YORK® YK Chiller
The fastest
chiller restart after
power failure
Coastdown* = 60 seconds
Timeline from loss of power
OptiSpeed
OptiView Chiller control panel reboot Precharge =
= 30 seconds 25 seconds
Power
With UPS
failure
Coastdown* = 60 seconds
OptiSpeed
Precharge =
25 seconds Figure 3: Time to return to full load capacity for 300-ton (1055 kW)
YK chiller.
*Coastdown time for a 300-ton (1055kW) chiller
Proven performance
Figure 1: Required steps when power interruption occurs with With over 500 Quick Start installations in the field, you get the
and without UPS on a YK chiller. peace of mind knowing your chillers — and your operation — can be
protected from the consequences of power failure by Johnson
Controls.
Rapidly bringing the chiller back to pre-power failure A performance test can be requested to witness restart times and
operating capacity capacity recovery times for your specific chiller, capacity operation,
and length of power failure. Performance tests, requested in
advance, are held at the Johnson Controls Water-Cooled Chiller
The quick start feature not only minimizes chiller restart Performance Test Facility and Customer Care center in San Antonio,
time as compared to a standard chiller without this Quick Start Texas alongside our Water-Cooled chiller manufacturing facility.
feature (see Figure 2), but also reduces the time to get back to full
load capacity (see Figure 3). For details on how the Quick Start feature can protect your
application, contact your nearby Johnson Controls sales office today