SUBMISSION DATE:01-01-2023 DAILY REPORT MONTH OF

BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 376.868 379.462 1000
LT Room Feeder DG 5878.640 5878.640 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8210.300 8212.895 1000
AC Panel 3147.587 3148.855 1000
Power Panel 24.759 24.765 1000
Lighting Panel 137.248 137.264 1000
W/S UPS Panel- 20 KVA UPS 93.310 93.329 1000
Lab & Server Panel - 200 KVA UPS 4592.586 4594.056 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 02-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2594
0
2594

ALCATEL FEEDERS
KWH Units Remarks
2595
1268
6
16
19
1470
2779

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 02-01-2023

Completed date
Completed date
SUBMISSION DATE:02-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 379.462 381.929 1000
LT Room Feeder DG 5878.640 5906.746 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8212.895 8215.352 1000
AC Panel 3148.855 3149.901 1000
Power Panel 24.765 24.775 1000
Lighting Panel 137.264 137.307 1000
W/S UPS Panel- 20 KVA UPS 93.329 93.358 1000
Lab & Server Panel - 200 KVA UPS 4594.056 4595.462 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 03-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2467
28
2495

ALCATEL FEEDERS
KWH Units Remarks
2457
1046
10
43
29
1406
2534

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 03-01-2023

Completed date
Completed date
SUBMISSION DATE:03-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 381.929 384.455 1000
LT Room Feeder DG 5906.746 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8215.352 8217.897 1000
AC Panel 3149.901 3150.996 1000
Power Panel 24.775 24.786 1000
Lighting Panel 137.307 137.349 1000
W/S UPS Panel- 20 KVA UPS 93.358 93.391 1000
Lab & Server Panel - 200 KVA UPS 4595.462 4596.938 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 04-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2526
34
2560

ALCATEL FEEDERS
KWH Units Remarks
2545
1095
11
42
33
1476
2657

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 04-01-2023

Completed date
Completed date
REPORT DATE:04-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 384.455 386.958 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8217.897 8220.381 1000
AC Panel 3150.996 3152.019 1000
Power Panel 24.786 24.798 1000
Lighting Panel 137.349 137.395 1000
W/S UPS Panel- 20 KVA UPS 93.391 93.422 1000
Lab & Server Panel - 200 KVA UPS 4596.938 4598.392 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 05-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2503
0
2503

ALCATEL FEEDERS
KWH Units Remarks
2484
1023
12
46
31
1454
2566

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 05-01-2023

Completed date
Completed date
SUBMISSION DATE:05-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 386.958 389.500 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8220.381 8222.906 1000
AC Panel 3152.019 3153.093 1000
Power Panel 24.798 24.810 1000
Lighting Panel 137.395 137.440 1000
W/S UPS Panel- 20 KVA UPS 93.422 93.454 1000
Lab & Server Panel - 200 KVA UPS 4598.392 4599.855 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 06-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2542
0
2542

ALCATEL FEEDERS
KWH Units Remarks
2525
1074
12
45
32
1463
2626

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 06-01-2023

Completed date
Completed date
SUBMISSION DATE:06-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 389.500 392.083 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8222.906 8225.466 1000
AC Panel 3153.093 3154.151 1000
Power Panel 24.810 24.821 1000
Lighting Panel 137.440 137.487 1000
W/S UPS Panel- 20 KVA UPS 93.454 93.486 1000
Lab & Server Panel - 200 KVA UPS 4599.855 4601.349 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 07-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2583
0
2583

ALCATEL FEEDERS
KWH Units Remarks
2560
1058
11
47
32
1494
2642

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 07-01-2023

Completed date
Completed date
SUBMISSION DATE:07-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 392.083 394.660 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8225.466 8228.022 1000
AC Panel 3154.151 3155.271 1000
Power Panel 24.821 24.828 1000
Lighting Panel 137.487 137.509 1000
W/S UPS Panel- 20 KVA UPS 93.486 93.508 1000
Lab & Server Panel - 200 KVA UPS 4601.349 4602.815 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
Fire alarm system test weekly pm work done
Public address system weekly pm work done
Panic bar weekly pm work done
Fire alarm system test weekly pm work done
CCTV system weekly pm work done
Access control system weekly pm work done
Ahu weekly pm work done
Vfd panel weekly pm work done
Split ac #01 weekly pm work done
Split ac #02 weekly pm work done
Dx chu #03 weekly pm work done
Dx chu #04 weekly pm work done
Csu #05 weekly pm work done
Csu #06 weekly pm work done
Csu #07 weekly pm work done
Ldb #1 weekly pm work done
Ldb#2 weekly pm work done
Carpentry weekly pm work done
Lighting weekly pm work done
sub panel weekly pm work done
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 08-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2577
0
2577

