Machine Name & No
DAILY PREVENTIVE MAINTENANCE CHECK LIST
Facility/Location:
MONTH
CHECK ITEMS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Check the oil level of centralized
lubrication uint and hydraulic Unit
Check the secure mounting of the cutters
Before Power On
and the holders on ATC
Checking the turning spindle
Check oil level of chiller unit, Check the
all coolant levels
Check the oil leakage of the machine
periphery
Check the smooth working of chuck,i.e
clamping and declamping
After power on
Check tailstock sleeve for smooth
forward/backward movement
Check the lubricating parts for
appropriate [Link] pressure of
lubrication and hydraulic unit.
X & Z Axis Movement Checking
Remove chips from the inside of the
machine, Arranging the machine
periphery in order ,cleaning the machine
After Operation
and its periphery
Cleaning and greasing the chuck,Cleanig
and checking the
TOOL EYE
Visual checking of all air filter,clean all air
filter
CHECKEDBY
ROCKPECKER-QMS-F49-B
[Link] 00 , [Link] 01.08.2018