1. This document is a letter from Tech Ven Construction to Nikhat Electromechanical Services regarding a subcontracting project for the construction of a 132/33/11kV substation.
2. The project involves supplying and installing various grounding materials including copper wires, rods, and exothermic welding joints.
3. The letter includes a bill of quantities (BOQ) listing the materials, units, costs, and total prices for the project totaling 3,65,176.00 Taka.
1. This document is a letter from Tech Ven Construction to Nikhat Electromechanical Services regarding a subcontracting project for the construction of a 132/33/11kV substation.
2. The project involves supplying and installing various grounding materials including copper wires, rods, and exothermic welding joints.
3. The letter includes a bill of quantities (BOQ) listing the materials, units, costs, and total prices for the project totaling 3,65,176.00 Taka.
1. This document is a letter from Tech Ven Construction to Nikhat Electromechanical Services regarding a subcontracting project for the construction of a 132/33/11kV substation.
2. The project involves supplying and installing various grounding materials including copper wires, rods, and exothermic welding joints.
3. The letter includes a bill of quantities (BOQ) listing the materials, units, costs, and total prices for the project totaling 3,65,176.00 Taka.
c solder solder joint 0 Supply joint 2. Specification:“十”c ross welding and attached with vertical grounding pole 8 Exothermi 1. Name:Exothermic 8 Set 2,840.00 1,280.0 4,120.00 32,960.00 NEMS c solder solder joint 0 Supply joint 2. Specification::“T”cr oss with vertical grounding pole 9 Exothermic 1. Name:Exothermic 4 Set 2,040.0 816.0 2,856.00 11,424.00 NEMS solder joint solder joint 0 Supply 0 2. Specification: Right Angle ross with vertical grounding pole Total Tk 3,65,176.0 0
In Word: Three Lac Sixty Five Thousand One Hundred Seventy Six Taka
1. Physical work must start within
2. Date of Commencement 3. Duration of works: From the date of commencement ( As required) 4. All kinds of Material supply by Nikhat ( Tech Ven will supply above materials which mention in BOQ) 5. Water and electricity arrange by Tech Ven construction and labour accommodation arrange by Subcontractor 6. All kind of Local and Political Issues manage by Subcontractor. 7. All kind of Construction Equipment provide by Subcontractor 8. Subcontractor must have to work under supervision and instruction of Project engineer. 9. Works would be maintain as per site requirement from Project Engineer. 10. The quantity will be varied as per requirement and physical work done at site instructed by the Project Engineer 11. Quality of work would be as per specification of DPDC, TBEA and Consultant. 12. Subcontractor must complete all works according to attached BOQ and Drawing without any variation of contract price. If any change the quantity from the drawing that quantity and price will finalize by mutual negotiation. 13. Subcontractor are responsible to confirm the proper work of construction. Without confirming proper work your security money will be withhold and non-refundable. 14. Subcontractor are responsible to arrange work at site and Supply equipment at your own responsibilities. 15. Subcontractor must follow the construction law as per construction law of Tech Ven Construction. 16. Subcontractor are responsible to confirm the safety and security at construction site and construction peoples during the construction period. Tech Ven will not take any sort of responsibility in this regard. 17. Low quality equipment’s will not be accepted. All equipment’s must satisfy the standards & code and approved by the Engineer of Tech Ven Construction. 18. Payment mode will be negotiable with subcontractor and Tech Ven Construction. And full payment will be pay 10 days of completion. 19. Responsibility of any unspecified work belongs to Subcontractor in that case he should rectify the work as per specification.