ALCATEL FEEDERS
KWH Units Remarks
2556
1120
7
22
22
1466
2637

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 08-01-2023

Completed date
Completed date
SUBMISSION DATE:08-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 394.660 397.187 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8228.022 8230.535 1000
AC Panel 3155.271 3156.328 1000
Power Panel 24.828 24.835 1000
Lighting Panel 137.509 137.528 1000
W/S UPS Panel- 20 KVA UPS 93.508 93.529 1000
Lab & Server Panel - 200 KVA UPS 4602.815 4604.280 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 09-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2527
0
2527

ALCATEL FEEDERS
KWH Units Remarks
2513
1057
7
19
21
1465
2569

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 09-01-2023

Completed date
Completed date
REPORT DATE:09-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 397.187 399.770 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8230.101 8233.101 1000
AC Panel 3156.328 3157.373 1000
Power Panel 24.835 24.846 1000
Lighting Panel 137.528 137.578 1000
W/S UPS Panel- 20 KVA UPS 93.529 93.564 1000
Lab & Server Panel - 200 KVA UPS 4604.280 4605.738 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 10-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2583
0
2583

ALCATEL FEEDERS
KWH Units Remarks
3000
1045
11
50
35
1458
2599

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 10-01-2023

Completed date
Completed date
REPORT DATE:10-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 399.770 402.465 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8233.101 8235.773 1000
AC Panel 3157.373 3158.494 1000
Power Panel 24.846 24.853 1000
Lighting Panel 137.578 137.639 1000
W/S UPS Panel- 20 KVA UPS 93.564 93.600 1000
Lab & Server Panel - 200 KVA UPS 4605.738 4607.225 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 11-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2695
0
2695

ALCATEL FEEDERS
KWH Units Remarks
2672
1121
7
61
36
1487
2712

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 11-01-2023

Completed date
Completed date
REPORT DATE:11-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 402.465 405.113 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8235.773 8238.403 1000
AC Panel 3158.494 3159.566 1000
Power Panel 24.853 24.861 1000
Lighting Panel 137.639 137.684 1000
W/S UPS Panel- 20 KVA UPS 93.600 93.633 1000
Lab & Server Panel - 200 KVA UPS 4607.225 4608.805 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 12-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2648
0
2648

ALCATEL FEEDERS
KWH Units Remarks
2630
1072
8
45
33
1580
2738

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 12-01-2023

Completed date
Completed date
REPORT DATE:12-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 405.113 407.876 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8238.403 8241.138 1000
AC Panel 3159.566 3160.795 1000
Power Panel 24.861 24.868 1000
Lighting Panel 137.684 137.733 1000
W/S UPS Panel- 20 KVA UPS 93.633 93.667 1000
Lab & Server Panel - 200 KVA UPS 4608.805 4610.364 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 13-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2763
0
2763

ALCATEL FEEDERS
KWH Units Remarks
2735
1229
7
49
34
1559
2878

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 13-01-2023

Completed date
Completed date
REPORT DATE:13-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 407.876 410.665 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8241.138 8243.905 1000
AC Panel 3160.795 3162.012 1000
Power Panel 24.868 24.876 1000
Lighting Panel 137.733 137.778 1000
W/S UPS Panel- 20 KVA UPS 93.667 93.698 1000
Lab & Server Panel - 200 KVA UPS 4610.364 4611.946 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 14-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2789
0
2789

ALCATEL FEEDERS
KWH Units Remarks
2767
1217
8
45
31
1582
2883

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 14-01-2023

Completed date
Completed date
REPORT DATE:14-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 410.665 413.352 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8243.905 8246.560 1000
AC Panel 3162.012 3163.104 1000
Power Panel 24.876 24.879 1000
Lighting Panel 137.778 137.793 1000
W/S UPS Panel- 20 KVA UPS 93.698 93.719 1000
Lab & Server Panel - 200 KVA UPS 4611.946 4613.547 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
Fire alarm system test weekly pm work done
Public address system weekly pm work done
Panic bar weekly pm work done
Fire alarm system test weekly pm work done
CCTV system weekly pm work done
Access control system weekly pm work done
Carpentry weekly pm work done
Lighting weekly pm work done
Exhust fan 1,2,&3
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 15-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2687
0
2687

ALCATEL FEEDERS
KWH Units Remarks
2655
1092
3
15
21
1601
2732

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 15-01-2023

Completed date
Completed date
REPORT DATE:15-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 413.352 416.112 1000
LT Room Feeder DG 5940.882 5940.882 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8246.560 8249.318 1000
AC Panel 3163.104 3164.275 1000
Power Panel 24.879 24.882 1000
Lighting Panel 137.793 137.826 1000
W/S UPS Panel- 20 KVA UPS 93.719 93.740 1000
Lab & Server Panel - 200 KVA UPS 4613.547 4615.180 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 16-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2760
0
2760

