Buntak Mines;
ii. Baltap Mines;
iii. Calot Group of Claims; &
iv. Masanay Group of Claims
TOTAL
Pursuant to MGB Memorandum Circular No. 20-010, dated 17 November 2020, the economic
geology report required under DAO No. 2003-30 should be based on the Final Exploration Report
(FER) duly signed by a Competent Geologist or Mining Engineer. Accordingly, submit an FER duly
signed by a Competent Geologist or Mining Engineer.
REYNALDO R. ZABALA
21 November 2022