NO DESCRIPTION Q RATE UNIT AMOUNT


TY

1 Material cost as per list enclosed A/U

Labour charges:clamp fixing,pipe laying,ball valve fixing and welding


2 LENGTH
work,other works included

road cutting : gate area and car parking area: earth work :approximate
3 1 ft width and depth : 12 to 15 inches. After laying pipe - rcc work - RFT
approx:20rft-road cutting(machineries,materials and labour)

4 manual 1 no +Lid(newely to be constructed) NO

5 w.c policy for this work LS

TOTAL AMOUNT

CGST 9%

SGST 9%

N ET AMOUNT
S.NO DESCRIPTION Q RATE UNIT
TY

MATERIAL LIST

SI.NO DESCRIPTION QTY RATE UNIT

1 2" UPVC PIPE 624 300 MTR

2 2"UPVC TEE 8 125 NO

3 2" UPVC ELBOW 24 90 NO

4 2" UPVC SHOE 45° 12 105 NO

5 2" UPVC UNION 6 325 NO

6 2" UPVC COUPLING 90 55 NO

7 2" UPVC MTA 4 65 NO

8 2"*3/4"UPVC TEE 36 150 NO

9 3/4" UPVC ELBOW 36 20 NO

10 3/4" UPVC BALL VALVE 36 160 NO

11 2" UPVC DUMMY 5 65 NO

12 3/4" GI HOSE COLLAR 36 50 NO

13 118ML UPVC SOLUTION 10 130 NO

14 2" UPVC THERADED CLAMP 215 15 NO

15 FILTER 1 3000 NO

16 GI BUTTER FLY VALVE 3 3000 NO

17 3/4" UPVC PIPE 18 80 RM

18 CLAMP SUPPORT 50*50*6 L ANGLE SUPPORT 130 300 NO

19 THREAD BALL 12 7 NO

20 CHELLAC 12 25 NO

21 HACKSHAW BLADE 12 12 NO

22 6" CHANNEL CLAMP 20 150 NO

23 CHANNEL HOSE 240 50 NO

24 ANCHOR BOLT 2" 48 20 NOS

25 3" UPVC PIPE 3 600 MTR

26 3" UPVC MTA 1 165 NO

27 3" UPVC ELBOW 1 235 NO

28 3"*2" UPVC REDUCER 1 305 NO

29 2" UPVC BALLVALVE 3 1385 NO

30 3" UPVC BALLVALVE 1 9990 NO

31 6" PIPE(6KG) 6 900 MTR

32 TRANSPORT 1 4000 LS

33 MISCELLANEOUS MATERIAL 1 10000 LS

TOTAL AMOUNT