ALCATEL FEEDERS
KWH Units Remarks
2758
1171
3
33
21
1633
2861

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 16-01-2023

Completed date
Completed date
REPORT DATE:16-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 416.112 418.905 1000
LT Room Feeder DG 5940.882 5985.080 1
Total Power Consumption

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8249.318 8252.136 1000
AC Panel 3164.275 3165.547 1000
Power Panel 24.882 24.890 1000
Lighting Panel 137.826 137.871 1000
W/S UPS Panel- 20 KVA UPS 93.740 93.772 1000
Lab & Server Panel - 200 KVA UPS 4615.180 4616.764 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 17-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2793
44
2837

ALCATEL FEEDERS
KWH Units Remarks
2818
1272
8
45
32
1584
2941

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 17-01-2023

Completed date
Completed date
REPORT DATE:17-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 418.905 421.739 1000
LT Room Feeder DG 5985.080 5985.080 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8252.136 8254.948 1000
AC Panel 3165.547 3166.795 1000
Power Panel 24.890 24.900 1000
Lighting Panel 137.871 137.921 1000
W/S UPS Panel- 20 KVA UPS 93.772 93.808 1000
Lab & Server Panel - 200 KVA UPS 4616.764 4618.350 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 18-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2834
0
2834

ALCATEL FEEDERS
KWH Units Remarks
2812
1248
10
50
36
1586
2930

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 18-01-2023

Completed date
Completed date
REPORT DATE:18-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 421.739 424.580 1000
LT Room Feeder DG 5985.080 5985.080 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8254.948 8257.656 1000
AC Panel 3166.795 3168.072 1000
Power Panel 24.900 24.908 1000
Lighting Panel 137.921 137.970 1000
W/S UPS Panel- 20 KVA UPS 93.808 93.843 1000
Lab & Server Panel - 200 KVA UPS 4618.350 4619.966 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 19-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2841
0
2841

ALCATEL FEEDERS
KWH Units Remarks
2708
1277
8
49
35
1616
2985

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 19-01-2023

Completed date
Completed date
REPORT DATE:19-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 424.580 427.423 1000
LT Room Feeder DG 5985.080 5985.080 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8257.656 8260.597 1000
AC Panel 3168.072 3169.238 1000
Power Panel 24.908 24.917 1000
Lighting Panel 137.970 138.021 1000
W/S UPS Panel- 20 KVA UPS 93.843 93.876 1000
Lab & Server Panel - 200 KVA UPS 4619.966 4621.573 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 20-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2843
0
2843

ALCATEL FEEDERS
KWH Units Remarks
2941
1166
9
51
33
1607
2866

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 20-01-2023

Completed date
Completed date
REPORT DATE:20-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 427.423 430.169 1000
LT Room Feeder DG 5985.080 5985.080 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8260.597 8263.324 1000
AC Panel 3169.238 3170.376 1000
Power Panel 24.917 24.926 1000
Lighting Panel 138.021 138.072 1000
W/S UPS Panel- 20 KVA UPS 93.876 93.910 1000
Lab & Server Panel - 200 KVA UPS 4621.573 4623.166 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 21-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2746
0
2746

ALCATEL FEEDERS
KWH Units Remarks
2727
1138
9
51
34
1593
2825

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 21-01-2023

Completed date
Completed date
REPORT DATE:21-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 430.169 432.941 1000
LT Room Feeder DG 5985.080 6017.258 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8263.324 8266.103 1000
AC Panel 3170.376 3171.623 1000
Power Panel 24.926 24.930 1000
Lighting Panel 138.072 138.093 1000
W/S UPS Panel- 20 KVA UPS 93.910 93.931 1000
Lab & Server Panel - 200 KVA UPS 4623.166 4624.772 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
Fire alarm system test weekly pm work done
Public address system weekly pm work done
Panic bar weekly pm work done
Fire alarm system test weekly pm work done
CCTV system weekly pm work done
Access control system weekly pm work done
Carpentry weekly pm work done
Lighting weekly pm work done
Exhust fan 1,2,&3
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 22-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2772
32
2804

ALCATEL FEEDERS
KWH Units Remarks
2779
1247
4
21
21
1606
2899

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 22-01-2023

Completed date
Completed date
REPORT DATE:22-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 432.941 435.737 1000
LT Room Feeder DG 6017.258 6017.258 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8266.103 8268.880 1000
AC Panel 3171.623 3172.849 1000
Power Panel 24.930 24.932 1000
Lighting Panel 138.093 138.111 1000
W/S UPS Panel- 20 KVA UPS 93.931 93.949 1000
Lab & Server Panel - 200 KVA UPS 4624.772 4626.391 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 23-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2796
0
2796

ALCATEL FEEDERS
KWH Units Remarks
2777
1226
2
18
18
1619
2883

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 23-01-2023

Completed date
Completed date
REPORT DATE:23-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 435.737 438.582 1000
LT Room Feeder DG 6017.258 6017.258 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8268.880 8271.708 1000
AC Panel 3172.849 3174.031 1000
Power Panel 24.932 24.941 1000
Lighting Panel 138.111 138.162 1000
W/S UPS Panel- 20 KVA UPS 93.949 93.983 1000
Lab & Server Panel - 200 KVA UPS 4626.391 4628.037 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 24-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2845
0
2845

