You are on page 1of 1

DATE DECEMBER 2, 2022

SUBJECT: ADDITIONAL DORMITORY BESIDE DORM 1 ESTIMATES OF MATERIALS


LOCATION DAVAO CITY JAIL ANNEX

ITEM NO. DESCRIPTION OF ITEMS QUANTITIES UNIT UNIT COST AMOUNT

1 C-Purlins 2 x4 10 pcs 750 7,500.00


2 GI Corrugated Sheets 4 x 10 ft 12 pc 650 7,800.00
3 Angle Bar 3/16 x 1 1/2 x 1 1/2 10 pcs 710 7,100.00
4 Plain sheet ( for flashing) 4x 8 2 PCS 550 1,100.00
5 steel matting (wire mesh) 20 PCS 580 11,600.00
6 plywood 1/4 x 4 x 8 12 pcs 515 1,030.00
7 Metal Studs 2x3 15 pcs 400 6,000.00
8 Red Oxide (primer) 2 Gallons 615 1,230.00
9 Welding Rod 5 kilos 175 875.00
10 Cutting disc for metal 25 pcs 35 875.00
11 Cement 30 bags 230 6,900.00
12 Flat Latex Paint 5 gallon 700 3,500.00
13 Paint Brush 4 inches 2 pcs 80 160.00
14 Roller Brush 2 pcs 120 240.00
15 Paint thinner 1 Gallon 650 650.00
16 Hollow Blocks no.4 200 pcs 16 3,200.00
TOTAL 59,760.00

Prepared by:

ASHLEY A ALVERO

Noted bY:

JSINSP RIENZON ROULLO


DCJ Annex Warden