Loading :-
i) Self Wt. of Beam W1 = 0.3 x 0.45 x 25 = 3.38 KN/m
ii) Load from Monorail W2 = = 13.58 KN
39.16 x 10^6
Depth of Beam = = 181.06 mm
3.98 X 300
Reinforcement Required :-
0.5 x 30 4.6 x 6.42 x 10^6
1- 1- x 1000 x 412
500 30 x 1000 x 412^2
2
= 35.87 mm
2
Ast min. = 0.17% x b x d = 210.12 mm
Reinforcement Provided :-
2
At Bottom :- Provide # 16 - 2 nos Throughout = 402.12 mm
2
+ # 12 - 1 nos Throughout = 113.10 mm
2
Total Steel Provided = 515.22 mm
2
At Bottom :- Provide # 16 - 2 nos Throughout = 402.12 mm
2
+ # 12 - 1 nos Throughout = 113.10 mm
2
Total Steel Provided = 515.22 mm
Check for Shear :-
MaxiMum S.F. Vu = 20.16 KN
Shear Stress tv = 0.163 N/mm2
Pt% = 0.325 %
2
Shear Stress taken by Concrete (tc) From IS-456, Table-19 = 0.41 N/mm
tv < tc Hence Shear Reinf. Not Required
Provide Stirrups # 8 @ 150 c/c