ALCATEL FEEDERS
KWH Units Remarks
2828
1182
9
51
34
1646
2922

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 24-01-2023

Completed date
Completed date
REPORT DATE:24-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 438.582 441.167 1000
LT Room Feeder DG 6017.258 6298.566 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8271.708 8274.556 1000
AC Panel 3174.031 3175.268 1000
Power Panel 24.941 24.949 1000
Lighting Panel 138.162 138.210 1000
W/S UPS Panel- 20 KVA UPS 93.983 94.017 1000
Lab & Server Panel - 200 KVA UPS 4628.037 4629.663 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 25-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2585
281
2866

ALCATEL FEEDERS
KWH Units Remarks
2848
1237
8
48
34
1626
2953

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 25-01-2023

Completed date
Completed date
REPORT DATE:25-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 441.167 444.127 1000
LT Room Feeder DG 6298.566 6298.566 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8274.556 8277.608 1000
AC Panel 3175.268 3176.630 1000
Power Panel 24.949 24.959 1000
Lighting Panel 138.210 138.267 1000
W/S UPS Panel- 20 KVA UPS 94.017 94.052 1000
Lab & Server Panel - 200 KVA UPS 4629.663 4631.387 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 26-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2960
0
2960

ALCATEL FEEDERS
KWH Units Remarks
3052
1362
10
57
35
1724
3188

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 26-01-2023

Completed date
Completed date
REPORT DATE:26-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 444.127 446.857 1000
LT Room Feeder DG 6298.566 6298.566 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8277.608 8280.204 1000
AC Panel 3176.630 3177.782 1000
Power Panel 24.959 24.962 1000
Lighting Panel 138.267 138.288 1000
W/S UPS Panel- 20 KVA UPS 94.052 94.072 1000
Lab & Server Panel - 200 KVA UPS 4631.387 4632.882 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 27-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2730
0
2730

ALCATEL FEEDERS
KWH Units Remarks
2596
1152
3
21
20
1495
2691

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 27-01-2023

Completed date
Completed date
REPORT DATE:27-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 446.857 449.357 1000
LT Room Feeder DG 6298.566 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8280.204 8283.025 1000
AC Panel 3177.782 3179.011 1000
Power Panel 24.962 24.971 1000
Lighting Panel 138.288 138.331 1000
W/S UPS Panel- 20 KVA UPS 94.072 94.104 1000
Lab & Server Panel - 200 KVA UPS 4632.882 4634.506 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 28-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2500
352
2852

ALCATEL FEEDERS
KWH Units Remarks
2821
1229
9
43
32
1624
2937

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 28-01-2023

Completed date
Completed date
REPORT DATE:28-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 449.357 452.158 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8283.025 8285.823 1000
AC Panel 3179.011 3180.265 1000
Power Panel 24.971 24.974 1000
Lighting Panel 138.331 138.351 1000
W/S UPS Panel- 20 KVA UPS 94.104 94.124 1000
Lab & Server Panel - 200 KVA UPS 4634.506 4636.140 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
Fire alarm system test weekly pm work done
Public address system weekly pm work done
Panic bar weekly pm work done
Fire alarm system test weekly pm work done
CCTV system weekly pm work done
Access control system weekly pm work done
Carpentry weekly pm work done
Lighting weekly pm work done
LDB,RPDB PM done.
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 29-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2801
0
2801

ALCATEL FEEDERS
KWH Units Remarks
2798
1254
3
20
20
1634
2931

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 29-01-2023

Completed date
Completed date
REPORT DATE:29-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 452.158 454.927 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8285.823 8288.580 1000
AC Panel 3180.265 3181.511 1000
Power Panel 24.974 24.977 1000
Lighting Panel 138.351 138.365 1000
W/S UPS Panel- 20 KVA UPS 94.124 94.144 1000
Lab & Server Panel - 200 KVA UPS 4636.140 4637.741 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 30-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2769
0
2769

ALCATEL FEEDERS
KWH Units Remarks
2757
1246
3
14
20
1601
2884

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 30-01-2023

Completed date
Completed date
REPORT DATE:30-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 454.927 457.820 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8288.580 8291.421 1000
AC Panel 3181.511 3182.723 1000
Power Panel 24.977 24.987 1000
Lighting Panel 138.365 138.423 1000
W/S UPS Panel- 20 KVA UPS 94.144 94.186 1000
Lab & Server Panel - 200 KVA UPS 4637.741 4639.378 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 31-01-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2893
0
2893

