Contenido
1. Dam Ring
2. Sistema de Inyección de Agua
3. Descarga del Rechazo
4. Factor de Prehidratación
1. Dam Ring
Take care of the wear
(Atención al desgaste)
In the raw mill operation a capacity drop
Possible Potential additional was observed with increasing table wear.
problems symptoms The necessary dam ring reduction can
Too high dam ring ▪ High bed depth helping to incasing the capacity.
▪ Increased power absorption After replacement of table liner to the
(reduction of pressure required) original thickness, we can observed a
▪ Reduced comminution efficiency significant increasing in mill capacity.
(lower production) Adjust the dam ring according to table
▪ Vibrations wear in order to maintain optimal
material retention and bed depth!
Too low dam ring ▪ Low bed depth
▪ Vibrations
▪ Increased water demand
▪ Low power absorption of main
drive
▪ Lower production
2. Sistema de Inyección de
Agua
Position of the pipe, nozzles and angle
(Posición de la tubería, boquillas y ángulo)
Water Injection Nozzle
We need to improve the position of pipe and the number of nozzles, outlet directed vertically to
material bed Situated close to roller and material bed covering most of the roller width, Water
injection <3% from total feed.
Water Injection Nozzle VCM1 Water Injection Nozzle VCM2
Water Injection Nozzle not Optimised
3. Descarga del Rechazo
Optimize the cone extension
(Optimizar la extensión del cono)
Before After
Material
75 cm
50 :60cm
4. Factor de Prehidratación
Increase gypsum dehydration inside the mill
(Incrementar deshidratación
del yeso en el molino)
Prehydration Factor
•This factor called prehydration factor "corrected
loss-on-ignition" Wk is calculated as
Wk [%]= LOI (450C) - LOI (120C)
Pre-hydration of the clinker minerals can occur :
I) as a result of incorrect internal water cooling in the
cement mill.