ALCATEL FEEDERS
KWH Units Remarks
2841
1212
10
58
42
1637
2959

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 31-01-2023

Completed date
Completed date
REPORT DATE:31-01-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 457.820 460.608 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8291.421 8294.202 1000
AC Panel 3182.723 3183.912 1000
Power Panel 24.987 24.996 1000
Lighting Panel 138.488 138.488 1000
W/S UPS Panel- 20 KVA UPS 94.186 94.217 1000
Lab & Server Panel - 200 KVA UPS 4639.378 4640.974 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
EPORT MONTH OFJANUARY-2023 SUBMISSION DATE: 01-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2788
0
2788

ALCATEL FEEDERS
KWH Units Remarks
2781
1189
9
0
31
1596
2825

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 01-02-2023

Completed date
Completed date
LT ROOM EB / Brigade LT ROOM
DATE
Opening Closing Consum. Cumulative Opening
1-Jan-2023 376868 379462 2594 2594 5878.640
2-Jan-2023 379462 381929 2467 5061 5878.640
3-Jan-2023 381929 384455 2526 7587 5906.746
4-Jan-2023 384455 386958 2503 10090 5940.882
5-Jan-2023 386958 389500 2542 12632 5940.882
6-Jan-2023 389500 392083 2583 15215 5940.882
7-Jan-2023 392083 394660 2577 17792 5940.882
8-Jan-2023 394660 397187 2527 20319 5940.882
9-Jan-2023 397187 399770 2583 22902 5940.882
10-Jan-2023 399770 402465 2695 25597 5940.882
11-Jan-2023 402465 405113 2648 28245 5940.882
12-Jan-2023 405113 407876 2763 31008 5940.882
13-Jan-2023 407876 410665 2789 33797 5940.882
14-Jan-2023 410665 413352 2687 36484 5940.882
15-Jan-2023 413352 416112 2760 39244 5940.882
16-Jan-2023 416112 418905 2793 42037 5940.882
17-Jan-2023 418905 421739 2834 44871 5985.080
18-Jan-2023 421739 424580 2841 47712 5985.080
19-Jan-2023 424580 427423 2843 50555 5985.080
20-Jan-2023 427423 430169 2746 53301 5985.080
21-Jan-2023 430169 432941 2772 56073 5985.080
22-Jan-2023 432941 435737 2796 58869 6017.258
23-Jan-2023 435737 438582 2845 61714 6017.258
24-Jan-2023 438582 441167 2585 64299 6017.258
25-Jan-2023 441167 444127 2960 67259 6298.566
26-Jan-2023 444127 446857 2730 69989 6298.566
27-Jan-2023 446857 449357 2500 72489 6298.566
28-Jan-2023 449357 452158 2801 75290 6650.553
29-Jan-2023 452158 454927 2769 78059 6650.553
30-Jan-2023 454927 457820 2893 80952 6650.553
31-Jan-2023 457820 460608 2788 83740 6650.553
Total (EB+DG) Units /
LT ROOM DG / Brigade
Brigade Feeder
Closing Consum. Cumulative KWH Units
5878.640 0 0 2594
5906.746 28 28 2495
5940.882 34 62 2560
5940.882 0 62 2503
5940.882 0 62 2542
5940.882 0 62 2583
5940.882 0 62 2577
5940.882 0 62 2527
5940.882 0 62 2583
5940.882 0 62 2695
5940.882 0 62 2648
5940.882 0 62 2763
5940.882 0 62 2789
5940.882 0 62 2687
5940.882 0 62 2760
5985.080 44 106 2837
5985.080 0 106 2834
5985.080 0 106 2841
5985.080 0 106 2843
5985.080 0 106 2746
6017.258 32 139 2804
6017.258 0 139 2796
6017.258 0 139 2845
6298.566 281 420 2866
6298.566 0 420 2960
6298.566 0 420 2730
6650.553 352 772 2852
6650.553 0 772 2801
6650.553 0 772 2769
6650.553 0 772 2893
6650.553 0 772 2788
Diff. b/w Brigade &
Alcatel Main Incomer
Alcatel Feeder
KWH Units Opening Closing Consum. Cumulative
-1 8210.300 8212.895 2595 2595
38 8212.895 8215.352 2457 5052
15 8215.352 8217.897 2545 7597
19 8217.897 8220.381 2484 10081
17 8220.381 8222.906 2525 12606
23 8222.906 8225.466 2560 15166
21 8225.466 8228.022 2556 17722
14 8228.022 8230.535 2513 20235
17 8230.535 8233.101 2566 22801
23 8233.101 8235.773 2672 25473
18 8235.773 8238.403 2630 28103
28 8238.403 8241.138 2735 30838
22 8241.138 8243.905 2767 33605
32 8243.905 8246.560 2655 36260
2 8246.560 8249.318 2758 39018
19 8249.318 8252.136 2818 41836
22 8252.136 8254.948 2812 44648
133 8254.948 8257.656 2708 47356
-98 8257.656 8260.597 2941 50297
19 8260.597 8263.324 2727 53024
25 8263.324 8266.103 2779 55803
19 8266.103 8268.880 2777 58580
17 8268.880 8271.708 2828 61408
18 8271.708 8274.556 2848 64256
-92 8274.556 8277.608 3052 67308
134 8277.608 8280.204 2596 69904
31 8280.204 8283.025 2821 72725
3 8283.025 8285.823 2798 75523
12 8285.823 8288.580 2757 78280
52 8288.580 8291.421 2841 81121
7 8291.421 8294.202 2781 83902
All UPS Transformer
HVAC PANEL
losses
CONSUMPTION Opening Closing Consum. Cumulative
-184 3147.587 3148.855 1268 1268
-77 3148.855 3149.901 1046 2314
-112 3149.901 3150.996 1095 3409
-82 3150.996 3152.019 1023 4432
-101 3152.019 3153.093 1074 5506
-82 3153.093 3154.151 1058 6564
-81 3154.151 3155.271 1120 7684
-56 3155.271 3156.328 1057 8741
-33 3156.328 3157.373 1045 9786
-40 3157.373 3158.494 1121 10907
-108 3158.494 3159.566 1072 11979
-143 3159.566 3160.795 1229 13208
-116 3160.795 3162.012 1217 14425
-77 3162.012 3163.104 1092 15517
-103 3163.104 3164.275 1171 16688
-123 3164.275 3165.547 1272 17960
-118 3165.547 3166.795 1248 19208
-277 3166.795 3168.072 1277 20485
75 3168.072 3169.238 1166 21651
-98 3169.238 3170.376 1138 22789
-120 3170.376 3171.623 1247 24036
-106 3171.623 3172.849 1226 25262
-94 3172.849 3174.031 1182 26444
-105 3174.031 3175.268 1237 27681
-136 3175.268 3176.630 1362 29043
-95 3176.630 3177.782 1152 30195
-116 3177.782 3179.011 1229 31424
-133 3179.011 3180.265 1254 32678
-127 3180.265 3181.511 1246 33924
-118 3181.511 3182.723 1212 35136
-109 3182.723 3183.912 1189 36325
RAW POWER PANEL LIGHTING PANEL

Opening Closing Consum. Cumulative Opening Closing


24759 24765 6 6.0 137.248 137.264
24765 24775 10 16 137.264 137.307
24775 24786 11 27 137.307 137.349
24786 24798 12 39 137.349 137.395
24798 24810 12 51 137.395 137.440
24810 24821 11 62 137.440 137.487
24821 24828 7 69 137.487 137.509
24828 24835 7 76 137.509 137.528
24835 24846 11 87 137.528 137.578
24846 24853 7 94 137.578 137.639
24853 24861 8 102 137.639 137.684
24861 24868 7 109 137.684 137.733
24868 24876 8 117 137.733 137.778
24876 24879 3 120 137.778 137.793
24879 24882 3 123 137.793 137.826
24882 24890 8 131 137.826 137.871
24890 24900 10 141 137.871 137.921
24900 24908 8 149 137.921 137.970
24908 24917 9 158 137.970 138.021
24917 24926 9 167 138.021 138.072
24926 24930 4 171 138.072 138.093
24930 24932 2 173 138.093 138.111
24932 24941 9 182 138.111 138.162
24941 24949 8 190 138.162 138.210
24949 24959 10 200 138.210 138.267
24959 24962 3 203 138.267 138.288
24962 24971 9 212 138.288 138.331
24971 24974 3 215 138.331 138.351
24974 24977 3 218 138.351 138.365
24977 24987 10 228 138.365 138.423
24987 24996 9 237 138.423 138.488
GHTING PANEL W/S UPS O/G

Consum. Cumulative Opening Closing Consum. Cumulative


16 16 93.310 93.329 19 19
43 59 93.329 93.358 29 48
42 101 93.358 93.391 33 81
46 147 93.391 93.422 31 112
45 192 93.422 93.454 32 144
47 239 93.454 93.486 32 176
22 261 93.486 93.508 22 198
19 280 93.508 93.529 21 219
50 330 93.529 93.564 35 254
61 391 93.564 93.600 36 290
45 436 93.600 93.633 33 323
49 485 93.633 93.667 34 357
45 530 93.667 93.698 31 388
15 545 93.698 93.719 21 409
33 578 93.719 93.740 21 430
45 623 93.740 93.772 32 462
50 673 93.772 93.808 36 498
49 722 93.808 93.843 35 533
51 773 93.843 93.876 33 566
51 824 93.876 93.910 34 600
21 845 93.910 93.931 21 621
18 863 93.931 93.949 18 639
51 914 93.949 93.983 34 673
48 962 93.983 94.017 34 707
57 1019 94.017 94.052 35 742
21 1040 94.052 94.072 20 762
43 1083 94.072 94.104 32 794
20 1103 94.104 94.124 20 814
14 1117 94.124 94.144 20 834
58 1175 94.144 94.186 42 876
65 1240 94.186 94.217 31 907
Lab & Server UPS O/P Total Sub LAB
feeder Units
Opening Closing Consum. Cumulative Opening
4592.586 4594.056 1470 1470 2779 2244.068
4594.056 4595.462 1406 2876 2534 2244.824
4595.462 4596.938 1476 4352 2657 2245.555
4596.938 4598.392 1454 5806 2566 2246.294
4598.392 4599.855 1463 7269 2626 2247.022
4599.855 4601.349 1494 8763 2642 2247.754
4601.349 4602.815 1466 10229 2637 2248.501
4602.815 4604.280 1465 11694 2569 2249.235
4604.280 4605.738 1458 13152 2599 2249.968
4605.738 4607.225 1487 14639 2712 2250.698
4607.225 4608.805 1580 16219 2738 2251.477
4608.805 4610.364 1559 17778 2878 2252.281
4610.364 4611.946 1582 19360 2883 2253.076
4611.946 4613.547 1601 20961 2732 2253.889
4613.547 4615.180 1633 22594 2861 2254.690
4615.180 4616.764 1584 24178 2941 2255.509
4616.764 4618.350 1586 25764 2930 2256.301
4618.350 4619.966 1616 27380 2985 2257.096
4619.966 4621.573 1607 28987 2866 2257.905
4621.573 4623.166 1593 30580 2825 2258.740
4623.166 4624.772 1606 32186 2899 2259.599
4624.772 4626.391 1619 33805 2883 2260.447
4626.391 4628.037 1646 35451 2922 2261.282
4628.037 4629.663 1626 37077 2953 2262.141
4629.663 4631.387 1724 38801 3188 2262.984
4631.387 4632.882 1495 40296 2691 2263.900
4632.882 4634.506 1624 41920 2937 2264.695
4634.506 4636.140 1634 43554 2931 2265.542
4636.140 4637.741 1601 45155 2884 2266.360
4637.741 4639.378 1637 46792 2959 2267.162
4639.378 4640.974 1596 48388 2890 2267.983
LABPANEL A LABPANEL B

Closing Consum. Cumulative Opening Closing Consum.


2244.824 756 756 2179.815 2180.498 683
2245.555 731 1487 2180.498 2181.157 659
2246.294 739 2226 2181.157 2181.822 665
2247.022 728 2954 2181.822 2182.477 655
2247.754 732 3686 2182.477 2183.137 660
2248.501 747 4433 2183.137 2183.810 673
2249.235 734 5167 2183.810 2184.471 661
2249.968 733 5900 2184.471 2185.132 661
2250.698 730 6630 2185.132 2185.817 685
2251.477 779 7409 2185.817 2186.551 734
2252.281 804 8213 2186.551 2187.283 732
2253.076 795 9008 2187.283 2188.012 729
2253.889 813 9821 2188.012 2188.751 739
2254.690 801 10622 2188.751 2189.478 727
2255.509 819 11441 2189.478 2190.220 742
2256.301 792 12233 2190.220 2190.954 734
2257.096 795 13028 2190.954 2191.687 733
2257.905 809 13837 2191.687 2192.421 734
2258.740 835 14672 2192.421 2193.151 730
2259.599 859 15531 2193.151 2193.875 724
2260.447 848 16379 2193.875 2194.605 730
2261.282 835 17214 2194.605 2195.341 736
2262.141 859 18073 2195.341 2196.089 748
2262.984 843 18916 2196.089 2196.827 738
2263.900 916 19832 2196.827 2197.611 784
2264.695 795 20627 2197.611 2198.290 679
2265.542 847 21474 2198.290 2199.028 738
2266.360 818 22292 2199.028 2199.771 743
2267.162 802 23094 2199.771 2200.499 728
2267.983 821 23915 2200.499 2201.244 745
2268.782 799 24714 2201.244 2201.971 727
EL B BTU Chilled water Consumption

Cumulative Opening Closing Consum. Cumulative


683 676543 676543 0 0
1342 676543 676809 266 266
2007 676809 677071 262 528
2662 677071 677337 266 794
3322 677337 677560 223 1017
3995 677560 677811 251 1268
4656 677811 677811 0 1268
5317 677811 677811 0 1268
6002 677811 678038 227 1495
6736 678038 678206 168 1663
7468 678206 678344 138 1801
8197 678344 678471 127 1928
8936 678471 678594 123 2051
9663 678594 678594 0 2051
10405 678594 678594 0 2051
11139 678594 678747 153 2204
11872 678747 678889 142 2346
12606 678889 678966 77 2423
13336 678966 679139 173 2596
14060 679139 679342 203 2799
14790 679342 679342 0 2799
15526 679342 679342 0 2799
16274 679342 679544 202 3001
17012 679544 679686 142 3143
17796 679686 679927 241 3384
18475 679927 679927 0 3384
19213 679927 680061 134 3518
19956 680061 680061 0 3518
20684 680061 680061 0 3518
21429 680061 680272 211 3729
22156 680272 680514 242 3971
Date Main Incomer UPS & Transformers AC Panel Power Panel
1-Jan-2023 2594 -184 1268 6
2-Jan-2023 2467 -77 1046 10
3-Jan-2023 2526 -112 1095 11
4-Jan-2023 2503 -82 1023 12
5-Jan-2023 2542 -101 1074 12
6-Jan-2023 2583 -82 1058 11
7-Jan-2023 2577 -81 1120 7
8-Jan-2023 2527 -56 1057 7
9-Jan-2023 2583 -33 1045 11
10-Jan-2023 2695 -40 1121 7
11-Jan-2023 2648 -108 1072 8
12-Jan-2023 2763 -143 1229 7
13-Jan-2023 2789 -116 1217 8
14-Jan-2023 2687 -77 1092 3
15-Jan-2023 2760 -103 1171 3
16-Jan-2023 2793 -123 1272 8
17-Jan-2023 2834 -118 1248 10
18-Jan-2023 2841 -277 1277 8
19-Jan-2023 2843 75 1166 9
20-Jan-2023 2746 -98 1138 9
21-Jan-2023 2772 -120 1247 4
22-Jan-2023 2796 -106 1226 2
23-Jan-2023 2845 -94 1182 9
24-Jan-2023 2585 -105 1237 8
25-Jan-2023 2960 -136 1362 10
26-Jan-2023 2730 -95 1152 3
27-Jan-2023 2500 -116 1229 9
28-Jan-2023 2801 -133 1254 3
29-Jan-2023 2769 -127 1246 3
30-Jan-2023 2893 -118 1212 10
31-Jan-2023 2788 -109 1189 9
Lighting Panel UPS-W/S-O/G Lab & Server UPS O/P
16 19 1470
43 29 1406
42 33 1476
46 31 1454
45 32 1463
47 32 1494
22 22 1466
19 21 1465
50 35 1458
61 36 1487
45 33 1580
49 34 1559
45 31 1582
15 21 1601
33 21 1633
45 32 1584
50 36 1586
49 35 1616
51 33 1607
51 34 1593
21 21 1606
18 18 1619
51 34 1646
48 34 1626
57 35 1724
21 20 1495
43 32 1624
20 20 1634
14 20 1601
58 42 1637
65 31 1596
Housekeeping Service / January-2023
Sl. No. Description Location Status Remark
1 Wash room cleaning & Upkeep Ground Floor Completed
2 Meeting room cleaning & chair arranging Ground Floor Completed
3 AHU room cleaning Ground Floor Completed
4 Cleaning & Upkeep of Restroom Ground Floor Completed
5 Cleaning & Upkeep of Reception Area Ground Floor Completed
6 Printing machine cleaning & maintenance Ground Floor Completed
7 Pantry vending machine cleaning & maintenance Ground Floor Completed
8 Upkeep of Carpet area Ground Floor Completed
9 Workstation cleaning Ground Floor Completed
10 Garbage pickup Ground Floor Completed
11 Gym Room cleaning & upkeep Ground Floor Completed
12 BMS Room cleaning Ground Floor Completed
13 Plate & Spoon washing Ground Floor Completed
14 Pantry cleaning & upkeep Ground Floor Completed
15 Maintenance of the Stationary items Ground Floor Completed
Crockery Materials January-2023
Sl. No. Crockery Materials 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Spoons 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
2 Visitor Spoons 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
3 Lunch Plates 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91
4 Cups 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
5 Saucers 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
6 Serving Trays 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 Pantry Chairs 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
8 Pantry Tables 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
9 Snacks Plate 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
10 Serving Glass 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
11 Serving plates (Medium) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
12 Serving plates (Small) 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
13 Bowls(Medium) 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
14 Bowls(Small) 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
15 Bowl with Lid(Large) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ary-2023
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
24 24 24 24 24 24 24 24 24 24 24 24 24 24
11 11 11 11 11 11 11 11 11 11 11 11 11 11
91 91 91 91 91 91 91 91 91 91 91 91 91 91
9 9 9 9 9 9 9 9 9 9 9 9 9 9
18 18 18 18 18 18 18 18 18 18 18 18 18 18
1 1 1 1 1 1 1 1 1 1 1 1 1 1
16 16 16 16 16 16 16 16 16 16 16 16 16 16
4 4 4 4 4 4 4 4 4 4 4 4 4 4
11 11 11 11 11 11 11 11 11 11 11 11 11 11
8 8 8 8 8 8 8 8 8 8 8 8 8 8
5 5 5 5 5 5 5 5 5 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8 8 8 8 8 8
2 2 2 2 2 2 2 2 2 2 2 2 2 2